ID Date Author Subjectdown Text Attachments
  79   Sun, 31.07.2011 05:19:39 sandrotrigger counters settingscounter   HV     thr.   comments
S1        2200   170    KFKI disc
S2        2000   50     KFKI disc
  
  48   Sat, 27.11.2010 07:31:14 Gazdzicki, Stroebelethe first fragementation test of 13A GeV/c Pb beamWe start the fragmentation test of Pb beam
at 13A GeV/c
-------------------------------------------------------
 id48-2010-11-27-074415.pngid48-2010-11-27-093559.pngid48-2010-11-27-074203.png 
  365   Sat, 28.06.2025 15:52:43 Paweltarget scanTarget scan was performed:
Estimated carbon target position: -17 mm
Estimated H2O target position: 33 mm
  
  73   Tue, 7.12.2010 18:13:10 Z. Fodors1 counterS11 - saleve side down
S12 - Saleve side up
S13 - jura side up
  
  37   Sat, 4.09.2010 17:55:06 Zoltan Fodorreplacement of the TRIGGER unit of CAMAC readoutThe Tigger unit could not be reset, always
stucks in busy.
Funy, puting in an other NIM crate works
  
  129   Fri, 29.06.2012 09:26:00 R.Planetaposition of S2position of S2 changed from 87.1 to 82.9 (4.2
mm down)
  
  167   Tue, 2.10.2012 14:16:27 A.Aduszkiewiczno helium between VT2 and MTWe realised that the aquarium ("sac") between
VTPC2 and MTPC hut was not filled with helium
before this (p+Pb) run. We decided to leave
  
  178   Tue, 4.12.2012 13:50:29 Zoltan Fodormeasurements of the time of beam countersI checked on the QA the counter histograms,
and realized the missing time information
for S11-S12 ans S11-S2.
  
  122   Wed, 20.06.2012 18:04:57 A. Marcinekcounter HVSet HV of counters:
S4 1920V
V0 1920V
  
  64   Sat, 4.12.2010 23:43:09 A. Wilczekcontinuation of the afternoon shiftOnly 14 attachments could be provided by our
software.
23:45 (awilczek) Z-detector turned off.
  
  323   Mon, 4.07.2022 01:20:05 K.Sakashita, Y. Nagaibeam parameters for 31GeV/c run 2022three files attached. 

 * all the XSCI were moved out to minimize
 CESAR_GUI_9.7.3_04-Jul-22_01-19-44.pngCESAR_GUI_9.7.3_04-Jul-22_01-19-11.pngCESAR_GUI_9.7.3_04-Jul-22_01-17-42.png 
  108   Tue, 15.11.2011 04:29:21 S.KowalskiZdet delay[sk] -. add delay to sum of Zdet signal, order
in ADC sum  19, pmt1, 20, pmt2 21, sum with
delay 22
  
  101   Wed, 9.11.2011 21:25:37 Seweryn KowalskiZ-det ADC ChannelsZ-det: Crate 17-8, slot 9, channel 7 - gas,
8 - quartz1, 9 - quartz2
Checktestbeam: channels: 19,20,21
  
  197   Mon, 14.01.2013 23:07:23 S. PulawskiZ detector (after today operations)Today I concluded that signal is too small
and I decide to make one more check of Z
counter. 
 id197-2013-01-14-230956.png 
  192   Fri, 11.01.2013 19:41:29 S. PulawskiZ det treshholdNew Tresholds:
Q1 =-1.26 V
Q2= -2.5 V
  
  190   Fri, 11.01.2013 08:16:32 S. PulawskiZ det - recover and HV settingsYesterday was find that only one PMT is working
in Z detector. Today it was checked and looks
like accidentally somebody catch the cable
  
  99   Wed, 9.11.2011 14:06:01 S, KowalskiZ detThe quartz Z0det was installed on the position.
The 2 singals was send to the ACQ. 
We finished the test with LED.
  
  174   Mon, 3.12.2012 10:54:38 S. KowalskiZ DetQuartz Z Det on beam position. HV for ZdetQ1
2000 V, ZdetQ2 1910
  
  143   Mon, 30.07.2012 13:52:55 Z. FodorWarning up VTX1 magnetStarting from 26.07.2012 we measured the resistance
of the magnet using 10A generator, and the
the measured voltage drop on the coil it
  
  150   Tue, 21.08.2012 14:40:29 A.LaszloVTX1 top insulator box closedThe VTX1 top insulator box (where current
leads connect to) has been closed.
The connector piece to replace the leaking
  
  153   Mon, 17.09.2012 10:19:40 A.LaszloVTX1 testS4 was put in 160GeV/c position.
Magnet area was cleared.
Magnet power supply switched on.
  
