This is NA61/SHINE electronic logbook (read-only BACKUP!)

Run summary Shift logbook Run settings Beam logbook BPD logbook DAQ logbook DCS logbook Experts logbook Gas logbook TOF logbook Trigger logbook PSD logbook VD logbook Run coordination Detector Upgrade DRS logbook
  Logbook for all experts' activities, Page 2 of 4  NA61/SHINE logo
ID Date Author Subjectdown Text Attachments
  98   Tue, 8.11.2011 12:32:12 A.AduszkiewiczTPC HV drift and chambersThe drift voltage has been set to the nominal
value in all TPCs:
VTPC-1:  13000V
  
  75   Sat, 11.06.2011 00:33:37 A. AduszkiewiczTPC HV almost fullVTPC-1 1050V
VTPC-2 1000V
MTPC SR 1000V
  
  369   Tue, 28.10.2025 20:08:28 B. LyonTPC HV Settings for p+p 300GeV/c run and Pb+Pb run (with GRC)[TABLE border="0" cellspacing="10"] 
                  |   VTPC-1  |  Gap TPC
 |  VTPC-2  |  FTPC 1  |  MTPC-L |  MTPC-R
  
  100   Wed, 9.11.2011 18:36:56 A. AduszkiewiczTPC HVChamber voltages are now 100V below the nominal
values. Currents are low.
  
  110   Wed, 16.11.2011 14:52:19 A. AduszkiewiczTPC HVToday, testing with the beam on, the HV in
the GAP TPC has been increased to the nominal
value. It could be still too low, since the
  
  265   Tue, 26.07.2016 13:14:00 A.Aduszkiewicz, M.KumaraTPC HV scan26.07.2016 16:24:33 HV reference values: http://na61-elog.cern.ch/Experts+logbook/160726_132831/printscreen_265_20160726-132821.png

26.07.2016 16:26:25 HV -30V setting: http://na61-elog.cern.ch/Experts+logbook/160726_162601/printscreen_265_20160726-162551.png
 7x 
  177   Mon, 3.12.2012 18:14:48 D.JokovicTOF status at the start of Be run https://na61db.cern.ch:8443/elog/TOF+logbook/12   
  164   Tue, 25.09.2012 21:01:58 Zoltan FodorTOF readout problemThe TOF read out crashed, could not initialize
the create No5. 
Reconnected the VSBI bus in the old configuration.
  
  18   Mon, 26.07.2010 21:00:05 N.AbgrallTOF dataStarting to take data for forward TOF calibration.
HV is set to 2009 values to start with.
Goal is to check ADC spectra over the 160
  
  161   Fri, 21.09.2012 13:16:10 D.JokovicTOF HV status at the start of p+Pb runOn TOF-R, the distributors #1.1, #1.2 & #1.3
in the crate 1 didn't work. High voltage
for those PMTs supplied by new, custom made
  
  316   Tue, 28.06.2022 18:51:55 Kamil W.THC scan for protons (30 GeV/c T2K)
Wed, 29.06.2022 07:55:51 THC full scan complete
and attached.
 8x 
  315   Tue, 28.06.2022 16:59:00 Kamil W.THC scanLow pressure range scan  CESAR_GUI_9.7.3_28-Jun-22_16-59-33.png 
  311   Sun, 26.06.2022 13:54:33 K.SakashitaT2K target installation work on June 25- Tightened fixing screws of the side support
bar since it was found that these screws
were not so tight. In order to reduce possibility
 IMG_3743.jpegIMG_1652.jpeg 
  310   Sun, 26.06.2022 13:42:52 K.SakashitaT2K target installation work on June 24- install T2K replica target. We installed
the label "C".  
- adjusted the position of S3 in order to
  
  309   Sun, 26.06.2022 12:57:43 K.SakashitaT2K target installation work on June 23- GEM-BPD was installed after adjusting the
position of the concrete block
- Modify the position fixing parts of the
 IMG_9508.jpegImage_from_iOS_(4).jpg 
  307   Wed, 22.06.2022 19:16:57 K.SakashitaT2K target installation workK.Sakashita, Y.Nagai, H.Kitagawa, Y.Shiraishi

 IMG_4976.jpegIMG_4975.jpeg 
  324   Tue, 5.07.2022 12:24:02 K. WojcikT2K run S4 position scanTue,  5.07.2022 12:24:43 Horizontal S4 scan.
Set nominal current for TRIM.021.492 : -4.1
A. DID NOT change the magnet current (-3.7
 8x 
  329   Wed, 20.07.2022 11:02:29 W. BrylinskiT2K run - pulser callibration dataRun list:
- 40737 - pulser data, default configuration
(glitch filter off)
  
  34   Thu, 26.08.2010 17:40:08 Andras Laszlo, Zoltan FodorT1, T4 scaling factors- Changed T1 scaling factor to 1000.
- Changed T4 scaling factor to 40.
  
