This is NA61/SHINE electronic logbook (read-only BACKUP!)

Run summary Shift logbook Run settings Beam logbook BPD logbook DAQ logbook DCS logbook Experts logbook Gas logbook TOF logbook Trigger logbook PSD logbook VD logbook Run coordination Detector Upgrade DRS logbook
  Logbook for all experts' activities, Page 1 of 4  NA61/SHINE logo
ID Date Author Subjectdown
  79   Sun, 31.07.2011 05:19:39 sandrotrigger counters settings
counter   HV     thr.   comments
S1        2200   170    KFKI disc
S2        2000   50     KFKI disc
S4        1920   50     KFKI disc
V0        1920   30
V1        1850   30
V1p       1950   30     light leaks ?

NB. the threshold reading on KFKI discriminators are muliplied by 3
    compared to the actual threshold !
    so to a 50 mV threshold will correspond a 150 mV reading
    for LeCroy discriminators this factor is 10 (standard)
  48   Sat, 27.11.2010 07:31:14 Gazdzicki, Stroebelethe first fragementation test of 13A GeV/c Pb beam
We start the fragmentation test of Pb beam at 13A GeV/c
-------------------------------------------------------
07:16
Zoltan decreased HV of S11 from 2200 V to 2100 V

run 13318 started

07:28
BPD HV increased to 1500 V

* RUNCONTROL[2010.11.27-07:36:20]: Stop of run 013318 with success. Number of events: 5824.

Changing S11 HV does not change signal, investigating


* RUNCONTROL[2010.11.27-07:37:36]: Startup of run 013319 with success. Target: None.

run 13319 the same settings as for 13318

* RUNCONTROL[2010.11.27-07:51:28]: Stop of run 013319 with success. Number of events: 7651.
* RUNCONTROL[2010.11.27-07:52:10]: Startup of run 013320 with success. Target: None.

getting more statistics
* RUNCONTROL[2010.11.27-08:10:40]: Stop of run 013320 with success. Number of events: 10115.
* RUNCONTROL[2010.11.27-08:11:36]: Startup of run 013321 with success. Target: None.
* RUNCONTROL[2010.11.27-08:15:23]: Stop of run 013321 with success. Number of events: 1260.
* RUNCONTROL[2010.11.27-08:15:28]: Startup of run 013322 with success. Target: None.
* RUNCONTROL[2010.11.27-08:18:21]: Stop of run 013322 with success. Number of events: 656.
* RUNCONTROL[2010.11.27-08:22:34]: Startup of run 013323 with success. Target: None.
* RUNCONTROL[2010.11.27-08:24:25]: Stop of run 013323 with success. Number of events: 666.
* RUNCONTROL[2010.11.27-08:33:16]: Startup of run 013324 with success. Target: None.
* RUNCONTROL[2010.11.27-08:34:49]: Stop of run 013324 with success. Number of events: 707.
* RUNCONTROL[2010.11.27-08:36:02]: Startup of run 013325 with success. Target: None.
* RUNCONTROL[2010.11.27-08:47:09]: Stop of run 013325 with success. Number of events: 5405.
* RUNCONTROL[2010.11.27-08:47:15]: Startup of run 013326 with success. Target: None.
* RUNCONTROL[2010.11.27-08:47:49]: Stop of run 013326 with failure. Scaler data timeout. Number of events: 0.
* RUNCONTROL[2010.11.27-08:47:54]: Startup of run 013327 with success. Target: None.
* RUNCONTROL[2010.11.27-08:48:37]: Stop of run 013327 with failure. Scaler data timeout. Number of events: 0.
* RUNCONTROL[2010.11.27-08:48:41]: Startup of run 013328 with success. Target: None.
* RUNCONTROL[2010.11.27-08:49:24]: Stop of run 013328 with failure. Scaler data timeout. Number of events: 0.
* RUNCONTROL[2010.11.27-08:49:31]: Startup of run 013329 failed. DAQ error. Target: None.
* RUNCONTROL[2010.11.27-08:50:15]: Startup of run 013330 with success. Target: None.
* RUNCONTROL[2010.11.27-08:51:03]: Stop of run 013330 with success. Number of events: 607.

including an attenuator to The S11 signal (6 DB)

* RUNCONTROL[2010.11.27-09:01:31]: Startup of run 013331 with success. Target: None.
* RUNCONTROL[2010.11.27-09:08:25]: Stop of run 013331 with success. Number of events: 3639.
* RUNCONTROL[2010.11.27-09:11:48]: Pedestal run 013332 was successful.
* RUNCONTROL[2010.11.27-09:11:58]: Startup of run 013332 with success. Target: None.
* RUNCONTROL[2010.11.27-09:14:42]: Stop of run 013332 with success. Number of events: 1351.
* RUNCONTROL[2010.11.27-09:16:17]: Pedestal run 013333 was successful.

S11 signal is tuned, He peak at about 50 ADC

09:19 tunning the S2 signal
S2 HV decreased 1980 to 1930 V

* RUNCONTROL[2010.11.27-09:19:51]: Startup of run 013333 with success. Target: None.
* RUNCONTROL[2010.11.27-09:26:21]: Stop of run 013333 with success. Number of events: 1698.

09:32 tunning S4 signal
S4 Hv decreased from 1910 to 1840 V
S12, S13 and S14 decreased 2000 to 1800 V
* RUNCONTROL[2010.11.27-09:34:17]: Startup of run 013334 with success. Target: None.
* RUNCONTROL[2010.11.27-09:37:07]: Stop of run 013334 with success. Number of events: 869.

09:41 S4 1840 -> 1800 V
S12 1800 -> 1780 V
S13 1800 -> 1825 V
S14 1800 -> 1775 V


* RUNCONTROL[2010.11.27-09:43:55]: Startup of run 013335 with success. Target: None.
* RUNCONTROL[2010.11.27-09:47:34]: Stop of run 013335 with success. Number of events: 1008.

S4 -> 1750 V

* RUNCONTROL[2010.11.27-09:53:06]: Startup of run 013336 with success. Target: None.
* RUNCONTROL[2010.11.27-09:58:52]: Stop of run 013336 with success. Number of events: 1517.
* RUNCONTROL[2010.11.27-09:59:30]: Startup of run 013337 with success. Target: None.
* RUNCONTROL[2010.11.27-10:02:21]: Stop of run 013337 with success. Number of events: 402.

S13 -> 1900 V
* RUNCONTROL[2010.11.27-10:04:55]: Pedestal run 013338 was successful.
* RUNCONTROL[2010.11.27-10:04:58]: Startup of run 013338 with success. Target: None.
* RUNCONTROL[2010.11.27-10:15:05]: Stop of run 013338 with success. Number of events: 1011.
* RUNCONTROL[2010.11.27-15:46:07]: Pedestal run 013339 was successful.
Attachment 1: id48-2010-11-27-074415.png
id48-2010-11-27-074415.png
Attachment 2: id48-2010-11-27-093559.png
id48-2010-11-27-093559.png
Attachment 3: id48-2010-11-27-074203.png
id48-2010-11-27-074203.png
  365   Sat, 28.06.2025 15:52:43 Paweltarget scan
Target scan was performed:
Estimated carbon target position: -17 mm
Estimated H2O target position: 33 mm
Estimated H20 empty target position: 83 mm
  73   Tue, 7.12.2010 18:13:10 Z. Fodors1 counter
S11 - saleve side down
S12 - Saleve side up
S13 - jura side up
S14 - Jura side down

Scintillator 60x60x5, Glued to the photomultiplier.

thin window of a ring 40 mm diameter before and after the scintiilator on the surface on the counter holder.
outer distance 85 mm, thickness 3 mm Al(???)
  37   Sat, 4.09.2010 17:55:06 Zoltan Fodorreplacement of the TRIGGER unit of CAMAC readout
The Tigger unit could not be reset, always stucks in busy.
Funy, puting in an other NIM crate works correctly. Could be problem of the power suppluy of the creates.
  129   Fri, 29.06.2012 09:26:00 R.Planetaposition of S2
position of S2 changed from 87.1 to 82.9 (4.2 mm down)
  167   Tue, 2.10.2012 14:16:27 A.Aduszkiewiczno helium between VT2 and MT
We realised that the aquarium ("sac") between VTPC2 and MTPC hut was not filled with helium before this (p+Pb) run. We decided to leave it like that in order to keep constant conditions during the data taking.
  178   Tue, 4.12.2012 13:50:29 Zoltan Fodormeasurements of the time of beam counters
I checked on the QA the counter histograms, and realized the missing time information for S11-S12 ans S11-S2.
The S11-S12 was a contact problem.
The time of the S11 is changed relative to the pPb run, because of the smalest HV on S11. I took out ~8ns cabel from the stop signal(S2)
and the measured value gone back to the time window.
  122   Wed, 20.06.2012 18:04:57 A. Marcinekcounter HV
Set HV of counters:
S4 1920V
V0 1920V
V1 1770V
S11 2200V
S2 2000V
  64   Sat, 4.12.2010 23:43:09 A. Wilczekcontinuation of the afternoon shift
Only 14 attachments could be provided by our software.
23:45 (awilczek) Z-detector turned off.
* RUNCONTROL[2010.12.04-23:49:27]: Stop of run 013533 with success. Number of events: 5164.
* RUNCONTROL[2010.12.04-23:50:45]: Startup of run 013534 with success. Target: None.
  323   Mon, 4.07.2022 01:20:05 K.Sakashita, Y. Nagaibeam parameters for 31GeV/c run 2022
three files attached.

* all the XSCI were moved out to minimize material in the beamline
* XCET(THC) pressure was set to 1.537 bar
* CEDAR pressure was set to 3.366 bar
* magnet set is file#120 and TRIM x,y modified (full parameters attached)


note that we realized that CEDAR pressure was incorrectly set to 3.32 bar.
=> set 3.366 bar
Attachment 1: CESAR_GUI_9.7.3_04-Jul-22_01-19-44.png
CESAR_GUI_9.7.3_04-Jul-22_01-19-44.png
Attachment 2: CESAR_GUI_9.7.3_04-Jul-22_01-19-11.png
CESAR_GUI_9.7.3_04-Jul-22_01-19-11.png
Attachment 3: CESAR_GUI_9.7.3_04-Jul-22_01-17-42.png
CESAR_GUI_9.7.3_04-Jul-22_01-17-42.png
  108   Tue, 15.11.2011 04:29:21 S.KowalskiZdet delay
[sk] -. add delay to sum of Zdet signal, order in ADC sum 19, pmt1, 20, pmt2 21, sum with delay 22
  101   Wed, 9.11.2011 21:25:37 Seweryn KowalskiZ-det ADC Channels
Z-det: Crate 17-8, slot 9, channel 7 - gas, 8 - quartz1, 9 - quartz2
Checktestbeam: channels: 19,20,21
  197   Mon, 14.01.2013 23:07:23 S. PulawskiZ detector (after today operations)
Today I concluded that signal is too small and I decide to make one more check of Z counter.

I see real improvement. At this moment.

This require new thresholds:
Z2=-2.02 V
Z3=-4.33 V

2013.01.15 09:05:33 (AM) HV settings for Z detector are 2120V (Z det Q1 ; M2), 2000V (Z det Q2 ; M4)
Attachment 1: id197-2013-01-14-230956.png
id197-2013-01-14-230956.png
  192   Fri, 11.01.2013 19:41:29 S. PulawskiZ det treshhold
New Tresholds:
Q1 =-1.26 V
Q2= -2.5 V
  190   Fri, 11.01.2013 08:16:32 S. PulawskiZ det - recover and HV settings
Yesterday was find that only one PMT is working in Z detector. Today it was checked and looks like accidentally somebody catch the cable and move one PMT what costs us move of QUARTZ. Situation recover as much as what possible. Both PMTs now works fine. Unfortunately situation is not correctly the same. So HV tunes to:
Q1 -2120 V
Q2- 2000 V
  99   Wed, 9.11.2011 14:06:01 S, KowalskiZ det
The quartz Z0det was installed on the position. The 2 singals was send to the ACQ.
We finished the test with LED.
The main HV Zdet Q1=200V Q2=2035
  174   Mon, 3.12.2012 10:54:38 S. KowalskiZ Det
Quartz Z Det on beam position. HV for ZdetQ1 2000 V, ZdetQ2 1910

ZF: 13:13
The CEDAR taken out from the beam line
The new quadrupole magnets installed between the BPD2 and BPD3

The target holder aligned wirh V1 counters.
The position of the BPD2 and BPD3 is measured

The voltages on the beam counters set as where at last Be run in 2011.
  143   Mon, 30.07.2012 13:52:55 Z. FodorWarning up VTX1 magnet
Starting from 26.07.2012 we measured the resistance of the magnet using 10A generator, and the the measured voltage drop on the coil it was 0.720V. The coil was separated from the converter. This situation was until 30.07 Morning, when Yves Gaillard installed an other power-converter and we found .86V at 100A. After this installation we remeasured with the used equip at 10A and got 0.15V.
we started at 11:30 100A continuesly.
  150   Tue, 21.08.2012 14:40:29 A.LaszloVTX1 top insulator box closed
The VTX1 top insulator box (where current leads connect to) has been closed.
The connector piece to replace the leaking part in bottom box of VTX1 is being manufactured.
  153   Mon, 17.09.2012 10:19:40 A.LaszloVTX1 test
S4 was put in 160GeV/c position.
Magnet area was cleared.
Magnet power supply switched on.
He leak rate is stable and pumpable.