  236   Fri, 6.02.2015 16:00:52 Z.FodorVTX1 power problem, dismount LMPD15:00 VTX1 Low Voltage rack could not be powered.   
  151   Fri, 24.08.2012 16:29:23 A.LaszloVTX1 magnet leak welded, box closedVTX1 magnet joint was welded and brazed in
place.
Leak test with He detector performed.
  
  133   Thu, 5.07.2012 16:06:19 A.LaszloVTX1 magnetAlexei Dudarev found some contact person who
seem to have docs: Fernando Cataneo
  
  302   Sun, 14.11.2021 17:31:17 P. Podlaski, W. BrylinskiVTPCs and FTPCs sampling rate scan
- run : 279:
number of samples per channel:   700 
  
  298   Thu, 28.10.2021 18:56:31 P. PodlaskiVTPCs HV status (first restart after LS2)amplification voltage/drift voltage

[TABLE border="0" cellspacing="10"] 
  
  204   Mon, 21.01.2013 17:44:34 A.LaszloVTPC1 FEE cooling problem and repairVTPC1 FEE cooling system seems to be repaired
by Stefan Berry. He said that filter was
blocked which broke the vacuum pump. He removed
  
  297   Sat, 28.08.2021 09:48:28 BR, MK, MUVTPC1 FEC Final Cable InstallationFECs tested row-by-row & connectors glued
in place.
  
  28   Thu, 12.08.2010 12:39:45 A. AduszkiewiczVTPC-2 sectors 3,5,6 down and upTurned off the voltages in VTPC-2 sectors
3,5 and 6 for Andras' tests, then turned
them back up.
  
  280   Thu, 17.08.2017 11:37:34 Z. Fodor, P. PodlaskiVTPC-2 sector 2 issues    
  267   Mon, 5.09.2016 12:25:33 A.AduszkiewiczVTPC-2 sector 2 amp meterVTPC-2 sector 2 current meter appears to be
broken.
  
  89   Mon, 5.09.2011 10:05:26 W. DominikVTPC-2 noise oscillations understood!From the beginning of the restart after the
long MD a noise (oscillations) in the VTPC-2
sector 3 were observed. The reason was not
  
  218   Thu, 18.09.2014 14:18:59 A.AduszkiewiczVTPC-2 HVIn the night (4AM) the currents in VTPC-2
increased to 80nA (sector 1). We decreased
HV by 200V. It didn't help much.
  
  126   Mon, 25.06.2012 17:45:38 A.AduszkiewiczVTPC-1 voltage reduction for Kr calibrationNominal voltage: 1210/1180V
Reduced to: 1130/1120V
  
  246   Mon, 2.03.2015 15:10:31 A. AduszkiewiczVTPC-1 LV interlockThe temperature of the VTPC-1 LV interlock
jumped up around 2AM, and then it was increasing
slowly. As we  already had problems with
 id246-2015-03-02-151218.png 
  296   Thu, 29.07.2021 11:38:11 PP BRVTPC-1 FEE testsA: 18 94 35 32 34 36
AB: 41 42 33 13 37 31
 RCU37Bad.pngRCU37Good.png 
  140   Tue, 24.07.2012 17:46:26 A.AduszkiewiczVTPC and GTPC voltages increasing[TABLE border="0" cellspacing="10"]
 |VTPC-1 drift | VTPC-1 HV | VTPC-2 drift
| VTPC-2 HV |GAP TPC drift | GAP TPC HV|
 id140-2012-07-24-174537.png 
  90   Mon, 5.09.2011 11:58:55 W. DominikVT-2 noise fighting - story continuesDuring the SPS break an attempt to cure the
noise (oscillations) in the sectors 1 and
6. Action: 
  
  228   Tue, 4.11.2014 11:23:57 Z.FodorV1 position set
V1 position is aligned.
New value of the center is x=76.3 on the
  
  124   Sat, 23.06.2012 10:37:05 A. MarcinekV12012.06.23 10:07:38 (AM) Switched off the
V1 HV, since according to TRIM scan, it didn't
give the signal. Maybe the cable is disconnected.
  