  1   Fri, 28.05.2010 19:22:18 Z. Fodor, A. LaszloT0, timing, busy logic- Because of the new 12bit prescale facility,
MT is late to S11 with additional 11ns at
the busy logic crate.
  
  106   Sat, 12.11.2011 19:57:26 Z.Fodor, A.LaszloT0 changeSee: https://na61db.cern.ch:8443/elog/DAQ+logbook/15   
  274   Thu, 6.07.2017 22:55:24 Z.Fodor, A.LaszloStarting FTPC conditioning21:48 (A.Laszlo):
Pulser data: run 28530
Empty events: run 28531
  
  113   Sat, 19.11.2011 19:48:50 S. PulawskiSignal cabel of Z get sum.Connected back to ADC. Not reason to be unconnected
earlier.
  
  227   Mon, 3.11.2014 11:32:46 Z. Fodor, A.LaszloSensor of water temperatureStephan Berry opened one valve on the HR cooling
waters. 
10:40 The sensor fixed to the tube on the
  
  195   Sun, 13.01.2013 22:29:05 S. PulawskiScan Be/All depend of trigger settings.Scan was made on standalone DAQ of Z detector:
Results:
S1 S2 V0bar    Be/All= 4.43%
  
  237   Mon, 9.02.2015 15:27:35 A.LaszloSaving old S11 setting   id237-2015-02-09-152753.png 
  120   Wed, 7.12.2011 17:52:15 A.LaszloSaved setting of 2011 ion run...::: TPC HV :::...
VTPC-1 1210 V (sectors 1 and 4) / 1180 V
(rest)
 13x 
  148   Wed, 8.08.2012 13:53:21 Z. FodorS5 positionThe S5 counter was survey by the geometers
at the position -61.5, 7.9 
  
  185   Thu, 6.12.2012 12:54:38 Z. FodorS4 thresholds changed to 496mvI changed th threshold of S4 fro 384 mV to
496mV no to cut the Li, but with this 
cut we are reducing only half of the Be.
  
  226   Sun, 2.11.2014 21:37:24 O. WyszynskiS4 signalhttps://na61elog.cern.ch/Trigger+logbook/39   
  238   Tue, 10.02.2015 16:08:34 Z.fodorS4 position x=0, check beam hight markersI put the s4 counter to the no beam (x=0)
position
With the long tube water levels with Antoni
  
  198   Tue, 15.01.2013 17:15:58 MGS4 position change to field on17:11 (MG)  S4 is moved to the Be at 19A GeV/c
position for 20 GeV/c field, i.e. to  8.4
mm
  
  183   Wed, 5.12.2012 12:33:48 Z. FodorS4 positionI put the S4 to the position of Be. 6.2 mm
to Jura. Before it was on the hadron position.!!!!!!
  
  243   Mon, 16.02.2015 18:11:38 S. KowalskiS4 beam onS4 is at the Ar 150 GeV/c beam with 158 GeV/c
magnetic field position: x=+6 mm (Jura side)
We had difficulty to move the counter with
  
  240   Wed, 11.02.2015 23:42:21 A. Aduszkiewicz, Z.FodorS4 and GAP TPC out of the beam23:10 A.Aduszkiewicz S4 moved to x=-16.9cm
(Saleve side). GAP TPC moved all the way
towards the Jura side (101.5cm).
  
  318   Wed, 29.06.2022 11:23:10 Kamil W., Yoshikazu N. Ken S.S3 and S2 scan (T2K run)   6x 
  232   Wed, 19.11.2014 23:03:18 A.Laszlo, Z.FodorS1_2,S1_3,S1_4 high voltage raised
HV of S1_2,S1_3,S1_4 was raised a bit in
order to have better signal quality.
 id232-2014-11-19-230335.png 
  250   Sat, 21.03.2015 23:18:47 T.CzopowiczS1 in DB (and java monitor)S1 counts added to the DCS database.
It can be monitored via the java monitor
(trig/S1)
  
  27   Wed, 11.08.2010 20:31:00 A. AduszkiewiczRestored the standard TPC voltages.VTPC-1: 1210/1180 V
VTPC-2: 1060 V
MTPC-L: 1060/990 V
  
  162   Fri, 21.09.2012 18:52:50 A. MarcinekProblems with BPD1 signalssee https://na61db.cern.ch:8443/elog/BPD+logbook/65   
  144   Thu, 2.08.2012 08:57:06 Z. FodorProblem with na61convDuring the MD the na61conv hanged up, was
no connections and the terminal also was
not working. I restarted with the reset button.
  