During VTX1 ramp, before and around 2kA short timescale spikes were seen. Amplitude of spikes ranged up to 0.5V. After 2.5kA the amplitude of spikes significantly decreased, almost vanished.

14:45: VTX1 magnet test successfully finished, VTX1 is down. Now ramping VTX2.
17:28: VTX2 magnet test successfully finished, VTX2 is also down.
Software upgrade for magnet power converter is scheduled tomorrow.
  236   Fri, 6.02.2015 16:00:52 Z.FodorVTX1 power problem, dismount LMPD
15:00 VTX1 Low Voltage rack could not be powered.
  151   Fri, 24.08.2012 16:29:23 A.LaszloVTX1 magnet leak welded, box closed
VTX1 magnet joint was welded and brazed in place.
Leak test with He detector performed.
Leak test with He detector repeated 2 times after heat shock with liquid nitrogen.
New joint was found leak tight.
The vacuum box was closed.
Vacuum pump down began.
  133   Thu, 5.07.2012 16:06:19 A.LaszloVTX1 magnet
Alexei Dudarev found some contact person who seem to have docs: Fernando Cataneo

2012.07.06 12:54:36 A.Laszlo: we could ramp up VTX1 up to 4.3kA after voltage drop difference limit has been raised and time tolerance level was raised to 100msec. Fast discharge set on nevertheless at 4.3kA.

2012.07.06 15:52:08 A. Wilczek: see the entry by András in https://na61db.cern.ch:8443/elog/Shift+logbook/642
  302   Sun, 14.11.2021 17:31:17 P. Podlaski, W. BrylinskiVTPCs and FTPCs sampling rate scan

- run : 279:
number of samples per channel: 700
sampling frequency: 10MHz
zero suppression threshold 5

- run : 290:
number of samples per channel: 350
sampling frequency: 5MHz
zero suppression threshold 5

- run : 292:
number of samples per channel: 350
sampling frequency: 5MHz
zero suppression threshold 2

- run : 294, 295:
number of samples per channel: 1008
sampling frequency: 20MHz
zero suppression threshold 5

- run : 296:
number of samples per channel: 1008
sampling frequency: 20MHz
zero suppression threshold 2

- run : 314:
number of samples per channel: 700
sampling frequency: 10MHz
zero suppression threshold 3
  298   Thu, 28.10.2021 18:56:31 P. PodlaskiVTPCs HV status (first restart after LS2)
amplification voltage/drift voltage

VTPC-1 VTPC-2
Thu, 28.10.2021 18:57:50 100V/5kV 100V/5kV (PP)
Thu, 28.10.2021 19:08:17 300V/13kV 300V/13kV (PP) potential strips ON
Thu, 28.10.2021 20:12:47 500V/13kV 500V/13kV (PP) in two 100V steps
Fri, 29.10.2021 08:03:01 600V/13kV 500V/13kV (PP)
Fri, 29.10.2021 14:06:11 700V/13kV 700V/13kV (PP)
Sat, 30.10.2021 10:50:59 800V/13kV 800V/13kV (PP)
Sat, 30.10.2021 13:44:34 910V/880V/13kV 860V/13kV (PP) -300V in VTPC1 and -200V in VTPC2
Sat, 30.10.2021 16:54:28 1010V/980V/13kV 860V/13kV (PP) -200V in VTPCs
Mon, 1.11.2021 15:02:45 1060V/1060V/13kV 910V/13kV (PP) -150V in VTPCs
  204   Mon, 21.01.2013 17:44:34 A.LaszloVTPC1 FEE cooling problem and repair
VTPC1 FEE cooling system seems to be repaired by Stefan Berry. He said that filter was blocked which broke the vacuum pump. He removed filter temporarily and repaired vacuum pump. Now air is gone from the pipes.
  297   Sat, 28.08.2021 09:48:28 BR, MK, MUVTPC1 FEC Final Cable Installation
FECs tested row-by-row & connectors glued in place.

Results:
  28   Thu, 12.08.2010 12:39:45 A. AduszkiewiczVTPC-2 sectors 3,5,6 down and up
Turned off the voltages in VTPC-2 sectors 3,5 and 6 for Andras' tests, then turned them back up.
  280   Thu, 17.08.2017 11:37:34 Z. Fodor, P. PodlaskiVTPC-2 sector 2 issues
  267   Mon, 5.09.2016 12:25:33 A.AduszkiewiczVTPC-2 sector 2 amp meter
VTPC-2 sector 2 current meter appears to be broken.

We tried to apply 100V to the chamber. Power supply tripped.
We tried two other channels at the power supply - still tripping.
We disconnected the TPC cable from the current meter, and the power supply was still tripping.
Finally we disconnected a cable connecting the power supply to the current meter (at the current meter), and then it did not trip.

We have no spares. We need to look for a replacement, or a new unit.
  89   Mon, 5.09.2011 10:05:26 W. DominikVTPC-2 noise oscillations understood!
From the beginning of the restart after the long MD a noise (oscillations) in the VTPC-2 sector 3 were observed. The reason was not understood. Many actions were taken mainly related to the LV crates (some listed below not in chronological order)
1. Carts 53 and 54 were replaced by spare ones
2. Displacment of the cards 52, 53 and 54 to the right side of the crate
3. Change of the top crate power supply
4. Swap of the powre supplies between the middle and top crate
5. Change of the power supply in the middle crate
6. A lot of power cycles
7. Contact-cleaner on the connectors ob the VT-2 Gating Grid (this made sense!)

None of these action really solved the problem in long term

The problem was understood by midnight 04/09 only.
The source of the problems are the transmission lines from the GG pulsers to the Gating Grid!
We (SP, OW and WD) entered to the VT-2 magnet from the top, found the GG lined Patch Boxes (only three of them are directly accessible - 1, 3 and 6; the other are hidden under the floor on the electronics). We shaked the boxes (contacts on the connectors and the placement. NOTE: the boxes are laying free - their are neither grounded nor isolated!
It helped for sector 3, but the sector 1 bezame a little noisy (sector 6 as well). It is better now, but we should still improve and stabilise the technical aspects of this (contact-cleaned and grounding(?))
We should do this by the next SPS break.
In the quiet time, when the floor over VT-2 can be removed all patch boxes should be checked and corrected!
  218   Thu, 18.09.2014 14:18:59 A.AduszkiewiczVTPC-2 HV
In the night (4AM) the currents in VTPC-2 increased to 80nA (sector 1). We decreased HV by 200V. It didn't help much.

In the morning (10-11AM) we realised that the sector 6 was completely off: when changing HV there was no charging current visible. After disconnecting and connecting all connections: at the power supply, the current meter, the patch panel at the rack and at the TPC the problem is fixed.
  126   Mon, 25.06.2012 17:45:38 A.AduszkiewiczVTPC-1 voltage reduction for Kr calibration
Nominal voltage: 1210/1180V
Reduced to: 1130/1120V

18:19 further reduction to 1120/1120V
  246   Mon, 2.03.2015 15:10:31 A. AduszkiewiczVTPC-1 LV interlock
The temperature of the VTPC-1 LV interlock jumped up around 2AM, and then it was increasing slowly. As we already had problems with incorrect temperature measurement at the beginning of run, I tried to do the same what was done that time: I tried to touch cables in VTPC-2 sector 2. I did not observe any effect. Finally the interlock turned off LV. The temperature went down.

Restarting LV required reloading PCI kernel module and restarting EPICS server.
Attachment 1: id246-2015-03-02-151218.png
id246-2015-03-02-151218.png
  296   Thu, 29.07.2021 11:38:11 PP BRVTPC-1 FEE tests
A: 18 94 35 32 34 36
AB: 41 42 33 13 37 31

problems: 91 - loses conection, TBR (to be replaced xD) -> Replaced with 34
16 - Data fiber link doesn't work, TBR -> Replaced with 33

Thu, 29.07.2021 11:38:30 -> RCU034 lost the connection, probably Ethernet cable fell out of the socket
Thu, 29.07.2021 14:43:01 Ethernet did not fall out of socket -- some unknown problem fixed itself. Suspicious of low voltage for Sector 3 -- the other RCU in the sector had cards 4, 5, 6, 7 & 20, 21, 22, 23 (one single low voltage distribution board) not working. See attachments for before / after doing nothing.

Thu, 29.07.2021 14:48:56 VTPC1 sector 2 card 9: Low voltage connector was not plugged in all the way. Fixed.
Attachment 1: RCU37Bad.png
RCU37Bad.png
Attachment 2: RCU37Good.png
RCU37Good.png
  140   Tue, 24.07.2012 17:46:26 A.AduszkiewiczVTPC and GTPC voltages increasing
VTPC-1 drift VTPC-1 HV VTPC-2 drift VTPC-2 HV GAP TPC drift GAP TPC HV
2012.07.24 18:20 4kV 200V 4 kV 200V 3kV 200V
2012.07.25 00:10 7kV 510/480V 7 kV 360V 5kV 450V
2012.07.25 02:05 9kV 710/680V 9 kV 560V 7kV 650V
2012.07.25 04:15 10.5kV 910/880V 10.5 kV 760V 8kV 850V
2012.07.25 06:10 10.5kV 1010/980V 10.5 kV 860V 8kV 950V
2012.07.26 02:05 13kV 1110/1080V 13 kV 960V 10.2kV 1050V
2012.07.26 06:10 13kV 1160/1130V 13 kV 1010V 10.2kV 1100V
2012.07.26 08:25 13kV 1190/1160V 13 kV 1040V 10.2kV 1130V
2012.07.26 08:25 13kV 1210/1180V 13 kV 1060V 10.2kV 1150V
Attachment 1: id140-2012-07-24-174537.png
id140-2012-07-24-174537.png
  90   Mon, 5.09.2011 11:58:55 W. DominikVT-2 noise fighting - story continues
During the SPS break an attempt to cure the noise (oscillations) in the sectors 1 and 6. Action:
1. contact-cleaner was put on the patch-box 1 and 6 connectors and on the box itself
2. Boxes 1 and 6 were wrapped with copper cord and connected to the ground
3. Boxes positioned to get the best possible contact with the top plate of the VT-2

On the pedestals taking seems that it helped. Should be confirmed with real data
  228   Tue, 4.11.2014 11:23:57 Z.FodorV1 position set

V1 position is aligned.
New value of the center is x=76.3 on the moving mechanism.
The center coordinates are on the nominal beamline with 100um precision.
  124   Sat, 23.06.2012 10:37:05 A. MarcinekV1
2012.06.23 10:07:38 (AM) Switched off the V1 HV, since according to TRIM scan, it didn't give the signal. Maybe the cable is disconnected.
2012.06.23 10:31:14 (AM) Connected V1 cables (both signal and HV) and reset the HV to 1770V.
  333   Fri, 4.11.2022 10:51:08 P. Podlaski, W. BrylinskiTuning GG timing for Kr data-taking
  142   Thu, 26.07.2012 23:14:28 Oskar WyszynskiTrigger settings for USA NA61 measurement
- voltage of S4 PMT increased to 2000v
- current of VTX-2 decreased to 3500A
- added amplifier to S4
- decreased threshold to minimum on Constant Fraction Discriminator of S4
  249   Sat, 21.03.2015 22:31:57 T.CzopowiczTrigger ratios in DB (and java monitor)
Trigger ratios (T4/T1 and T2/T1) added to the DCS database.
They can be monitored via the java monitor (trig/ratio/t2t1 and trig/ratio/t4t1)
  225   Fri, 31.10.2014 19:55:07 O. WyszynskiThresholds and Voltages
https://na61elog.cern.ch/Trigger+logbook/38
  181   Tue, 4.12.2012 20:12:09 S. KowalskiTh for Zdet
Set threshold for Zdet Z2=-1.35, Z3=-3.64
  58   Wed, 1.12.2010 00:50:35 A. Sadovsky, S. PulawskiTest: 18cm Be target + with 4cm Cu degrader. COLL12 scan.
01:52 (Andras Laszlo): Added S11 signal to channel 4 of MTDC without gating.
* RUNCONTROL[2010.12.01-02:07:13]: Stop of run 013460 with success. Number of events: 26051.
* RUNCONTROL[2010.12.01-02:11:51]: Startup of run 013461 with success. Target: None.
* RUNCONTROL[2010.12.01-03:00:01]: Stop of run 013461 with success. Number of events: 13197.
* RUNCONTROL[2010.12.01-03:00:52]: Startup of run 013462 with success. Target: None.
* RUNCONTROL[2010.12.01-03:06:36]: Stop of run 013462 with success. Number of events: 1990.