  333   Fri, 4.11.2022 10:51:08 P. Podlaski, W. BrylinskiTuning GG timing for Kr data-taking    
  142   Thu, 26.07.2012 23:14:28 Oskar WyszynskiTrigger settings for USA NA61 measurement- voltage of S4 PMT increased to 2000v
- current of VTX-2 decreased to 3500A
- added amplifier to S4
  
  249   Sat, 21.03.2015 22:31:57 T.CzopowiczTrigger ratios in DB (and java monitor)Trigger ratios (T4/T1 and T2/T1) added to
the DCS database.
They can be monitored via the java monitor
  
  225   Fri, 31.10.2014 19:55:07 O. WyszynskiThresholds and Voltageshttps://na61elog.cern.ch/Trigger+logbook/38   
  181   Tue, 4.12.2012 20:12:09 S. KowalskiTh for ZdetSet threshold for Zdet Z2=-1.35, Z3=-3.64   
  58   Wed, 1.12.2010 00:50:35 A. Sadovsky, S. PulawskiTest: 18cm Be target + with 4cm Cu degrader. COLL12 scan.01:52 (Andras Laszlo): Added S11 signal to
channel 4 of MTDC without gating.
* RUNCONTROL[2010.12.01-02:07:13]: Stop of
 id58-2010-12-01-034855.pngid58-2010-12-01-044236.pngid58-2010-12-01-082830.png 
  52   Mon, 29.11.2010 20:50:02 O.Petukhov, A. WilczekTest with degrader and collimator_12=(-1.0 - +0.5) . Z-detector new configuration
* RUNCONTROL[2010.11.29-20:50:22]: Startup
of run 013398 with success. Target: None.
 id52-2010-11-29-230501.pngid52-2010-11-29-230511.pngid52-2010-11-30-004044.png 
  254   Tue, 8.09.2015 14:36:38 E. KapturTest of the Beam CountersOld S1 and old S2 are installed.

All of the beam counters see the signal from
  
  53   Tue, 30.11.2010 05:46:09 S.Pulawski, A.SadovskyTest degreader 1cm Cu. waering colimators to find C11 position -25.06 +40.00 (25.0e11/1.54e3 + 21.0e11/1.28e3
+ 21.4e11/1.36e3)/3.
-20.06 +40.02 (24.0e11/1.53e3 + 22.0e11/1.37e3
  
  54   Tue, 30.11.2010 06:16:28 A. Sadovsky, S. Pulawski, N.Katrynska, M. GazdzickiTest degreader 1cm Cu. varing colimators to find C11 position -40.08 +35.04 (1.65e3/26.6e11 + 1.72e3/27.9e11
+ 1.59e3/25.0e11 + 1.71e3/27.8e11 + 1.66e3/26.4)/5.
-39.96 +30.06 (24.8e11/1.51e3 + 26.0e11/1.62e3
 Tgraphs.png407.png417.png427.png 
  17   Mon, 26.07.2010 14:32:39 Roman PlanetaTest31 GeV beam  id17-2010-07-26-143406.png 
  60   Fri, 3.12.2010 00:30:40 A.Sadovsky, A. WilczekTest
* RUNCONTROL[2010.12.03-00:53:05]: Pedestal
run 013486 was successful.
 8x 
  224   Wed, 29.10.2014 11:54:24 A.AduszkiewiczTemperature sensorsIn the MTPC hut, the temperature in all sensors
showed around 21 degree Celsius, except of
MTPC-R Jura and MTPC-L Saleve. We realised
  
  165   Sat, 29.09.2012 17:14:38 Zoltan FodorTemperature in the MTPC hutAfter increasing the chield water flow, the
temperature going too low and instable.
On the climat unit 16 degree was set, now
  
  152   Mon, 17.09.2012 10:18:38 A.LaszloTarget holder change to LMPDOn 14 Septermber 2012 we removed VTX1 magnet
scaffolding. Small He leak is seen since
13 September, but leak rate is stable.
  
  155   Tue, 18.09.2012 17:51:56 A.LaszloTarget alignmentLMPD target was installed and aligned to nominal
position +/-0.5mm, and measured.
BPD3 was put to nominal position by eye and
  
  5   Tue, 13.07.2010 18:04:23 A. LaszloTPC, T0, T-offset - New relative T0 calibration with pulser
is possible within full detector except GTPC
with 512 time bin mode with run 10363.
  