  244   Fri, 20.02.2015 19:01:39 Dejan JokovicProblem with TOF-R TDCshttps://na61-elog.cern.ch/TOF+logbook/27   
  173   Fri, 30.11.2012 14:53:08 A.LaszloPressure loss in VTPC chilled water circuit.Due to the above reason the readout electronics
power supply tripped,
  
  216   Wed, 6.08.2014 11:46:48 Z. FodorPreparation to the modification in the areaWe (AA and ZF) are switched off the powers
for the racks in the area for the low voltage
creates and crates of the gating pulser.
 IMG_5791.JPG 
  293   Tue, 13.11.2018 17:56:21 M. KuichPb targets inside VDTue, 13.11.2018 17:56:11 Targets installed
in the VD: Pb 2mm - 37mm towards Jura; Pb
3mm - 37mm toward Saleve.
  
  205   Wed, 23.01.2013 18:13:59 O. WyszynskiPattern Unitshttps://na61db.cern.ch:8443/elog/Trigger+logbook/37   
  44   Sat, 20.11.2010 20:52:30 A.LaszloPage entry to log PSD and ion test beam activities
* RUNCONTROL[2010.11.20-20:55:25]: Pedestal
run 013251 was successful.
  
  115   Thu, 24.11.2011 09:41:36 A. IvashkinPSD voltages for Pb runsFor Pb test runs 15136-15141 the HV at MAPDs
for modules 6,7,10,11 was reduced for 1 Volts.
The current values: Mod.6: U=65.0 V ;Mod.7:
  
  91   Fri, 16.09.2011 09:20:06 A.LaszloPSD trigger uses aircore cable of S5 temporarilyWe unconnected S5 PMT from its aircore cable,
and used it for PSD trigger signal line to
shorten PSD delay.
  
  118   Tue, 29.11.2011 17:42:32 Ivashkin A.PSD trigger thresholdsPSD trigger thresholds for energies:
150 GeV - 520 mV
75  GeV - 270 mV
  
  182   Tue, 4.12.2012 20:52:34 A.IvashkinPSD trigger thresholdAt 20:30 the threshould on PSD veto was set
to 100 mV. It corresponds to 5-6 nucleons
threshold. Fine tuning is required after
  
  207   Tue, 5.02.2013 15:58:35 A.IvashkinPSD trigger thresholdPSD trigger threshold was set to 100 mV (1V)
as before for 13 GeV Be beam 
  
  206   Fri, 25.01.2013 10:17:48 S. PulawskiPSD treshold 30 GeVYesterday night:
PSD threshold set -2.3 (measure on module)
(A.Ivashkin) - It corresponds to 230 mV
  
  194   Fri, 11.01.2013 22:35:26 A.IvashkinPSD threshold for 20 GeV is 160 mVWe set PSD threshold for 20 GeV as 160 mV.
Note, that it was 100 mV for 13 GeV used
in December run. 
  
  92   Sun, 18.09.2011 20:33:05 A.LaszloPSD sum signal to ADC1-10We connect the PSD sum signal (arriving on
S5 aircore cable) to ADC unit 1 (rack 17
crate 8 slot 8) channel 10.
  
  233   Mon, 8.12.2014 13:37:18 A.IvashkinPSD repairFrom 11.30 to 13.30 we replaced the thermo-electrical
controller for Peltier cooling in module
#18. Now it works.
  
  139   Wed, 18.07.2012 11:23:25 AL, ZFPSD readout checkAL,ZF: Took out some hanging cable on the
NIM crate, in the FAN IN/OUT used different
outputs for the lines /to have higher signals/
  
  117   Tue, 29.11.2011 17:39:47 Ivashkin A.PSD position at beamPSD position (center of PSD) at beam for energy:
80 GeV, 150 GeV: Z=2200 cm from target, Y=0
cm, X=18 cm (to Jura side)
  
  149   Mon, 13.08.2012 16:00:06 Z.fodorPSD movementI moved the PSD to the parking position. move
down by 472mm and to Jura 340mmm
  
  220   Mon, 29.09.2014 15:58:18 A.AduszkiewiczPSD moved to SalevePSD was moved all the way towards the Saleve
side, in order to be moved away from the
beam incoming on October 3.
  