* RUNCONTROL[2010.12.01-03:08:00]: Pedestal run 013463 was successful.

* RUNCONTROL[2010.12.01-03:08:11]: Startup of run 013463 with success. Target: None.
* RUNCONTROL[2010.12.01-03:48:04]: Stop of run 013463 with success. Number of events: 14107.

BPD profiles for run-013463 are in fig: id58-2010-12-01-034855.png

* RUNCONTROL[2010.12.01-03:48:52]: Startup of run 013464 with success. Target: None.
* RUNCONTROL[2010.12.01-04:42:58]: Stop of run 013464 with success. Number of events: 17434.
BPD profiles for run-013464 are in fig: id58-2010-12-01-044236.png

LHC fill started at 04:43

* RUNCONTROL[2010.12.01-06:42:22]: Startup of run 013465 with success. Target: None.

But still no beam...
* RUNCONTROL[2010.12.01-07:04:40]: Stop of run 013465 with success. Number of events: 0.

Beam seemed back at 07:41, but not really...

* RUNCONTROL[2010.12.01-07:11:29]: Startup of run 013466 with success. Target: None.
Real beam started at 07:19
* RUNCONTROL[2010.12.01-08:07:58]: Stop of run 013466 with success. Number of events: 12743.

Beam taken away: 08:07

-----------Brief report of what has been measured:----------------------
COLL12:[-20, -10]:run-013461 Events=13197, Numb_of_C11=~193, MTgated=173
COLL12:[-10, +0]:run-013463 Events=14107, Numb_of_C11=~592, MTgated=239
COLL12:[ +0, +10]:run-013464 Events=17434, Numb_of_C11=~633, MTgated=212
COLL12:[ +5, +15]:run-013466 Events=12743, Numb_of_C11=~228, MTgated=176
* RUNCONTROL[2010.12.02-09:20:35]: Startup of run 013467 with success. Target: None.
* RUNCONTROL[2010.12.02-09:21:40]: Stop of run 013467 with success. Number of events: 0.
Attachment 1: id58-2010-12-01-034855.png
id58-2010-12-01-034855.png
Attachment 2: id58-2010-12-01-044236.png
id58-2010-12-01-044236.png
Attachment 3: id58-2010-12-01-082830.png
id58-2010-12-01-082830.png
  52   Mon, 29.11.2010 20:50:02 O.Petukhov, A. WilczekTest with degrader and collimator_12=(-1.0 - +0.5) . Z-detector new configuration

* RUNCONTROL[2010.11.29-20:50:22]: Startup of run 013398 with success. Target: None.
* RUNCONTROL[2010.11.29-21:07:58]: Stop of run 013398 with success. Number of events: 4096.
* RUNCONTROL[2010.11.29-22:40:10]: Startup of run 013399 with success. Target: None.
* RUNCONTROL[2010.11.29-23:02:20]: Stop of run 013399 with success. Number of events: 9370.

Added to A-detector CFDs delays 3ns.

* RUNCONTROL[2010.11.29-23:02:43]: Startup of run 013400 with success. Target: None.
* RUNCONTROL[2010.11.29-23:09:15]: Stop of run 013400 with success. Number of events: 2763.

50 Om termonators are removed from A-detector CFDs
* RUNCONTROL[2010.11.29-23:09:21]: Startup of run 013401 with success. Target: None.
* RUNCONTROL[2010.11.29-23:22:29]: Stop of run 013401 with success. Number of events: 4194.

A-Detector: delays in CFD 2 ns and terminators 50 Ohm.
* RUNCONTROL[2010.11.29-23:22:35]: Startup of run 013402 with success. Target: None.
* RUNCONTROL[2010.11.29-23:44:26]: Stop of run 013402 with success. Number of events: 8496.

Rise voltage at A-detector to 1400V
* RUNCONTROL[2010.11.29-23:44:33]: Startup of run 013403 with success. Target: None.
* RUNCONTROL[2010.11.29-23:52:02]: Stop of run 013403 with success. Number of events: 3371.

Moved A2 detector to ADC channel 18 (ADC unit 2, channel 6).
* RUNCONTROL[2010.11.29-23:57:33]: Pedestal run 013404 was successful.
* RUNCONTROL[2010.11.29-23:57:55]: Startup of run 013404 with success. Target: None.
* RUNCONTROL[2010.11.30-00:07:42]: Stop of run 013404 with success. Number of events: 5240.
* RUNCONTROL[2010.11.30-00:07:53]: Startup of run 013405 with success. Target: None.
Now A2 detector ADC (on channel 18) looks OK (good correlation with S11).
Had to lower the voltage of BPD-s (original settings: https://na61db.cern.ch:8443/elog/Experts+logbook/101130_004125/id52-2010-11-30-004044.png), as we were asked to do so.
Moved BPD voltages back.
* RUNCONTROL[2010.11.30-00:54:18]: Stop of run 013405 with success. Number of events: 21546.
* RUNCONTROL[2010.11.30-00:54:25]: Startup of run 013406 with success. Target: None.
Beam conditions are not stable yet (they are tuning), do these data are only good for analyses when beam conditions are not interesting.
* RUNCONTROL[2010.11.30-01:39:47]: Stop of run 013406 with success. Number of events: 26049.

01:40 A.Laszlo: Making scan to find edge of C11 beam spot with COLL12.
* RUNCONTROL[2010.11.30-01:41:14]: Pedestal run 013407 was successful.
* RUNCONTROL[2010.11.30-01:45:55]: Startup of run 013407 with success. Target: None.
* RUNCONTROL[2010.11.30-01:56:04]: Stop of run 013407 with success. Number of events: 6279.
* RUNCONTROL[2010.11.30-01:57:34]: Startup of run 013408 with success. Target: None.
* RUNCONTROL[2010.11.30-02:07:42]: Stop of run 013408 with success. Number of events: 5884.
* RUNCONTROL[2010.11.30-02:09:54]: Startup of run 013409 with success. Target: None.
* RUNCONTROL[2010.11.30-02:19:22]: Stop of run 013409 with success. Number of events: 5911.
* RUNCONTROL[2010.11.30-02:21:24]: Startup of run 013410 with success. Target: None.
* RUNCONTROL[2010.11.30-02:35:38]: Stop of run 013410 with success. Number of events: 8556.
* RUNCONTROL[2010.11.30-02:36:51]: Startup of run 013411 with success. Target: None.
* RUNCONTROL[2010.11.30-02:46:17]: Stop of run 013411 with success. Number of events: 5932.
* RUNCONTROL[2010.11.30-02:51:27]: Startup of run 013412 with success. Target: None.
* RUNCONTROL[2010.11.30-03:01:00]: Stop of run 013412 with success. Number of events: 5869.
* RUNCONTROL[2010.11.30-03:01:59]: Startup of run 013413 with success. Target: None.
* RUNCONTROL[2010.11.30-03:11:15]: Stop of run 013413 with success. Number of events: 5926.
* RUNCONTROL[2010.11.30-03:12:14]: Startup of run 013414 with success. Target: None.
* RUNCONTROL[2010.11.30-03:21:28]: Stop of run 013414 with success. Number of events: 5854.
* RUNCONTROL[2010.11.30-03:23:04]: Startup of run 013415 with success. Target: None.
* RUNCONTROL[2010.11.30-03:32:19]: Stop of run 013415 with success. Number of events: 5905.
* RUNCONTROL[2010.11.30-03:33:53]: Startup of run 013416 with success. Target: None.
* RUNCONTROL[2010.11.30-03:44:24]: Stop of run 013416 with success. Number of events: 6356.
* RUNCONTROL[2010.11.30-03:46:07]: Startup of run 013417 with success. Target: None.
* RUNCONTROL[2010.11.30-03:55:58]: Stop of run 013417 with success. Number of events: 6097.
* RUNCONTROL[2010.11.30-03:56:41]: Startup of run 013418 with success. Target: None.
* RUNCONTROL[2010.11.30-04:06:56]: Stop of run 013418 with success. Number of events: 5975.
* RUNCONTROL[2010.11.30-04:12:18]: Startup of run 013419 with success. Target: None.
* RUNCONTROL[2010.11.30-04:21:37]: Stop of run 013419 with success. Number of events: 5842.
* RUNCONTROL[2010.11.30-04:22:38]: Startup of run 013420 with success. Target: None.
* RUNCONTROL[2010.11.30-04:32:02]: Stop of run 013420 with success. Number of events: 5931.
* RUNCONTROL[2010.11.30-04:33:13]: Startup of run 013421 with success. Target: None.
* RUNCONTROL[2010.11.30-04:42:49]: Stop of run 013421 with success. Number of events: 5871.
* RUNCONTROL[2010.11.30-04:44:03]: Startup of run 013422 with success. Target: None.
* RUNCONTROL[2010.11.30-04:54:04]: Stop of run 013422 with success. Number of events: 5846.
* RUNCONTROL[2010.11.30-04:55:02]: Startup of run 013423 with success. Target: None.
* RUNCONTROL[2010.11.30-05:05:11]: Stop of run 013423 with success. Number of events: 6150.
* RUNCONTROL[2010.11.30-05:06:26]: Startup of run 013424 with success. Target: None.
* RUNCONTROL[2010.11.30-05:18:45]: Stop of run 013424 with success. Number of events: 7206.
* RUNCONTROL[2010.11.30-05:20:11]: Startup of run 013425 with success. Target: None.
* RUNCONTROL[2010.11.30-05:30:06]: Stop of run 013425 with success. Number of events: 6236.
* RUNCONTROL[2010.11.30-05:31:25]: Startup of run 013426 with success. Target: None.
* RUNCONTROL[2010.11.30-05:41:07]: Stop of run 013426 with success. Number of events: 5832.
* RUNCONTROL[2010.11.30-05:42:25]: Startup of run 013427 with success. Target: None.
Attachment 1: id52-2010-11-29-230501.png
id52-2010-11-29-230501.png
Attachment 2: id52-2010-11-29-230511.png
id52-2010-11-29-230511.png
Attachment 3: id52-2010-11-30-004044.png
id52-2010-11-30-004044.png
  254   Tue, 8.09.2015 14:36:38 E. KapturTest of the Beam Counters
Old S1 and old S2 are installed.

All of the beam counters see the signal from the beam. The crate with S5 position control is not working (fan failure).
  53   Tue, 30.11.2010 05:46:09 S.Pulawski, A.SadovskyTest degreader 1cm Cu. waering colimators to find C11 position
-25.06 +40.00 (25.0e11/1.54e3 + 21.0e11/1.28e3 + 21.4e11/1.36e3)/3.
-20.06 +40.02 (24.0e11/1.53e3 + 22.0e11/1.37e3 + 24.8e11/1.56e3 + 22.0e11/1.36e3)/4.
-14.94 +39.93 (23.3e11/1.43e3 + 21.4e11/1.24e3 + 21.4e11/1.24e3 + 22.0e11/1.41e3 + 23.8e11/1.44e3)/5.
-10.07 +39.94 (23.3e11/1.44e3 + 21.5e11/1.37e3)/2.
-9.93 +39.94 (21.9e11/1.32e3 + 22.7e11/1.42e3)/2.
-5.07 +39.99 (21.9e11/1.29e3 + 23.1e11/1.48e3 + 23.3e11/1.48e3)/3.
-0.09 +40.00 (21.0e11/1.29e3 + 24.3e11/1.43e3 + 23.4e11/1.40e3 + 22.2e11/1.31e3)/4.
+5.30 +39.94 (21.4e11/1.01e3 + 25.9e11/1.20e3 + 26.2e11/1.20e3 + 27.0e11/1.28e3)/4.
+10.0 +40.00 (23.1e11/0.90e3 + 25.9e11/0.98e3 + 26.0e11/1.03e3 + 22.9e11/0.89e3 + 27.4e11/1.06e3)/5.
+14.97 +40.02 (27.1e11/0.69e3 + 24.3e11/0.65e3 + 27.4e11/0.76e3 + 25.0e11/0.70e3)/4.
  54   Tue, 30.11.2010 06:16:28 A. Sadovsky, S. Pulawski, N.Katrynska, M. GazdzickiTest degreader 1cm Cu. varing colimators to find C11 position
-40.08 +35.04 (1.65e3/26.6e11 + 1.72e3/27.9e11 + 1.59e3/25.0e11 + 1.71e3/27.8e11 + 1.66e3/26.4)/5.
-39.96 +30.06 (24.8e11/1.51e3 + 26.0e11/1.62e3 + 27.1e11/1.71e3 + 25.7e11/1.64e3)/4.
-39.96 +25.04 (24.5e11/1.58e3 + 25.2e11/1.55e3 + 26.4e11/1.60e3 + 21.7e11/1.30e3)/4.
-40.03 +20.01 (21.2e11/1.20e3 + 23.4e11/1.27e3 + 24.3e11/1.24e3 + 24.1e11/1.33e3)/4.
-39.96 +15.01 (19.1e11/0.69e3 + 21.0e11/0.78e3 + 22.4e11/0.81e3 + 21.9e11/0.84e3)/4.
-40.03 +9.99 (22.6e11/0.59e3 + 15.3e11/0.42e3 + 23.4e11/6.26e2 + 22.7e11/0.61e3)/4.
-40.03 22.87 (23.3e11/1.36e3 + 19.3e11/1.12e3 + 22.4e11/1.35e3 + 20.0e11/1.13e3)/4.
-40.02 27.04 (21.9e11/1.35e3 + 21.7e11/1.38e3 + 22.2e11/1.39e3 + 24.3e11/1.39e3)/4.
-40.02 21.04 (20.5e11/1.21e3 + 23.8e11/1.30e3 + 20.3e11/1.17e3 + 23.8e11/1.31e3)/4.
-39.96 24.02 (19.6e11/1.18e3 + 15.8e11/0.95e3 + 21.4e11/1.25e3 + 19.8e11/1.17e3)/4.
-40.08 18.31 (21.2e11/1.09e3 + 17.9e11/0.86e3 + 20.5e11/0.99e3 + 19.3e11/0.95e3)/4.
-39.93 16.68 (20.5e11/0.89e3 + 22.0e11/0.96e3 + 18.4e11/0.78e3 + 20.0e11/0.83e3)/4.