  2   Wed, 2.06.2010 14:35:46 A. LaszloTPC, T0, T-offset- Relative T0 calibration is possibble within
individual TPC volumes with pulser calibration
data. This was recorded for all TPC-s, except
  
  320   Thu, 30.06.2022 11:20:51 WB, PPTPC zero suppression threshold scanThu, 30.06.2022 11:19:53  TPC zero suppression
threshold:
- 40154: threshold: 1
  
  24   Wed, 11.08.2010 16:03:53 A. AduszkiewiczTPC voltages down by 50VReduced the TPC voltages by 50V for the tests
with beam in the TPC. The voltages set up
to now were:
  
  172   Tue, 27.11.2012 12:54:35 A.AduszkiewiczTPC voltage ramping up statusamplification voltage/drift voltage
[TABLE border="0" cellspacing="10"]
      | VTPC-1   |  VTPC-2  |  MTPC-L  |
  
  188   Tue, 8.01.2013 11:00:06 A.AduszkiewiczTPC voltage ramping up statusamplification voltage/drift voltage
[TABLE border="0" cellspacing="10"]
      | VTPC-1   |  VTPC-2  |  MTPC-L  |
  
  8   Fri, 23.07.2010 11:41:00 Marek KirejczykTPC voltage raisedPotential voltage on all TPCs raised to 750V   
  11   Fri, 23.07.2010 23:50:26 M.KirejczykTPC voltageVoltages on all xTPC sectors set to 850V,
including tripped one.
  
  376   Tue, 11.08.2026 16:48:37 Barnabas Porfy, Tomek KowalskiTPC tests + VD testsWe are trying to find signal in trigger jitter.

We switched VTPC-1 trigger optic cable to
 printscreen_376_20260811-164935.png 
  31   Mon, 23.08.2010 03:26:02 Andras LaszloTPC readout Low Voltage failureThe power supply card LV64 produced -8V on
its -2V output. This caused errorneous jumper
settings (this is how the problem was discovered).
  
  305   Sat, 21.05.2022 23:19:08 PP WBTPC rate testsFull MTPC+VTPC:

  
  171   Mon, 8.10.2012 08:19:05 A.LaszloTPC potential strips were off for the whole runA,Aduszkiewicz found that all the potential
strips were off for the whole Autumn p+Pb
run.
 id171-2012-10-08-082232.pngid171-2012-10-08-084436.png 
  7   Fri, 23.07.2010 00:11:49 MKirTPC pot. voltagesTPC potential voltages, as decoded from the
old log-book:
VTPC 1, sectors 1&4: 1210V;
  
  10   Fri, 23.07.2010 18:23:51 M.KirejczykTPC pot. voltagesAll TPC pot. voltages (but one) raised to
800V.
MTPC L, sec 13 tripped, now being raised
  
  96   Mon, 7.11.2011 11:39:35 A.Laszlo, S.PulawskiTPC pedestal oscillation observed again, now in full VTPC2-Sector6See: https://na61db.cern.ch:8443/elog/DAQ+logbook/11   
  95   Sat, 5.11.2011 18:45:41 A. AduszkiewiczTPC drift voltage 5kVI increased TPC drift voltage to 5kV.

I realised that in the GAP TPC there is no
  
  94   Fri, 4.11.2011 17:04:52 A. AduszkiewiczTPC drift voltage 1kVSet the TPC drift voltage to 1kV.

The reason for the problems with switching
  
  93   Wed, 2.11.2011 16:29:11 A.AduszkiewiczTPC drift voltageThe TPC drift voltage is set to 5kV in all
5 TPCs.
  
  22   Sun, 1.08.2010 18:11:23 Andras LaszloTPC clock and trigger ECL cablesMany DAQ crashes were encountered. Therefore,
I applied contact spray to the ECL cable
connectors of clock and trigger cables. 2
  
  295   Fri, 9.07.2021 12:01:56 PP AL WBTPC adapter noise testsFri,  9.07.2021 12:02:59 Everything connected,
GG a calib. pulser terminated with 50 ohm
- RMS noise @ 1.75 (inner channels) - 2.3
  
  301   Sat, 13.11.2021 17:35:48 B. Rumberger, P. Podlaski, W. BrylinskiTPC Voltage ScanSense wire voltage scan. Beginning at nominal
voltage and incrementing by 10 V. Run numbers
& currents will be noted.
  
  363   Wed, 25.06.2025 13:11:05 A. Dmitriev, V. OzvenchukTPC High Voltage for 2025 O+O run (small TPCs) [TABLE border="0" cellspacing="10"] 

|  FTPC-1 |  FTPC-2  |  FTPC-3  | GTPC |
  
  362   Mon, 23.06.2025 14:01:56 A. Dmitriev, V. OzvenchukTPC High Voltage for 2025 O+O run (big TPCs + GRC)[TABLE border="0" cellspacing="10"] 
                          |  VTPC-1 |  VTPC-2
 |  MTPC-L  | MTPC-R   | GRC-1 | |-
  
  357   Wed, 4.06.2025 19:59:38 A. Dmitriev, V. Ozvenchuk, R. NagyTPC High Voltage for 2025 Neutrino runs[TABLE border="0" cellspacing="10"] 
                          |   LTT   |  VTPC-1
| Gap TPC   | VTPC-2   |  FTPC-1   | MTPC-L
  