  187   Mon, 10.12.2012 18:55:04 O.WyszynskiPSD in pattern unitSee: https://na61db.cern.ch:8443/elog/DAQ+logbook/37   
  337   Sun, 13.11.2022 00:08:29 M. Bielewicz, J. Szewinski, O. Izvestnyy, N. KarpushkinPSD callibratrionAll run have wrong label "0 GeV Krypton Calibration
2022"
Sun, 13.11.2022 00:10:13 Experimental area
  
  116   Thu, 24.11.2011 11:07:21 A. IvashkinPSD MAPD voltagesFor the next Pb test runs the voltage at PSD
modules 6,7,10,11 increased.
Mod.6: U=65.5 V;Mod.7: U=65.5 V; Mod.10:
  
  45   Sun, 21.11.2010 01:06:16 O. PetukhovPSDStarting module-by-module calibration.
Module 1 already checked - psd run 10792.
Need 5M events for other modules.
  
  175   Mon, 3.12.2012 16:48:23 O.PetukhovPSDPSD platform moved to the run position (13cm
to Jura https://na61db.cern.ch:8443/elog/Experts+logbook/117).
Y-position at 0 cm. Z-position - at 71 cm
  
  36   Thu, 2.09.2010 15:58:25 Andras LaszloOvercurrent on FEE, replacement of FEE in MPTCRMB LV193 was switching off constantly. Could
not switch on. Reason found out: overcurrent
on MTPCR, Sector9, PADR12, FEE2 detected,
  
  109   Tue, 15.11.2011 22:55:09 A.Laszlo, S.PulawskiOscillation observed on the pedestal line of VTPC2-Sector4,6See: https://na61db.cern.ch:8443/elog/DAQ+logbook/17   
  196   Sun, 13.01.2013 22:53:19 S. PulawskiNew treshold for Z detectorI increase the treshold for Z detector.
New values are:
Z2 = -1.17V
 id196-2013-01-13-225632.png 
  186   Thu, 6.12.2012 18:32:11 S. PulawskiNew Z det THSet threshold for Zdet Z2=-1.60, Z3=-3.43   
  67   Sun, 5.12.2010 10:41:28 O.Petukhov, M.GolubevaMorning shift
* RUNCONTROL[2010.12.05-11:05:58]: Startup
of run 013547 with success. Target: None.
 12x 
  72   Mon, 6.12.2010 08:37:11 A. Wilczek, M.GolubevaMorning shift11:15 (awilczek) Changed position of the radiator
from 26 cm to 32 cm.
The Voltage is still off.
 12x 
  82   Thu, 4.08.2011 18:47:29 Z.Fodor, A.LaszloModification of MTDC mappingSee: https://na61db.cern.ch:8443/elog/DAQ+logbook/5   
  80   Mon, 1.08.2011 14:02:33 W. DominikMagnets V1 & V2 settings and callibration14:00 callibration:
V1 for I=5000A measured ==> should be 5000A
set
  
  141   Thu, 26.07.2012 15:44:04 Z, FodorMagnet warm upWith Yves Gaillard measured the resistance
of the coil on VTX1. Put 10 A current to
the coil. The measured voltage drop .720V
 id141-2012-07-26-173927.png 
  299   Tue, 9.11.2021 13:53:38 Zoltan FodorMagnet test8.11 10:00 tried to rump up VTX1
11:40 VTX1 camp crashed by cryo after they
tried to ramp up the VTX2 and it is was 
  
  135   Tue, 10.07.2012 10:41:14 A.LaszloMagnet settings for 2012 158GeV/c p+Pb data takingList of responsables in 2012:
- Magnet cryogenics: Laura Stuart - 160720
- Magnet power supply: Yves Gaillard - 160950,
  
  158   Thu, 20.09.2012 14:18:15 Zoltan FodorMagnet settingsSet the current on the magnets for 160 GeV/c
configuration
VTX1 set value: 5012.6A measured value: 5011.6A
  
  159   Thu, 20.09.2012 19:10:59 Zoltan FodorMagnet problem on VTX1 againZF: The VTX1 magnet is quenched !!!!!!! some
times around 6 o'clock 
 in the crio logbook 18:01 started the quench
  
  147   Mon, 6.08.2012 13:24:11 Z. FodorMagnet heatingFrom NA49 VTX@ reparation we found: 60 heating
current at 20V is 215K. 
                                    62A 
 id147-2012-08-06-135710.png 
  282   Thu, 5.10.2017 13:33:44 M. KuichMTPCs, VTPCs and GapTPC HV status (p+Pb 40 and Xe+La)amplification voltage/drift voltage

[TABLE border="0" cellspacing="10"] 
 Screenshot-10-27-2017_10-37-11_PM.png 
  286   Sat, 30.06.2018 16:20:07 P. PodlaskiMTPCs, VTPCs and GTPC HV status (neutrino run)amplification voltage/drift voltage