2.07 23.96 (18.1e11/0.89e3 + 22.2e11/1.12e3 + 19.6e11/1.01e3 + 19.1e11/0.93e3)/4.

-39.96 39.94 H2A_expt02 = 1.40e3 ; H2A_expt02 = 1.65e3.
-34.93 39.94 H2A_expt02 = 1.45e3 ; H2A_expt02 = 1.49e3.
-30.71 39.94 H2A_expt02 = 1.37e3 ; H2A_expt02 = 1.45e3.
-25.06 40.00 H2A_expt02 = 1.37e3 ; (25.0e7/1.54e3 + 21.5e7/1.28e3 + 21.4e7/1.36e3)/3.
-20.06 40.02 (24.0e11/1.53e3 + 22.0e11/1.37e3 + 24.8e11/1.56e3 + 22.0e11/1.36e3)/4.
-14.94 39.93 (23.3e11/1.43e3 + 21.4e11/1.24e3 + 22.0e11/1.41e3 + 23.8e11/1.44e3)/4.
-10.07 (-9.93) 39.94 (23.3e11/1.44e3 + 21.5e11/1.37e3 + 21.9e11/1.32e3 + 22.7e11/1.42e3)/4. (the colours correspond to the colimator position)
-5.07 39.99 (21.9e11/1.29e3 + 23.1e11/1.48e3 + 23.3e11/1.48e3)/3.
-0.09 40.00 (21.0e11/1.19e3 + 24.3e11/1.43e3 + 23.4e11/1.40e3 + 22.2e11/1.31e3)/4.
5.30 39.94 (21.4e11/1.01e3 + 25.9e11/1.20e3 + 26.2e11/1.20e3 + 27.6e11/1.28e3)/4.
10.00 40.00 (23.1e11/0.90e3 + 25.9e11/0.98e3 + 26.0e11/1.03e3 + 22.9e11/0.89e3 + 27.4e11/1.06e3)/5.
14.97 40.02 (27.1e11/0.70e3 + 24.3e11/0.65e3 + 27.4e11/0.76e3 + 25.0e11/0.70e3)/4.

-7.98 39.93 (25.3e11/1.56e3 + 25.9e11/1.65e3 + 24.0e11/1.46e3 + 27.1e11/1.63e3)/4.
2.02 39.94 (25.5e11/1.27e3 + 25.7e11/1.35e3 + 26.0e11/1.32e3 + 22.6e11/1.23e3)/4.
2.94 29.94 (24.0e11/1.13e3 + 21.7e11/1.07e3 + 21.9e11/1.09e3 + 20.7e11/1.02e3)/4.
-2.02 39.93 (21.4e11/1.29e3 + 19.6e11/1.20e3 + 22.7e11/1.34e3 + 19.3e11/1.13e3)/4.
18.98 39.82 (20.1e11/0.21e3 + 23.4e11/1.27e3 + 24.3e11/1.24e3 + 24.1e11/1.33e3)/4.
7.59 39.93 (19.6e11/0.90e3 + 20.1e11/0.80e3 + 16.1e11/0.69e3 + 17.4e11/0.76e3)/4.
11.96 39.93 (17.2e11/0.73e3 + 17.4e11/0.66e3 + 16.7e11/0.65e3 + 16.5e11/0.61e3)/4.
0.98 39.93 (16.8e11/0.92e3 + 16.7e11/0.93e3 + 17.7e11/0.99e3 + 18.7e11/1.00e3)/4.

The data was taken in two parts. The first one we change the distance od one of part of colimataor from -40 to 15mm and the second part was always at 40. The second time we change the distance of second part of colimater - the firs one was at -40, The distance for second colimator was from 40 to 10 mm. We mesuerment the counts from H2A_expt02 -C11 counter - and the I from beam monitor. The histograms are made like counts/I in function of distance.

{
c1 = new TCanvas("c1","Finding C11 peak",200,10,700,500);
c1->Divide(1,2);
c1->SetFillColor(42);
c1->SetGrid();
c1->GetFrame()->SetFillColor(21);
c1->GetFrame()->SetBorderSize(12);
Int_t n = 17;
Double_t xl[n];
Double_t yl[n];
Double_t exl[n];
Double_t eyl[n];

exl[ 0]=0.03, eyl[ 0]=0.002, xl[ 0]= -25.06, /*+40.00*/ yl[ 0]=( 1.54/25.0 + 1.28/21.0 + 1.36/21.4 )/3.;
exl[ 1]=0.03, eyl[ 1]=0.002, xl[ 1]= -20.06, /*+40.02*/ yl[ 1]=( 1.53/24.0 + 1.37/22.0 + 1.56/24.8 + 1.36/22.0 )/4.;
exl[ 2]=0.03, eyl[ 2]=0.002, xl[ 2]= -14.94, /*+39.93*/ yl[ 2]=( 1.43/23.3 + 1.24/21.4 + 1.24/21.4 + 1.41/22.0 + 1.44/23.8 )/5.;
exl[ 3]=0.03, eyl[ 3]=0.002, xl[ 3]= -10.00, /*+39.94*/ yl[ 3]=( 1.44/23.3 + 1.37/21.5 + 1.32/21.9 + 1.42/22.7 )/4.;
exl[ 4]=0.03, eyl[ 4]=0.002, xl[ 4]= -7.98, yl[ 4]=( 1.56/25.3 + 1.65/25.9 + 1.46/24.0 + 1.63/27.1 )/4.;
exl[ 5]=0.03, eyl[ 5]=0.002, xl[ 5]= -5.07, /*+39.99*/ yl[ 5]=( 1.29/21.9 + 1.48/23.1 + 1.48/23.3 )/3.;
exl[ 6]=0.03, eyl[ 6]=0.002, xl[ 6]= -2.02, yl[ 6]=( 1.29/21.4 + 1.20/19.6 + 1.34/22.7 + 1.13/19.3 )/4.;
exl[ 7]=0.03, eyl[ 7]=0.002, xl[ 7]= -0.09, /*+40.00*/ yl[ 7]=( 1.29/21.0 + 1.43/24.3 + 1.40/23.4 + 1.31/22.2 )/4.;
exl[ 8]=0.03, eyl[ 8]=0.002, xl[ 8]= +0.98, yl[ 8]=( 0.920/16.8+ 0.930/16.7+ 0.987/17.7+ 1.003/18.7)/4.;
exl[ 9]=0.03, eyl[ 9]=0.002, xl[ 9]= +2.02, yl[ 9]=( 1.27/25.4 + 1.36/25.7 + 1.32/26.0 + 1.23/22.6 )/4.;
exl[10]=0.03, eyl[10]=0.002, xl[10]= +2.94, yl[10]=( 1.13/24.0 + 1.07/21.7 + 1.09/21.9 + 1.02/20.7 )/4.;
exl[11]=0.03, eyl[11]=0.002, xl[11]= +5.30, /*+39.94*/ yl[11]=( 1.01/21.4 + 1.20/25.9 + 1.20/26.2 + 1.28/27.0 )/4.;
exl[12]=0.03, eyl[12]=0.002, xl[12]= +7.59, yl[12]=( 0.902/19.6+ 0.795/20.1+ 0.687/16.1+ 0.762/17.4)/4.;
exl[13]=0.03, eyl[13]=0.002, xl[13]= +10.0, /*+40.00*/ yl[13]=( 0.90/23.1 + 0.98/25.9 + 1.03/26.0 + 0.89/22.9 + 1.06/27.4 )/5.;
exl[14]=0.03, eyl[14]=0.002, xl[14]= +11.96, yl[14]=( 0.731/17.2+ 0.657/17.4+ 0.653/16.7+ 0.606/16.5)/4.;
exl[15]=0.03, eyl[15]=0.002, xl[15]= +14.97, /*+40.02*/ yl[15]=( 0.69/27.1 + 0.65/24.3 + 0.76/27.4 + 0.70/25.0 )/4.;
exl[16]=0.03, eyl[16]=0.002, xl[16]= +18.98, yl[16]=( 0.207/20.1+ 0.186/17.0+ 0.219/18.7+ 0.194/17.9)/4.;
c1->cd(1);
grl = new TGraphErrors(n,xl,yl,exl,eyl);
grl->SetTitle("TGraphErrors Example");
grl->SetMarkerColor(4);
grl->SetMarkerStyle(21);
grl->Draw("ALP");

n=11;
Double_t xr[n];
Double_t yr[n];
Double_t exr[n];
Double_t eyr[n];
exr[ 0]=0.03, eyr[ 0]=0.002, /*-40.08*/ xr[ 0]=35.04, yr[ 0]=(1.65 /26.6 + 1.72 /27.9 + 1.59 /25.0 + 1.71 /27.8 + 1.66 /26.4)/5.;
exr[ 1]=0.03, eyr[ 1]=0.002, /*-39.96*/ xr[ 1]=30.06, yr[ 1]=(1.51 /24.8 + 1.62 /26.0 + 1.71 /27.1 + 1.64 /25.7 )/4.;
exr[ 2]=0.03, eyr[ 2]=0.002, /*-40.02*/ xr[ 2]=27.04, yr[ 2]=(1.35 /21.9 + 1.38 /21.7 + 1.39 /22.2 + 1.39 /24.3 )/4.;
exr[ 3]=0.03, eyr[ 3]=0.002, /*-39.96*/ xr[ 3]=25.04, yr[ 3]=(1.58 /24.5 + 1.55 /25.2 + 1.60 /26.4 + 1.30 /21.7 )/4.;
exr[ 4]=0.03, eyr[ 4]=0.002, /*-40.02*/ xr[ 4]=24.02, yr[ 4]=(1.18 /19.6 + 0.95 /15.8 + 1.25 /21.4 + 1.17 /19.8 )/4.;
exr[ 5]=0.03, eyr[ 5]=0.002, /*-40.03*/ xr[ 5]=22.87, yr[ 5]=(1.36 /23.3 + 1.12 /19.3 + 1.35 /22.4 + 1.13 /20.0 )/4.;
exr[ 6]=0.03, eyr[ 6]=0.002, /*-40.02*/ xr[ 6]=21.04, yr[ 6]=(1.21 /20.5 + 1.30 /23.8 + 1.17 /20.3 + 1.31 /23.8 )/4.;
exr[ 7]=0.03, eyr[ 7]=0.002, /*-40.03*/ xr[ 7]=20.01, yr[ 7]=(1.20 /21.2 + 1.27 /23.4 + 1.24 /24.3 + 1.33 /24.1 )/4.;
exr[ 8]=0.03, eyr[ 8]=0.002, /*-40.02*/ xr[ 8]=18.31, yr[ 8]=(1.09 /21.2 + 0.858 /17.9 + 0.988/20.5 + 0.95 /19.3 )/4.;
exr[ 9]=0.03, eyr[ 9]=0.002, /*-39.96*/ xr[ 9]=15.01, yr[ 9]=(0.69 /19.1 + 0.78 /21.0 + 0.81 /22.4 + 0.84 /21.9 )/4.;
exr[10]=0.03, eyr[10]=0.002, /*-40.03*/ xr[10]= 9.99, yr[10]=(0.59 /22.6 + 0.42 /15.3 + 0.626/23.4 + 0.61 /22.7 )/4.;
c1->cd(2);
grr = new TGraphErrors(n,xr,yr,exr,eyr);
grr->SetTitle("TGraphErrors Example");
grr->SetMarkerColor(2);
grr->SetMarkerStyle(20);
grr->Draw("ALPS");


return c1;
}

The end of the night shift.