  352   Fri, 18.10.2024 15:07:03 B. LyonTPC High Voltage for 2024 pi+C and Pb runs[TABLE border="0" cellspacing="10"] 
                  |   VTPC-1  |  Gap TPC
 |  VTPC-2  |  FTPC 1  |  MTPC-L |  MTPC-R
  
  74   Fri, 10.06.2011 14:53:29 A. AduszkiewiczTPC HV upSince yesterday evening we're slowly increasing
chamber voltage. Now at 900V in VTPCs and
800/900V in MTPCs.
  
  25   Wed, 11.08.2010 19:05:26 A. AduszkiewiczTPC HV trippedAlmost all TPC sectors tripped, except of
VTPC-1 sectors 4 and 5, and some sectors
in MTPC-R. BPDs tripped also.
  
  266   Sun, 4.09.2016 11:27:35 M. Kuich, A.AduszkiewiczTPC HV status.amplification voltage/drift voltage

[TABLE border="0" cellspacing="10"] 
  
  273   Thu, 15.06.2017 19:01:42 M. Kuich, P. PodlaskiTPC HV status.amplification voltage/drift voltage

[TABLE border="0" cellspacing="10"] 
 11x 
  104   Fri, 11.11.2011 02:43:25 A. AduszkiewiczTPC HV statusChamber voltages are 30V below the nominal
value. I'm afraid to go higher, since I have
no tool to verify the results (DAQ crashes
  
  217   Mon, 8.09.2014 18:13:44 A.Aduszkiewicz, M.KuichTPC HV statusamplification voltage/drift voltage

[TABLE border="0" cellspacing="10"]
  
  222   Sun, 26.10.2014 14:50:19 A.Aduszkiewicz, M.KuichTPC HV statusamplification voltage/drift voltage

[TABLE border="0" cellspacing="10"]
 b4KrGTPC.png 
  235   Tue, 3.02.2015 18:43:06 M. Kuich, T. Czopowicz, A.AduszkiewiczTPC HV statusamplification voltage/drift voltage

[TABLE border="0" cellspacing="10"] 
  
  252   Tue, 1.09.2015 15:44:38 M. KuichTPC HV statusamplification voltage/drift voltage

[TABLE border="0" cellspacing="10"] 
  
  259   Sun, 15.11.2015 15:37:28 A.Aduszkiewicz, M. KuichTPC HV statusamplification voltage/drift voltage

[TABLE border="0" cellspacing="10"] 
 printscreen_259_20151130-081547.png 
  263   Sat, 2.07.2016 14:08:19 A.Aduszkiewicz, M. KuichTPC HV statusamplification voltage/drift voltage

[TABLE border="0" cellspacing="10"] 
 11x 
  371   Wed, 11.03.2026 21:40:55 B. LyonTPC HV settings for 2026 p+p run[TABLE border="0" cellspacing="10"] 
                  |   VTPC-1  |  Gap TPC
 |  VTPC-2  |  FTPC 1  |  MTPC-L |  MTPC-R
  
  374   Wed, 8.07.2026 15:39:06 V.OzvenchukTPC HV settings for 2026 neutrino run                             VTPC-1       
      Gap TPC          VTPC-2          FTPC
1          MTPC-L                     MTPC-R
  
  145   Mon, 6.08.2012 08:43:42 A.AduszkiewiczTPC HV setting summer 2012Wire voltages in the attachment.

Drift voltages:
 id145-2012-08-06-084247.png 
  319   Wed, 29.06.2022 22:48:07 P. PodlaskiTPC HV scanWed, 29.06.2022 22:48:08 Started TPC HV scan.

  
  121   Tue, 19.06.2012 11:11:50 A.AduszkiewiczTPC HV ramping upamplification voltage/drift voltage
[TABLE border="0" cellspacing="10"]
      | VTPC-1   |  VTPC-2  |  MTPC-L  |
  
  213   Tue, 10.12.2013 15:13:02 M. KuichTPC HV module replacedTPC HV CAEN module No 4. replaced. Borrowed
module will be returned to Pool. NA61 module
is installed.
  
  125   Sat, 23.06.2012 19:29:26 A.AduszkiewiczTPC HV fullThe setting is:
VTPC-1 1210/1180V
VTPC-2 1060V
  
  180   Tue, 4.12.2012 17:54:40 A.AduszkiewiczTPC HV fullVoltage setting, not yet tested with the beam.  id180-2012-12-04-175444.png 