[TABLE border="0" cellspacing="10"] 
  
  291   Fri, 26.10.2018 09:49:15 P. Podlaski, M. KuichMTPCs, VTPCs and GTPC HV status (neutrino run and Pb+Pb run and FRAGMENTATION run)amplification voltage/drift voltage

[TABLE border="0" cellspacing="10"] 
 9x 
  83   Fri, 5.08.2011 11:35:02 A.LaszloMTPCL gating grid contact problemMTPCL sectors 11-20 showed spike in the middle
of time range. Rainer's advice was to check
contacts of trigger LEMO cable to gating
  
  248   Wed, 18.03.2015 11:46:43 A.Grzeszczuk, A.AduszkiewiczMTPC-R gating pulserThe gating pulser in MTPC-R sector 23 was
repaired: chip 4001 was replaced with a new
one. Preliminary tests with pedestals show
  
  38   Wed, 22.09.2010 19:57:32 A. AduszkiewiczMTPC-L voltages down by 100VReduce MTPC-L voltages in for safety during
the test - looking for the leak in the gas
system.
  
  39   Fri, 24.09.2010 00:13:21 A. AduszkiewiczMTPC-L voltage up and downAt 20.00 I increased the voltage in MTPC-L
to nominal values. However at 23:11 shifters
reported problems with the gas system and
  
  42   Fri, 24.09.2010 22:25:10 A. AduszkiewiczMTPC-L voltage upThe MTPC-L HV was increased by 100V, to the
nominal values.
  
  219   Sun, 21.09.2014 10:29:28 A. AduszkiewiczMTPC-L sector 3In MTPC-L sector 3 there is a high current
(50nA) with very low voltage (100V). We suspect
either the capacitor, or problem inside the
  
  40   Fri, 24.09.2010 10:14:31 A. AduszkiewiczMTPC-L HR down by 100VJust realized that the shifters didn't reduce
the voltage in the HR sectors - did it right
now.
  
  304   Tue, 10.05.2022 10:41:47 PP, WBMTPC non working sectorsFollowing sectors are not working (zero current,
no particles visible):
[LIST]
 Screenshot_from_2022-05-10_10-45-30.png 
  168   Wed, 3.10.2012 15:35:26 Z. FodorMTPC hut temperatureAt 13.30 we increased the incoming air temprature
by 1 C degree. I learned from the guy, they
modified 
  
  303   Fri, 1.04.2022 15:54:22 P. Podlaski, W. BrylinskiMTPC cooling temperaturesFri,  1.04.2022 15:54:31 Changing the temperatures
of cooling 16.5 -> 15.5
  
  285   Wed, 20.06.2018 20:54:43 A.AduszkiewiczMTPC LV onLV for the MTPC wall was switched on.
I tried to power on concentrators using standalone
power supply, but it seems I connected the
  
  88   Tue, 23.08.2011 12:04:53 T. Matulewicz, P. RoznowskiMTPC L drift length change 2[URL=https://na61db.cern.ch:8443/elog/DCS+logbook/62]MTPC
L drift length change 2[/URL]
  
  87   Mon, 22.08.2011 09:53:28 T. Matulewicz, P. Roznowski MTPC L drift length change [URL=https://na61db.cern.ch:8443/elog/DCS+logbook/61]MTPC
L drift length change[/URL]
  
  340   Thu, 17.11.2022 20:18:36 M. Bielewicz, J. Szewinski, A. Izvestnyy, N. Karpushkin, D. RybkaMPSD position callibrationThu, 17.11.2022 19:30:21 Move MPSD to the
central position
Thu, 17.11.2022 20:00:52 Close the door to
  
  283   Mon, 23.10.2017 21:26:24 E. KapturLowered TPC VoltagesOn Magda's orders I have lowered TPC voltages
by 200 V.
  
  351   Sat, 13.07.2024 12:36:35 I. PidhurskyiList of runs to fix in bookkeeping Run 44231 -- All zero-suppression thresholds
for TPCs were set to zero due to a bug in
the tdaq-control. (remove?)
  
  351   Sat, 13.07.2024 12:36:35 I. PidhurskyiList of runs to fix in bookkeeping Run 44231 -- All zero-suppression thresholds
for TPCs were set to zero due to a bug in
the tdaq-control. (remove?)
  
  261   Sun, 28.02.2016 15:05:00 T.Czopowicz, B.MaksiakLight guide for LV protectedPart of the VTPCs LV optical fiber, which
goes aside the MTPC hut and magnets has been
protected.
  
ELOG V3.1.3-7933898