The graphs are added by A. Sadovsky and S. Pulawski.
-------------------------------------------------------------------------------------------------------------------------------------



ZF. 11:19 Change z/c level on CFD of A2 counters from 0 to 0.012 as the A1 counters

No beam due to LHC filling.
Beam back around 13:30.
Attachment 1: Tgraphs.png
Tgraphs.png
Attachment 2: 407.png
407.png
Attachment 3: 417.png
417.png
Attachment 4: 427.png
427.png
  17   Mon, 26.07.2010 14:32:39 Roman PlanetaTest
31 GeV beam
Attachment 1: id17-2010-07-26-143406.png
id17-2010-07-26-143406.png
  60   Fri, 3.12.2010 00:30:40 A.Sadovsky, A. WilczekTest

* RUNCONTROL[2010.12.03-00:53:05]: Pedestal run 013486 was successful.
* RUNCONTROL[2010.12.03-00:55:57]: Startup of run 013486 with success. Target: None.
* RUNCONTROL[2010.12.03-02:58:28]: Stop of run 013486 with success. Number of events: 55753.
* RUNCONTROL[2010.12.03-03:00:25]: Pedestal run 013487 was successful.

Ilias is tuning the beam line, magnet configuration 1

* RUNCONTROL[2010.12.03-03:14:45]: Startup of run 013488 with success. Target: None.
* RUNCONTROL[2010.12.03-03:21:03]: Stop of run 013488 with success. Number of events: 3038.
* RUNCONTROL[2010.12.03-03:22:44]: Pedestal run 013489 was successful.

we load now H2A.999 (the one we used on December 1, 2010 in the night) instead of H2A.994



* RUNCONTROL[2010.12.03-03:22:52]: Startup of run 013489 with success. Target: None.
* RUNCONTROL[2010.12.03-03:24:40]: Stop of run 013489 with success. Number of events: 611.
* RUNCONTROL[2010.12.03-03:30:30]: Pedestal run 013490 was successful.
* RUNCONTROL[2010.12.03-03:43:36]: Startup of run 013491 with success. Target: None.
* RUNCONTROL[2010.12.03-03:54:04]: Stop of run 013491 with success. Number of events: 5106.

configuration 2


* RUNCONTROL[2010.12.03-03:54:55]: Startup of run 013492 with success. Target: None.
* RUNCONTROL[2010.12.03-04:04:16]: Stop of run 013493 with success. Number of events: 3637.


configuration 3
18 cm Be target
no degreder
nominal currents


* RUNCONTROL[2010.12.03-04:24:24]: Startup of run 013494 with success. Target: None.
* RUNCONTROL[2010.12.03-04:31:50]: Stop of run 013494 with success. Number of events: 3184.

configuration 4
current p = 13.89 GeV/c/n
* RUNCONTROL[2010.12.03-04:59:16]: Stop of run 013495 with success. Number of events: 6277.

config 4 but low intensity (32k per spill)
* RUNCONTROL[2010.12.03-05:05:47]: Startup of run 013496 with success. Target: None.

config 5
Z/A = 0.5
no degrader


* RUNCONTROL[2010.12.03-05:57:19]: Startup of run 013497 with success. Target: None.
* RUNCONTROL[2010.12.03-06:07:59]: Stop of run 013497 with success. Number of events: 4180.
* RUNCONTROL[2010.12.03-06:14:56]: Pedestal run 013498 was successful.

From 06:15 stopped improvements attempts and took some known working condition (similat to the one on 01/12/2010) and just getting statistics.

* RUNCONTROL[2010.12.03-06:16:39]: Startup of run 013498 with success. Target: None.
* RUNCONTROL[2010.12.03-08:19:17]: Stop of run 013498 with success. Number of events: 40697.
Attachment 1: id60-2010-12-03-035753.png
id60-2010-12-03-035753.png
Attachment 2: id60-2010-12-03-035726.png
id60-2010-12-03-035726.png
Attachment 3: id60-2010-12-03-043201.png
id60-2010-12-03-043201.png
Attachment 4: id60-2010-12-03-043210.png
id60-2010-12-03-043210.png
Attachment 5: id60-2010-12-03-045136.png
id60-2010-12-03-045136.png
Attachment 6: id60-2010-12-03-045146.png
id60-2010-12-03-045146.png
Attachment 7: id60-2010-12-03-052441.png
id60-2010-12-03-052441.png
Attachment 8: id60-2010-12-03-052449.png
id60-2010-12-03-052449.png
  224   Wed, 29.10.2014 11:54:24 A.AduszkiewiczTemperature sensors
In the MTPC hut, the temperature in all sensors showed around 21 degree Celsius, except of MTPC-R Jura and MTPC-L Saleve. We realised these sensors were touching the metal construction of the TPC on the top. It also turned out to be very sensitive to the temperature of the electronics. For a test we unglued the MTPC-R sensor, and left it floating in the air. Now its temperature is around 21 degree also.

29.10.2014 15:18:09 The "MTPC-R Jura" sensor is attached back to the metal part of the TPC.
  165   Sat, 29.09.2012 17:14:38 Zoltan FodorTemperature in the MTPC hut
After increasing the chield water flow, the temperature going too low and instable.
On the climat unit 16 degree was set, now I put 20.
  152   Mon, 17.09.2012 10:18:38 A.LaszloTarget holder change to LMPD
On 14 Septermber 2012 we removed VTX1 magnet scaffolding. Small He leak is seen since 13 September, but leak rate is stable.
On 14 September 2012 we removed with Martin Wensveen the solid target holder and installed LMPD.
  155   Tue, 18.09.2012 17:51:56 A.LaszloTarget alignment
LMPD target was installed and aligned to nominal position +/-0.5mm, and measured.
BPD3 was put to nominal position by eye and measured.
V1 is not yet aligned / measured.
  5   Tue, 13.07.2010 18:04:23 A. LaszloTPC, T0, T-offset
- New relative T0 calibration with pulser is possible within full detector except GTPC with 512 time bin mode with run 10363.
(See the https://na61db.cern.ch:8443/elog/Run+summary/4868 E-log page.)
Previous attempt was also made, see https://na61db.cern.ch:8443/elog/Experts+logbook/2 E-log page.
  2   Wed, 2.06.2010 14:35:46 A. LaszloTPC, T0, T-offset
- Relative T0 calibration is possibble within individual TPC volumes with pulser calibration data. This was recorded for all TPC-s, except for GTPC: run 10213, 10216 (https://na61db.cern.ch:8443/elog/Run+summary/4841, https://na61db.cern.ch:8443/elog/Run+summary/4842). For GTPC, pulser connection has to be built.
- Relative calibration of TPC-s is possible with measuring the time difference between the first SCA clock edge appearing on FEE cables, on reference FEE cards. Relative T0 correction of TPC volumes:
* VTPC1, SECTOR2, PADR12, PAD1 ..32 (reference): +0ns.
* VTPC2, SECTOR2, PADR12, PAD1 ..32 : -116ns.
* MTPCL, SECTOR1, PADR6, PAD1 ..32 : -20ns.
* MTPCR, SECTOR6, PADR1, PAD1 ..32 : -22ns.
* GTPC, SECTOR1, PADR1, PAD65..96 : -118ns.
- Global calibration of TPC T0: this means only an y shift of the TPC image. Can be obtained from correlation of fitted main-vertex and BPD main-vertex.
  320   Thu, 30.06.2022 11:20:51 WB, PPTPC zero suppression threshold scan
Thu, 30.06.2022 11:19:53 TPC zero suppression threshold:
- 40154: threshold: 1
- 40155: threshold: 2
- 40156: threshold: 3
- 40157: threshold: 4
- 40158: threshold: 5
  24   Wed, 11.08.2010 16:03:53 A. AduszkiewiczTPC voltages down by 50V
Reduced the TPC voltages by 50V for the tests with beam in the TPC. The voltages set up to now were:

VTPC-1: 1210/1180 V
VTPC-2: 1060 V
MTPC-L: 1060/990 V
MTPC-R: 1060/990 V
GAPTPC: 1190 V
  172   Tue, 27.11.2012 12:54:35 A.AduszkiewiczTPC voltage ramping up status
amplification voltage/drift voltage
VTPC-1 VTPC-2 MTPC-L MTPC-R GAP TPC
27/11/2012 12:50 0V/1kV 0V/1kV 0V/1kV 0V/1kV 0V/1kV
28/11/2012 11:30 0V/3kV 0V/3kV 0V/5kV 0V/5kV 0V/3kV
28/11/2012 14:25 0V/5kV 0V/5kV 0V/8kV 0V/8kV 0V/5kV
28/11/2012 16:50 0V/8kV 0V/8kV 0V/12kV 0V/12kV 0V/7kV
29/11/2012 12:50 100V/13kV 100V/13kV 100V/19kV 100V/19kV 100V/10.2kV potential strips turned on; full drift voltage
29/11/2012 16:55 300V/13kV 300V/13kV 300V/19kV 300V/19kV 300V/10.2kV
30/11/2012 11:40 710/680V/13kV 560V/13kV 560/490V/19kV 560/490V/19kV 620V/10.2kV amplification voltages 500V below the nominal value
30/11/2012 19:40 910/880V/13kV 760V/13kV 760/690V/19kV 760/690V/19kV 820V/10.2kV amplification voltages 300V below the nominal value
1/12/2012 16:05 1010/980V/13kV 860V/13kV 860/790V/19kV 860/790V/19kV 920V/10.2kV amplification voltages 200V below the nominal value
2/12/2012 15:40 1110/1080V/13kV 960V/13kV 960/890V/19kV 960/890V/19kV 1020V/10.2kV amplification voltages 100V below the nominal value
2/12/2012 16:30 1160/1130V/13kV 1010V/13kV 1010/940V/19kV 1010/940V/19kV 1070V/10.2kV amplification voltages 50V below the nominal value
  188   Tue, 8.01.2013 11:00:06 A.AduszkiewiczTPC voltage ramping up status
amplification voltage/drift voltage
VTPC-1 VTPC-2 MTPC-L MTPC-R GAP TPC
8/01/2013 11:00 0V/1kV 0V/1kV 0V/1kV 0V/1kV 0V/1kV
8/01/2013 17:00 0V/2kV 0V/2kV 0V/2kV 0V/2kV 0V/2kV
9/01/2013 13:00 0V/5kV 0V/5kV 0V/5kV 0V/5kV 0V/5kV
9/01/2013 18:00 0V/8kV 0V/8kV 0V/10kV 0V/10kV 0V/7kV
10/01/2013 12:30 50V/11kV 50V/11kV 50V/15kV 50V/15kV 50V/9kV
10/01/2013 14:30 100V/11kV 100V/11kV 100V/15kV 100V/15kV 100V/9kV
10/01/2013 17:20 200V/13kV 200V/13kV 200V/19kV 200V/19kV 200V/10.2kV <-- full drift voltage
11/01/2013 09:35 500V/13kV 500V/13kV 500V/19kV 500V/19kV 500V/10.2kV
11/01/2013 12:40 (810V/780V)/13kV 660V/13kV (660V/590V)/19kV (660V/590V)/19kV 720V/10.2kV <-- 400V below full amplification voltage
11/01/2013 14:20 (1010V/980V)/13kV 860V/13kV (860V/790V)/19kV (860V/790V)/19kV 920V/10.2kV <-- 200V below full amplification voltage
11/01/2013 16:00 (1110V/1080V)/13kV 960V/13kV (960V/890V)/19kV (960V/890V)/19kV 1020V/10.2kV <-- 100V below full amplification voltage
11/01/2013 17:20 (1160V/1130V)/13kV 1010V/13kV (1010V/940V)/19kV (1010V/940V)/19kV 1070V/10.2kV <-- 50V below full amplification voltage
11/01/2013 18:00 (1190V/1160V)/13kV 1040V/13kV (1040V/970V)/19kV (1040V/970V)/19kV 1100V/10.2kV <-- 20V below full amplification voltage
11/01/2013 18:40 (1110V/1080V)/13kV 960V/13kV (960V/890V)/19kV (960V/890V)/19kV 1020V/10.2kV <-- 100V below full amplification voltage
11/01/2013 20:50 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990V)/19kV 1120V/10.2kV <-- full amplification voltage


9/01/2013 18:00 I tried to switch on the amplification voltage, the voltage could not be set in VTPC-2 and part of MTPC-L. All affected sectors are located in slot 4. I realised that the red diode is not lit on this slot.
10/01/2013 12:20 Successfully replaced faulty power supply with a new one from the electronic pool
  8   Fri, 23.07.2010 11:41:00 Marek KirejczykTPC voltage raised
Potential voltage on all TPCs raised to 750V
  11   Fri, 23.07.2010 23:50:26 M.KirejczykTPC voltage
Voltages on all xTPC sectors set to 850V, including tripped one.
  376   Tue, 11.08.2026 16:48:37 Barnabas Porfy, Tomek KowalskiTPC tests + VD tests
We are trying to find signal in trigger jitter.

