Message ID: 60     Entry time: Fri, 3.12.2010 00:30:40
Author: A.Sadovsky, A. Wilczek 
Subject: Test 

* RUNCONTROL[2010.12.03-00:53:05]: Pedestal run 013486 was successful.
* RUNCONTROL[2010.12.03-00:55:57]: Startup of run 013486 with success. Target: None.
* RUNCONTROL[2010.12.03-02:58:28]: Stop of run 013486 with success. Number of events: 55753.
* RUNCONTROL[2010.12.03-03:00:25]: Pedestal run 013487 was successful.

Ilias is tuning the beam line, magnet configuration 1

* RUNCONTROL[2010.12.03-03:14:45]: Startup of run 013488 with success. Target: None.
* RUNCONTROL[2010.12.03-03:21:03]: Stop of run 013488 with success. Number of events: 3038.
* RUNCONTROL[2010.12.03-03:22:44]: Pedestal run 013489 was successful.

we load now H2A.999 (the one we used on December 1, 2010 in the night) instead of H2A.994



* RUNCONTROL[2010.12.03-03:22:52]: Startup of run 013489 with success. Target: None.
* RUNCONTROL[2010.12.03-03:24:40]: Stop of run 013489 with success. Number of events: 611.
* RUNCONTROL[2010.12.03-03:30:30]: Pedestal run 013490 was successful.
* RUNCONTROL[2010.12.03-03:43:36]: Startup of run 013491 with success. Target: None.
* RUNCONTROL[2010.12.03-03:54:04]: Stop of run 013491 with success. Number of events: 5106.

configuration 2


* RUNCONTROL[2010.12.03-03:54:55]: Startup of run 013492 with success. Target: None.
* RUNCONTROL[2010.12.03-04:04:16]: Stop of run 013493 with success. Number of events: 3637.


configuration 3
18 cm Be target
no degreder
nominal currents


* RUNCONTROL[2010.12.03-04:24:24]: Startup of run 013494 with success. Target: None.
* RUNCONTROL[2010.12.03-04:31:50]: Stop of run 013494 with success. Number of events: 3184.

configuration 4
current p = 13.89 GeV/c/n
* RUNCONTROL[2010.12.03-04:59:16]: Stop of run 013495 with success. Number of events: 6277.

config 4 but low intensity (32k per spill)
* RUNCONTROL[2010.12.03-05:05:47]: Startup of run 013496 with success. Target: None.

config 5
Z/A = 0.5
no degrader


* RUNCONTROL[2010.12.03-05:57:19]: Startup of run 013497 with success. Target: None.
* RUNCONTROL[2010.12.03-06:07:59]: Stop of run 013497 with success. Number of events: 4180.
* RUNCONTROL[2010.12.03-06:14:56]: Pedestal run 013498 was successful.

From 06:15 stopped improvements attempts and took some known working condition (similat to the one on 01/12/2010) and just getting statistics.

* RUNCONTROL[2010.12.03-06:16:39]: Startup of run 013498 with success. Target: None.
* RUNCONTROL[2010.12.03-08:19:17]: Stop of run 013498 with success. Number of events: 40697.
Attachment 1: id60-2010-12-03-035753.png  395 kB  Uploaded Fri, 3.12.2010 04:04:04  | Hide | Hide all
id60-2010-12-03-035753.png
Attachment 2: id60-2010-12-03-035726.png  121 kB  Uploaded Fri, 3.12.2010 04:25:39  | Hide | Hide all
id60-2010-12-03-035726.png
Attachment 3: id60-2010-12-03-043201.png  395 kB  Uploaded Fri, 3.12.2010 04:32:06  | Hide | Hide all
id60-2010-12-03-043201.png
Attachment 4: id60-2010-12-03-043210.png  129 kB  Uploaded Fri, 3.12.2010 04:32:18  | Hide | Hide all
id60-2010-12-03-043210.png
Attachment 5: id60-2010-12-03-045136.png  421 kB  Uploaded Fri, 3.12.2010 04:51:40  | Hide | Hide all
id60-2010-12-03-045136.png
Attachment 6: id60-2010-12-03-045146.png  125 kB  Uploaded Fri, 3.12.2010 04:51:52  | Hide | Hide all
id60-2010-12-03-045146.png
Attachment 7: id60-2010-12-03-052441.png  396 kB  Uploaded Fri, 3.12.2010 05:24:46  | Hide | Hide all
id60-2010-12-03-052441.png
Attachment 8: id60-2010-12-03-052449.png  133 kB  Uploaded Fri, 3.12.2010 05:24:55  | Hide | Hide all
id60-2010-12-03-052449.png
ELOG V3.1.3-7933898