Message ID: 371     Entry time: Wed, 11.03.2026 21:40:55
Author: B. Lyon 
Subject: TPC HV settings for 2026 p+p run 
VTPC-1 Gap TPC VTPC-2 FTPC 1 MTPC-L MTPC-R FTPC 2 FTPC 3
Wed, 11.03.2026 20:50:00 500V/13kV 500V/8.16kV 500V/13kV 500V/17.3kV 500V/19kV 500V/19kV 500V/17.3kV 500V/17.3kV Full drift voltage and potential strips ON in big TPCs, 500V on sense wires, Gating Grid turned on. (BL)
Wed, 11.03.2026 21:41:17 600V/13kV 600V/8.16kV 600V/13kV 600V/17.3kV 600V/19kV 600V/19kV 600V/17.3kV 600V/17.3kV +100V on sense wires, now at 600V (BL)
Wed, 11.03.2026 22:48:02 700V/13kV 700V/8.16kV 700V/13kV 700V/17.3kV 700V/19kV 700V/19kV 700V/17.3kV 700V/17.3kV +100V on sense wires, now at 700V (BL)
Wed, 11.03.2026 23:48:39 800V/13kV 800V/8.16kV 790V/13kV 800V/17.3kV 800V(SR)/740V(HR)/19kV 800V(SR)/740V(HR)/19kV 800V/17.3kV 800V/17.3kV +100V except MTPC HR and VTPC2. MTPC and VTPC2 now at 300V below nominal, going to hold there overnight. (BL)
Thu, 12.03.2026 00:07:56 900V/13kV 850V/8.16kV 790V/13kV 850V/17.3kV 800V(SR)/740V(HR)/19kV 800V(SR)/740V(HR)/19kV 850V/17.3kV 850V/17.3kV +100V on VTPC1, +50V on small TPCs. All TPCs (except VTPC1 sectors 1, 4) are at 300V below nominal (BL)
Thu, 12.03.2026 15:41:21 950V(1,4)/900V/13kV 850V/8.16kV 790V/13kV 850V/17.3kV 800V(SR)/740V(HR)/19kV 800V(SR)/740V(HR)/19kV 850V/17.3kV 850V/17.3kV +50V on VTPC1 sectors 1, 4. Now all are at 300V below nominal (BL)
Thu, 12.03.2026 23:07:44 1050V(1,4)/1000V/13kV 950V/8.16kV 890V/13kV 950V/17.3kV 900V(SR)/840V(HR)/19kV 900V(SR)/840V(HR)/19kV 950V/17.3kV 950V/17.3kV +100V. Now all are at 200V below nominal (BL)
Fri, 13.03.2026 16:40:06 1100V(1,4)/1050V/13kV 1000V/8.16kV 940V/13kV 1000V/17.3kV 950V(SR)/890V(HR)/19kV 950V(SR)/890V(HR)/19kV 1000V/17.3kV 1000V/17.3kV Beginning raise to nominal with +50V to all chambers (BL)
Sat, 14.03.2026 18:46:46 1250V(1,4)/1200V/13kV 1150V/8.16kV 1090V/13kV 1150V/17.3kV 1100V(SR)/1040V(HR)/19kV 1100V(SR)/1040V(HR)/19kV 1150V/17.3kV 1150V/17.3kV Nominal voltage was reached around 23:00 last night. (BL)


Fri, 13.03.2026 17:56:52 At 17:23, began raising GRC voltage as well from its parking value of 1100V, toward nominal 1600V.
Sat, 14.03.2026 18:47:51 During the final raising to nominal, it was discovered that FTPC1 was not actually connected. Had to turn off all FTPC1 voltages plus FTPC2+3 sense wires in order to connect them. FTPC2+3 were raised back to normal relatively quickly, but since FTPC1 had not actually been stressed yet we had to raise it slowly.

Wed, 18.03.2026 07:44:17 In preparation for power cut in EHN1, all TPC voltages and power supplies were turned off.
Wed, 18.03.2026 14:04:54 TPC drift voltage and gating grid were turned on before lunch. Now raising TPCs (and GRC) back to nominal sense wire voltages gradually in steps.