We switched VTPC-1 trigger optic cable to counting house - failed reverted



Tue, 11.08.2026 18:08:18 [MB] We would like to use the beam to show new student (Anastasiia) how VD readout works.
Attachment 1: printscreen_376_20260811-164935.png
printscreen_376_20260811-164935.png
  31   Mon, 23.08.2010 03:26:02 Andras LaszloTPC readout Low Voltage failure
The power supply card LV64 produced -8V on its -2V output. This caused errorneous jumper settings (this is how the problem was discovered). Replaced bad power supply card with a spare. Data of MotherBoard corresponding to LV64 should be verified.
  305   Sat, 21.05.2022 23:19:08 PP WBTPC rate tests
Full MTPC+VTPC:


10MHz, 300 samples:
normal readout, empty events - busy ~0.9ms (gate noise removed)
sparse readout, empty events - busy ~0.6ms
sparse readout 2 MEB - sometimes corrupted data.
channel skipping (-x1) 1 MEB - 0.58-0.62
channel skipping (-x1) 2 MEB - 0.45-0.55

5MHz, 230 samples:
  171   Mon, 8.10.2012 08:19:05 A.LaszloTPC potential strips were off for the whole run
A,Aduszkiewicz found that all the potential strips were off for the whole Autumn p+Pb run.
Attachment 1: id171-2012-10-08-082232.png
id171-2012-10-08-082232.png
Attachment 2: id171-2012-10-08-084436.png
id171-2012-10-08-084436.png
  7   Fri, 23.07.2010 00:11:49 MKirTPC pot. voltages
TPC potential voltages, as decoded from the old log-book:
VTPC 1, sectors 1&4: 1210V;
VTPC 1, all other sectors: 1080V;
VTPC 2, all sectors: 1060V;
MTPC both, HR: 990V;
MTPC both, SR: 1060V.

Current status: Drift voltage up, potential voltage: 700V.
  10   Fri, 23.07.2010 18:23:51 M.KirejczykTPC pot. voltages
All TPC pot. voltages (but one) raised to 800V.
MTPC L, sec 13 tripped, now being raised in 50V
steps, currently @550V.
  96   Mon, 7.11.2011 11:39:35 A.Laszlo, S.PulawskiTPC pedestal oscillation observed again, now in full VTPC2-Sector6
See: https://na61db.cern.ch:8443/elog/DAQ+logbook/11
  95   Sat, 5.11.2011 18:45:41 A. AduszkiewiczTPC drift voltage 5kV
I increased TPC drift voltage to 5kV.

I realised that in the GAP TPC there is no current visible on the power supply. Maybe for GAP TPC cable was disconnected from the TPC?
  94   Fri, 4.11.2011 17:04:52 A. AduszkiewiczTPC drift voltage 1kV
Set the TPC drift voltage to 1kV.

The reason for the problems with switching it on before was that the HV cables were not fully plugged into the power supplies.
  93   Wed, 2.11.2011 16:29:11 A.AduszkiewiczTPC drift voltage
The TPC drift voltage is set to 5kV in all 5 TPCs.

It has been set to 1kV earlier today, but elog was not operational due to the power cut in the small counting house.

---=== Update ===---
Realised that the current is equal 0 in all TPCs. Also DCS measures no voltage. Maybe the cables are disconnected from the TPCs? Turning the drift voltage down to 0 just in case.
  22   Sun, 1.08.2010 18:11:23 Andras LaszloTPC clock and trigger ECL cables
Many DAQ crashes were encountered. Therefore, I applied contact spray to the ECL cable connectors of clock and trigger cables. 2 MTPC modules were not easy to access: they are left untouched now.

Still the number of crashes due to trigger skew is quite frequent.
  295   Fri, 9.07.2021 12:01:56 PP AL WBTPC adapter noise tests
Fri, 9.07.2021 12:02:59 Everything connected, GG a calib. pulser terminated with 50 ohm - RMS noise @ 1.75 (inner channels) - 2.3 (outer channels)

Fri, 9.07.2021 12:11:33 Removed 50 Ohm termination from calib pulser and connected it to a pulser channel - RMS noise @ 1.6 (inner) - 1.9 (outer)

Fri, 9.07.2021 13:44:49 Everything connected, GG and calib. pulser also, but HV not connected - RMS noise @ 1.6 (inner) - 1.9 (outer)

Fri, 9.07.2021 13:50:52 Everything connected, GG and calib. pulser and HV also - RMS noise @ 1.45 (inner) -- 1.7 (outer)

Fri, 9.07.2021 13:57:25 Everything connected, GG and calib. pulser and HV also, disconnected potential strips on sector 6 - RMS noise @ 1.6 (inner) -- 1.85 (outer)

Fri, 9.07.2021 14:15:02 Everything connected, GG and calib. pulser and HV also, potential strips on sector 6 reconnected - RMS noise @ 1.4 (inner) -- 1.6 (outer) WHY?


Sat, 10.07.2021 22:14:54 In addition to noise we have some periodic pick-up which increases the RMS

Sat, 10.07.2021 22:16:07 Got better after checking the proper connection of grounding wires - RMS noise @ 0.9 (two FECs connected with old adapters), but later went to RMS noise @ 1.1 (after connecting 2 additional FECs) - can be coincidence

Sat, 10.07.2021 22:23:07 Conclusion: two tests: 1) check the influence of number of FECs connceted, 2) try the better grounding
  301   Sat, 13.11.2021 17:35:48 B. Rumberger, P. Podlaski, W. BrylinskiTPC Voltage Scan
Sense wire voltage scan. Beginning at nominal voltage and incrementing by 10 V. Run numbers & currents will be noted.

Nominal voltage: Run 200

Nominal voltage + 10V in VTPCs: Run 203
--Unstable behavior in VTPC1 upstream sectors!
-Current up to ~130 nA in sectors 1 & 4 when gating grid is closed!
-Changed VTPC1 & VTPC2 +/-\Delta V from 60 V to 70 V.
-Resulting in-spill currents with gate closed: ~130 nA.

Resuming scan, starting fresh.

Nominal voltage: Run 211

VTPC1 max current: 400
VTPC2 max current: 82
FTPC1 max current: 13
FTPC2 max current: 60
FTPC3 max current: 55

Nominal voltage + 10 V: Run 212

VTPC1 max current: 415
VTPC2 max current: 90
FTPC1 max current: 25
FTPC2 max current: 65
FTPC3 max current: 58

Nominal voltage + 20 V: Run 213

VTPC1 max current: 450
VTPC2 max current: 99
FTPC1 max current: 20
FTPC2 max current: 75
FTPC3 max current: 65

Nominal voltage + 30 V: Run 214

VTPC1 max current: 578
VTPC2 max current: 112
FTPC1 max current: 34
FTPC2 max current: 84
FTPC3 max current: 77

Nominal voltage + 40 V: Run 215

VTPC1 max current: 620
VTPC2 max current: 119
FTPC1 max current: 36
FTPC2 max current: 102
FTPC3 max current: 92

Nominal voltage + 50 V: Run 216

VTPC1 max current: 670
VTPC2 max current: 153
FTPC1 max current: 38
FTPC2 max current: 115
FTPC3 max current: 98

Nominal voltage + 60 V: Run 217

VTPC1 max current: 760
VTPC2 max current: 159
FTPC1 max current: 48
FTPC2 max current: 130
FTPC3 max current: 121

Nominal voltage + 70 V: Run 218

VTPC1 max current: 850
VTPC2 max current: 195
FTPC1 max current: 52
FTPC2 max current: 144
FTPC3 max current: 130

Nominal voltage + 80 V: Run 219

VTPC1 max current: 1000
VTPC2 max current: 240
FTPC1 max current: 60
FTPC2 max current: 181
FTPC3 max current: 157

Stopping test -- we don't want to burn VTPC too badly!!
  363   Wed, 25.06.2025 13:11:05 A. Dmitriev, V. OzvenchukTPC High Voltage for 2025 O+O run (small TPCs)
FTPC-1 FTPC-2 FTPC-3 GTPC
Wed, 25.06.2025 13:25:18 0V/17.3kV 0V/17.3kV 0V/17.3kV 0V/0kV Setting up the drift voltages, except GTPC
Wed, 25.06.2025 13:32:27 500V/17.3kV 500V/17.3kV 500V/17.3kV 0V/0kV 500V on sense wires, except GTPC
Wed, 25.06.2025 13:37:14 500V/17.3kV 500V/17.3kV 0V/17.3kV 0V/0kV Switched off FTPC-3
Wed, 25.06.2025 13:48:45 500V/17.3kV 500V/17.3kV 500V/17.3kV 0V/0kV 500V on sense wires FTPC-3 (FTPC-3 power supply channel was changed)
Wed, 25.06.2025 13:56:19 600V/17.3kV 600V/17.3kV 600V/17.3kV 0V/0kV +100V in all chambers, except GTPC
Wed, 25.06.2025 14:05:27 700V/17.3kV 700V/17.3kV 700V/17.3kV 0V/0kV +100V in all chambers, except GTPC
Thu, 26.06.2025 14:38:55 600V/17.3kV 600V/17.3kV 600V/17.3kV 0V/0kV -100V in all chambers, except GTPC
Sun, 29.06.2025 00:20:59 600V/17.3kV 600V/17.3kV 600V/17.3kV 500V/8.16kV Setting up drift voltage for GTPC -> 30m -> +500V on sense
Sun, 29.06.2025 00:20:59 600V/17.3kV 600V/17.3kV 600V/17.3kV 500V/8.16kV Setting up drift voltage for GTPC -> 30m -> +500V on sense
Sun, 29.06.2025 01:20:04 650V/17.3kV 650V/17.3kV 650V/17.3kV 600V/8.16kV +50 in FTPCs, +100 in GTPC
Sun, 29.06.2025 01:36:53 700V/17.3kV 700V/17.3kV 700V/17.3kV 700V/8.16kV +50 in FTPCs, +100 in GTPC
Sun, 29.06.2025 01:39:54 800V/17.3kV 800V/17.3kV 800V/17.3kV 800V/8.16kV +100V in all chambers
Sun, 29.06.2025 01:45:27 850V/17.3kV 850V/17.3kV 850V/17.3kV 850V/8.16kV +50V in all chambers
Sun, 29.06.2025 01:49:41 880V/17.3kV 880V/17.3kV 880V/17.3kV 880V/8.16kV +30V in all chambers
Sun, 29.06.2025 01:55:14 910V/17.3kV 910V/17.3kV 910V/17.3kV 910V/8.16kV +30V in all chambers
Sun, 29.06.2025 02:09:10 930V/17.3kV 930V/17.3kV 930V/17.3kV 930V/8.16kV +20V in all chambers
Sun, 29.06.2025 02:12:42 950V/17.3kV 950V/17.3kV 950V/17.3kV 950V/8.16kV +20V in all chambers
Sun, 29.06.2025 02:27:11 980V/17.3kV 980V/17.3kV 980V/17.3kV 1040V/8.16kV +90V in GTPC, +30V in FTPCs
Sun, 29.06.2025 02:33:01 1010V/17.3kV 1010V/17.3kV 1010V/17.3kV 1040V/8.16kV +30V in FTPCs
Sun, 29.06.2025 02:37:05 1020V/17.3kV 1020V/17.3kV 1020V/17.3kV 1050V/8.16kV +10V in all chambers
Sun, 29.06.2025 02:48:50 1070V/17.3kV 1070V/17.3kV 1070V/17.3kV 1100V/8.16kV +50V in all chambers in small steps
Sun, 29.06.2025 10:20:40 1070V/17.3kV 1070V/17.3kV 1070V/17.3kV 1070V/8.16kV -30V in GTPC
Sun, 29.06.2025 12:56:03 770V/17.3kV 770V/17.3kV 770V/17.3kV 770V/8.16kV -300V in all TPCs for intensity scan
Sun, 29.06.2025 17:29:53 820V/17.3kV 820V/17.3kV 820V/17.3kV 820V/8.16kV +50V in all TPCs
Sun, 29.06.2025 17:29:53 850V/17.3kV 850V/17.3kV 850V/17.3kV 850V/8.16kV +30V in all TPCs
Sun, 29.06.2025 17:59:10 870V/17.3kV 870V/17.3kV 870V/17.3kV 870V/8.16kV +30V in all TPCs
Sun, 29.06.2025 18:04:22 900V/17.3kV 900V/17.3kV 900V/17.3kV 930V/8.16kV +30V in FTPCs, +60 GTPC
Sun, 29.06.2025 18:16:17 930V/17.3kV 930V/17.3kV 930V/17.3kV 960V/8.16kV +30V in all TPCs
Sun, 29.06.2025 18:19:54 960V/17.3kV 960V/17.3kV 960V/17.3kV 990V/8.16kV +30V in all TPCs
Sun, 29.06.2025 18:28:16 990V/17.3kV 990V/17.3kV 990V/17.3kV 1020V/8.16kV +30V in all TPCs
Sun, 29.06.2025 18:28:16 990V/17.3kV 990V/17.3kV 990V/17.3kV 1020V/8.16kV +30V in all TPCs
Sun, 29.06.2025 18:36:12 990V/17.3kV 990V/17.3kV 990V/17.3kV 990V/8.16kV -30V in GTPC
Mon, 30.06.2025 01:32:42 990V/17.3kV 990V/17.3kV 990V/17.3kV 960V/8.16kV -30V in GTPC
Sat, 5.07.2025 10:29:04 1010V/17.3kV 1010V/17.3kV 1010V/17.3kV 960V/8.16kV +20V in FTPCs for fragmentation
Sat, 5.07.2025 10:40:40 1030V/17.3kV 1030V/17.3kV 1030V/17.3kV 960V/8.16kV +20V in FTPCs
Sat, 5.07.2025 10:47:26 1050V/17.3kV 1050V/17.3kV 1050V/17.3kV 960V/8.16kV +20V in FTPCs
Sat, 5.07.2025 12:59:36 1070V/17.3kV 1070V/17.3kV 1070V/17.3kV 1030V/8.16kV +20V in FTPCs, +70 GTPC
Sat, 5.07.2025 21:37:57 990V/17.3kV 990V/17.3kV 990V/17.3kV 960V/8.16kV -80V in FTPCs, -70V in GTPC
  362   Mon, 23.06.2025 14:01:56 A. Dmitriev, V. OzvenchukTPC High Voltage for 2025 O+O run (big TPCs + GRC)
VTPC-1 VTPC-2 MTPC-L MTPC-R GRC-1
Mon, 23.06.2025 14:17:18 0V(1,4)/0V/13kV 0V/13kV 0V(SR)/0V(HR)/19kV 0V(SR)/0V(HR)/19kV 0V/20V Setting up the drift voltages
Mon, 23.06.2025 14:32:59 500V(1,4)/500V/13kV 500V/13kV 500V(SR)/500V(HR)/19kV 500V(SR)/500V(HR)/19kV 500V/20V 500V on sense wires, pot. up to 60V
Mon, 23.06.2025 14:56:21 600V(1,4)/600V/13kV 600V/13kV 600V(SR)/600V(HR)/19kV 600V(SR)/600V(HR)/19kV 600V/20V +100V in all chambers
Mon, 23.06.2025 15:18:45 700V(1,4)/700V/13kV 700V/13kV 700V(SR)/700V(HR)/19kV 700V(SR)/700V(HR)/19kV 700V/20V +100V in all chambers
Mon, 23.06.2025 15:34:48 800V(1,4)/800V/13kV 800V/13kV 800V(SR)/800V(HR)/19kV 800V(SR)/800V(HR)/19kV 800V/20V +100V in all chambers
Mon, 23.06.2025 18:03:47 900V(1,4)/900V/13kV 890V/13kV 900V(SR)/840V(HR)/19kV 900V(SR)/840V(HR)/19kV 900V/20V VTPC-2 and MTPCs are 200V below nominal [+100V -- VTPC-1, MTPCs(SR), GRC; +90V -- VTPC-2; +40V -- MTPCs(HR)]
Mon, 23.06.2025 18:20:14 1000V(1,4)/1000V/13kV 890V/13kV 900V(SR)/840V(HR)/19kV 900V(SR)/840V(HR)/19kV 1000V/20V VTPC-1(2,3,5,6) are 200V below nominal [+100V -- VTPC-1 and GRC]
Mon, 23.06.2025 18:36:24 1050V(1,4)/1000V/13kV 890V/13kV 900V(SR)/840V(HR)/19kV 900V(SR)/840V(HR)/19kV 1100V/20V VTPC-1(1,4) are 200V below nominal [+50V -- VTPC-1(1,4); +100V -- GRC]
Fri, 27.06.2025 10:45:00 1050V(1,4)/1000V/13kV 890V/13kV 900V(SR)/840V(HR)/19kV 900V(SR)/840V(HR)/19kV 0V/20V Ramped GRC down to change multiplicity (AD, RN)
Fri, 27.06.2025 11:05:59 1050V(1,4)/1000V/13kV 890V/13kV 900V(SR)/840V(HR)/19kV 900V(SR)/840V(HR)/19kV 500V/20V Ramping GRC back, first 500V (AD,RN)
Fri, 27.06.2025 11:07:51 1050V(1,4)/1000V/13kV 890V/13kV 900V(SR)/840V(HR)/19kV 900V(SR)/840V(HR)/19kV 1000V/20V Ramping GRC back +500V (AD,RN)
Fri, 27.06.2025 11:11:00 1050V(1,4)/1000V/13kV 890V/13kV 900V(SR)/840V(HR)/19kV 900V(SR)/840V(HR)/19kV 1200V/20V Ramping GRC back +200V (AD,RN)
Fri, 27.06.2025 11:14:08 1050V(1,4)/1000V/13kV 890V/13kV 900V(SR)/840V(HR)/19kV 900V(SR)/840V(HR)/19kV 1300V/20V Ramping GRC back +100V (AD,RN)
Fri, 27.06.2025 11:20:07 1050V(1,4)/1000V/13kV 890V/13kV 900V(SR)/840V(HR)/19kV 900V(SR)/840V(HR)/19kV 1400V/20V GRC 200V below nominal (GRC+100V) (AD,RN)
Fri, 27.06.2025 15:41:09 950V(1,4)/900V/13kV 790V/13kV 800V(SR)/740V(HR)/19kV 800V(SR)/740V(HR)/19kV 1300V/20V -100V in all chambers
Sat, 28.06.2025 23:19:46 1050V(1,4)/1000V/13kV 890V/13kV 900V(SR)/840V(HR)/19kV 900V(SR)/840V(HR)/19kV 1400V/20V +100V in all chambers
Sun, 29.06.2025 00:03:42 1080V(1,4)/1030V/13kV 920V/13kV 930V(SR)/870V(HR)/19kV 930V(SR)/870V(HR)/19kV 1430V/20V +30V in all chambers
Sun, 29.06.2025 00:13:36 1110V(1,4)/1060V/13kV 950V/13kV 960V(SR)/900V(HR)/19kV 960V(SR)/900V(HR)/19kV 1460V/20V +30V in all chambers
Sun, 29.06.2025 00:28:51 1140V(1,4)/1090V/13kV 980V/13kV 990V(SR)/930V(HR)/19kV 990V(SR)/930V(HR)/19kV 1490V/20V +30V in all chambers
Sun, 29.06.2025 00:31:34 1170V(1,4)/1120V/13kV 1010V/13kV 1020V(SR)/960V(HR)/19kV 1020V(SR)/960V(HR)/19kV 1520V/20V +30V in all chambers
Sun, 29.06.2025 00:43:29 1190V(1,4)/1160V/13kV 1040V/13kV 1050V(SR)/990V(HR)/19kV 1050V(SR)/990V(HR)/19kV 1540V/20V VTPC1 and GRC to PbPb nominal, +30 in all rest chambers
Sun, 29.06.2025 00:59:21 1190V(1,4)/1160V/13kV 1070V/13kV 1080V(SR)/1020V(HR)/19kV 1080V(SR)/1020V(HR)/19kV 1540V/20V +30 MTPCs, VTPC2 and MTPCs HR to PbPb nominal
Sun, 29.06.2025 01:04:52 1190V(1,4)/1160V/13kV 1070V/13kV 1100V(SR)/1020V(HR)/19kV 1100V(SR)/1020V(HR)/19kV 1540V/20V MTPCs SR to PbPb nominal

Sun, 29.06.2025 01:30:58 restarting MTPCs #16-24 after failure of the new CAEN shit (module 14)
VTPC-1 VTPC-2 MTPC-L MTPC-R GRC-1
Sun, 29.06.2025 12:56:03 990V(1,4)/960V/13kV 870V/13kV 900V(SR)/820V(HR)/19kV 900V(SR)/820V(HR)/19kV 1400V/20V -200V all TPCs -140V GRC
Sun, 29.06.2025 16:30:01 1010V(1,4)/980V/13kV 890V/13kV 920V(SR)/840V(HR)/19kV 920V(SR)/840V(HR)/19kV 1420V/20V +20V in all TPCs
Sun, 29.06.2025 16:40:13 1040V(1,4)/1010V/13kV 920V/13kV 950V(SR)/870V(HR)/19kV 950V(SR)/870V(HR)/19kV 1450V/20V +30V in all TPCs
Sun, 29.06.2025 17:00:20 1070V(1,4)/1040V/13kV 950V/13kV 980V(SR)/900V(HR)/19kV 980V(SR)/900V(HR)/19kV 1500V/20V +30V in all TPCs, +50V on GRC
Sun, 29.06.2025 17:03:16 1070V(1,4)/1040V/13kV 950V/13kV 1010V(SR)/930V(HR)/19kV 1010V(SR)/930V(HR)/19kV 1540V/20V +30 in MTPCs, +40V on GRC
Sun, 29.06.2025 17:12:00 1100V(1,4)/1070V/13kV 980V/13kV 1040V(SR)/960V(HR)/19kV 1040V(SR)/960V(HR)/19kV 1540V/20V +30 in all TPCs
Sun, 29.06.2025 17:23:05 1160V(1,4)/1130V/13kV 1040V/13kV 1100V(SR)/1020V(HR)/19kV 1100V(SR)/1020V(HR)/19kV 1540V/20V +60 in all TPCs
Sun, 29.06.2025 18:00:48 1190V(1,4)/1160V/13kV 1070V/13kV 1100V(SR)/1040V(HR)/19kV 1100V(SR)/1040V(HR)/19kV 1540V/20V +30 in VTPCs, +20 MTPCs HR
Mon, 30.06.2025 10:18:58 1190V(1,4)/1160V/13kV 1070V/13kV 1100V(SR)/1020V(HR)/19kV 1100V(SR)/1020V(HR)/19kV 1540V/20V -20 MTPCs HR
  357   Wed, 4.06.2025 19:59:38 A. Dmitriev, V. Ozvenchuk, R. NagyTPC High Voltage for 2025 Neutrino runs
LTT VTPC-1 Gap TPC VTPC-2 FTPC-1 MTPC-L MTPC-R FTPC-2 FTPC-3 GRC-1
Thu, 5.06.2025 18:06:15 0/0/4kV 0V/13kV 0V/8.16kV 0V/13kV 0V/17.3kV 500V/19kV 500V/19kV 0V/17.3kV 0V/17.3kV 0/20 Full drift voltage in all TPC, potential strips ON in big TPCs(60V), 500V on sense wires (except sectors #25), -20V on GRC-1 field
Thu, 5.06.2025 20:45:24 0/0/4kV 0V/13kV 0V/8.16kV 0V/13kV 0V/17.3kV 600V/19kV 600V/19kV 0V/17.3kV 0V/17.3kV 0/20 +100V on MTPCs(except #25)
Thu, 5.06.2025 21:45:57 0/0/4kV 0V/13kV 0V/8.16kV 0V/13kV 0V/17.3kV 700V/19kV 700V/19kV 0V/17.3kV 0V/17.3kV 0/20 +100V on MTPCs(except #25)
Thu, 5.06.2025 23:09:41 100/100/4kV 500V/13kV 500V/8.16kV 500V/13kV 500V/17.3kV 800V(25HR-500V)/19kV 800V(25SR-500V)/19kV 500V/17.3kV 500V/17.3kV 0/20 +100V on LTT sense and field , +500V on MTPCs(#25), VTPCs, GTPC and FTPCs
Thu, 5.06.2025 23:13:24 500/100/4kV 500V/13kV 700V/8.16kV 500V/13kV 700V/17.3kV 800V(25HR-500V)/19kV 800V(25SR-500V)/19kV 700V/17.3kV 700V/17.3kV 0/20 +400V on LTT sense, +200V on GTPC and FTPCs
Thu, 5.06.2025 23:22:28 500/100/4kV 500V/13kV 700V/8.16kV 600V/13kV 700V/17.3kV 800V(25HR-600V)/19kV 800V(25SR-600V)/19kV 700V/17.3kV 700V/17.3kV 0/20 +100V on VTPC-2 and MTPCs(#25)
Thu, 5.06.2025 23:29:37 600/100/4kV 600V/13kV 700V/8.16kV 700V/13kV 700V/17.3kV 900V(25HR-750V)/19kV 800V(25SR-750V)/19kV 700V/17.3kV 700V/17.3kV 0/20 +100V on LTT sense, VTPCs and MTPC-L(except #25), +150V on MTPCs(#25)
Thu, 5.06.2025 23:39:17 700/100/4kV 600V/13kV 800V/8.16kV 800V/13kV 800V/17.3kV 900V(25HR-750V)/19kV 800V(25SR-750V)/19kV 800V/17.3kV 800V/17.3kV 0/20 +100V on LTT sense, GTPC, VTPC-2 and FTPCs
Thu, 5.06.2025 23:44:12 700/100/4kV 700V/13kV 800V/8.16kV 800V/13kV 800V/17.3kV 900V/19kV 900V(25SR-900V)/19kV 800V/17.3kV 800V/17.3kV 0/20 +100 on VTPC-1 and MTPC-R(except #25), +150V on MTPCs(#25)
Thu, 5.06.2025 23:51:51 800/100/4kV 800V/13kV 900V/8.16kV 900V/13kV 900V/17.3kV 900V/19kV 900V(25SR-900V)/19kV 900V/17.3kV 900V/17.3kV 0/20 +100V on LTT sence, VTPCs, GTPC and FTPCs
Fri, 6.06.2025 00:02:11 800/200/4kV 900V/13kV 980V/8.16kV 900V/13kV 980V/17.3kV 900V/19kV 900V(25SR-900V)/19kV 950V/17.3kV 950V/17.3kV 0/20 +100V on LTT field and VTPC-1, +80V on GTPC and FTPC-1, +50V on FTPC-2 and FTPC-3
Fri, 6.06.2025 00:05:45 800/300/4kV 900V/13kV 980V/8.16kV 900V/13kV 980V/17.3kV 900V/19kV 900V(25SR-900V)/19kV 950V/17.3kV 950V/17.3kV 0/20 +100V on LTT field
Fri, 6.06.2025 00:09:38 800/500/4kV 1000V/13kV 980V/8.16kV 900V/13kV 980V/17.3kV 900V/19kV 900V(25SR-900V)/19kV 950V/17.3kV 950V/17.3kV 0/20 +200V on LTT field, +100V on VTPC-1
1000/400/4kV 1250/1200/13kV 1140V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1580/20 GRC back to 1580V
Fri, 6.06.2025 16:47:01 80Sun, 8.06.2025 20:27:09 0/500/4kV 1000V/13kV 980V/8.16kV 900V/13kV 980V/17.3kV 900V/19kV 900V(25SR-900V)/19kV 950V/17.3kV 950V/17.3kV 500/20 +500V on GRC-1 sense
Sat, 7.06.2025 15:03:33 800/500/4kV 1000V/13kV 980V/8.16kV 900V/13kV 980V/17.3kV 900V/19kV 900V(25SR-900V)/19kV 950V/17.3kV 950V/17.3kV 600/20 +100V on GRC-1 sense (AL, RN)
Thu, 12.06.2025 20:00:21 Sat, 7.06.2025 15:09:31 800/500/4kV 1000V/13kV 980V/8.16kV 900V/13kV 980V/17.3kV 900V/19kV 900V(25SR-900V)/19kV 950V/17.3kV 950V/17.3kV 800/20 +200V on GRC-1 sense (AL,RN)
Sat, 7.06.2025 15:19:48 800/500/4kV 1000V/13kV 980V/8.16kV 900V/13kV 980V/17.3kV 900V/19kV 900V(25SR-900V)/19kV 950V/17.3kV 950V/17.3kV 1000/20 +200V on GRC-1 sense (AL,RN)
Sun, 8.06.2025 10:18:07 800/500/4kV 1000V/13kV 980V/8.16kV 900V/13kV 980V/17.3kV 900V/19kV 900V(25SR-900V)/19kV 950V/17.3kV 950V/17.3kV 1100/20 +100V on GRC-1 sense (AL,RN)
Sun, 8.06.2025 10:29:29 800/500/4kV 1000V/13kV 980V/8.16kV 900V/13kV 980V/17.3kV 900V/19kV 900V(25SR-900V)/19kV 950V/17.3kV 950V/17.3kV 1200/20 +100V on GRC-1 sense (AL,RN)
Sun, 8.06.2025 10:37:49 800/500/4kV 1000V/13kV 980V/8.16kV 900V/13kV 980V/17.3kV 900V/19kV 900V(25SR-900V)/19kV 950V/17.3kV 950V/17.3kV 1300/20 +100V on GRC-1 sense (AL,RSun, 8.06.2025 19:21:28 900/400/4kV 1250/1200/13kV 1180V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1500/20 +10V on VTPC1_1,4, +20V FTPC1
N)
Sun, 8.06.2025 10:55:40 800/500/4kV 1000V/13kV 980V/8.16kV 900V/13kV 980V/17.3kV 900V/19kV 900V(25SR-900V)/19kV 950V/17.3kV 950V/17.3kV 1350/20 +50V on GRC-1 sense (AL,RN)
Sun, 8.06.2025 11:18:14 800/500/4kV 1000V/13kV 980V/8.16kV 900V/13kV 980V/17.3kV 900V/19kV 900V(25SR-900V)/19kV 950V/17.3kV 950V/17.3kV 1400/20 +50V on GRC-1 sense (AL,RN)
Sun, 8.06.2025 11:25:20 850/500/4kV 1000V/13kV 980V/8.16kV 900V/13kV 980V/17.3kV 900V/19kV 900V(25SR-900V)/19kV 950V/17.3kV 950V/17.3kV 1400/20 +50V on LTT sense (AL,RN)
Sun, 8.06.2025 11:39:50 900/500/4kV 1000V/13kV 980V/8.16kV 900V/13kV 980V/17.3kV 900V/19kV 900V(25SR-900V)/19kV 950V/17.3kV 950V/17.3kV 1450/20 +50V on LTT and GRC sense (AL,RN)
Sun, 8.06.2025 11:54:33 950/500/4kV 1000V/13kV 980V/8.16kV 900V/13kV 980V/17.3kV 900V/19kV 900V(25SR-900V)/19kV 950V/17.3kV 950V/17.3kV 1450/20 +50V on LTT sense (AL,RN 10 minutes ago)
Sun, 8.06.2025 11:55:44 1000/500/4kV 1000V/13kV 980V/8.16kV 900V/13kV 980V/17.3kV 900V/19kV 900V(25SR-900V)/19kV 950V/17.3kV 950V/17.3kV 1500/20 +50V on LTT and GRC sense (AL,RN)
Sun, 8.06.2025 13:27:42 1020/500/4kV 1000V/13kV 980V/8.16kV 900V/13kV 980V/17.3kV 900V/19kV 900V(25SR-900V)/19kV 950V/17.3kV 950V/17.3kV 1540/20 +20V on LTT sense and +40V on GRC sense (AL,RN)
Sun, 8.06.2025 13:39:30 1040/500/4kV 1000V/13kV 980V/8.16kV 900V/13kV 980V/17.3kV 900V/19kV 900V(25SR-900V)/19kV 950V/17.3kV 950V/17.3kV 1560/20 +20V on LTT and GRC sense (AL,RN)
Sun, 8.06.2025 13:47:51 1060/500/4kV 1000V/13kV 980V/8.16kV 900V/13kV 980V/17.3kV 900V/19kV 900V(25SR-900V)/19kV 950V/17.3kV 950V/17.3kV 1580/20 +20V on LTT and GRC sense (AL,RN)
Sun, 8.06.2025 13:57:57 1070/500/4kV 1000V/13kV 980V/8.16kV 900V/13kV 980V/17.3kV 900V/19kV 900V(25SR-900V)/19kV 950V/17.3kV 950V/17.3kV 1600/20 +10V on LTT sense and +20V on GRC sense (AL,RN)
Sun, 8.06.2025 14:28:32 1095/400/4kV 1000V/13kV 980V/8.16kV 900V/13kV 980V/17.3kV 900V/19kV 900V(25SR-900V)/19kV 950V/17.3kV 950V/17.3kV 1600/20 LTT conditioning with target IN nomSun, 8.06.2025 19:21:28 900/400/4kV 1250/1200/13kV 1180V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1500/20 +10V on VTPC1_1,4, +20V FTPC1
inal settings from 2024 run (AL,RN)
Sun, 8.06.2025 17:21:33 900/400/4kV 1050V/13kV 1030V/8.16kV 950V/13kV 980V/17.3kV 950V/19kV 950V/19kV 1000V/17.3kV 1000V/17.3kV 1500/20 +50V on VTPCs, GTPC, FTPCs2,3, MTPCs, -195V on LTT, -100V on GRC
Sun, 8.06.2025 18:24:59 900/400/4kV 1100V/13kV 1060V/8.16kV 1000V/13kV 980V/17.3kV 1000V/19kV 1000V/19kV 1040V/17.3kV 1040V/17.3kV 1500/20 +50V on VTPCs and MTPCs, +40 on FTPC2,3, +30V on GTPC,
Sun, 8.06.2025 18:41:33 900/400/4kV 1130V/13kV 1090V/8.16kV 1030V/13kV 1030V/17.3kV 1030V/19kV 1030V/19kV 1070V/17.3kV 1070V/17.3kV 1500/20 +30V on VTPCs, GTPC, FTPC2,3 and MTPCs, +50 on FTPC1,
Sun, 8.06.2025 18:52:01 900/400/4kV 1160V/13kV 1120V/8.16kV 1060V/13kV 1060V/17.3kV 1040V/1060/19kV 1040/1060V/19kV 1100V/17.3kV 1100V/17.3kV 1500/20 +30V on VTPCs, GTPC, FTPCs and MTPCs_HR , +10V on MTPCs_SR,
Sun, 8.06.2025 19:00:37 900/400/4kV 1190V/13kV 1150V/8.16kV 1090V/13kV 1090V/17.3kV 1060V/1060/19kV 1060/1060V/19kV 1125V/17.3kV 1125V/17.3kV 1500/20 +30V on VTPCs, GTPC, FTPC1, +20V on MTPCs_SR, +25V on FTPC2,3
Sun, 8.06.2025 19:08:06 900/400/4kV 1200/1200/13kV 1180V/8.16kV 1090V/13kV 1120V/17.3kV 1080V/1060/19kV 1080/1060V/19kV 1150V/17.3kV 1150V/17.3kV 1500/20 +10V on VTPC1,+30V on GTPC and FTPC1, +20V on MTPCs_SR, +25V on FTPC2,3
Sun, 8.06.2025 19:14:25 900/400/4kV 1220/1200/13kV 1180V/8.16kV 1090V/13kV 1140V/17.3kV 1100V/1060/19kV 1100/1060V/19kV 1150V/17.3kV 1150V/17.3kV 1500/20 +20V on VTPC1_1,4, FTPC1, MTPCs_SR
Sun, 8.06.2025 19:21:28 900/400/4kV 1240/1200/13kV 1180V/8.16kV 1090V/13kV 1160V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1500/20 +20V on VTPC1_1,4, FTPC1, -20V MTPCs_HR
Sun, 8.06.2025 19:21:28 900/400/4kV 1250/1200/13kV 1180V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1500/20 +10V on VTPC1_1,4, +20V FTPC1
Sun, 8.06.2025 19:49:51 920/400/4kV 1250/1200/13kV 1180V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1520/20 +20V on LTT and GRC-1,2
Sun, 8.06.2025 19:49:51 940/400/4kV 1250/1200/13kV 1180V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1540/20 +20V on LTT and GRC-1,2
Sun, 8.06.2025 19:54:19 960/400/4kV 1250/1200/13kV 1180V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1560/20 +20V on LTT and GRC-1,2
Sun, 8.06.2025 19:56:41 980/400/4kV 1250/1200/13kV 1180V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1580/20 +20V on LTT and GRC-1,2
Sun, 8.06.2025 19:58:52 1000/400/4kV 1250/1200/13kV 1180V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1600/20 +20V on LTT and GRC-1,2
Sun, 8.06.2025 20:01:17 1020/400/4kV 1250/Thu, 12.06.2025 20:00:21 1200/13kV 1180V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1600/20 +20V on LTT
Sun, 8.06.2025 20:04:26 1040/400/4kV 1250/1200/13kV 1180V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1600/20 +20V on LTT
Sun, 8.06.2025 20:06:23 1060/400/4kV 1250/1200/13kV 1180V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1600/20 +20V on LTT
Sun, 8.06.2025 20:09:03 1070/400/4kV 1250/1200/13kV 1180V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1600/20 +10V on LTT
Sun, 8.06.2025 20:13:03 1080/400/4kV 1250/1200/13kV 1180V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1600/20 +10V on LTT
Sun, 8.06.2025 20:20:29 1085/400/4kV 1250/1200/13kV 1180V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1600/20 +5V on LTT
Sun, 8.06.2025 20:24:59 1090/400/4kV 1250/1200/13kV 1180V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1600/20 +5V on LTT
Sun, 8.06.2025 20:27:09 1095/400/4kV 1250/1200/13kV 1180V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1600/20 +5V on LTT
Mon, 9.06.2025 14:37:20 1010/400/4kV 1250/1200/13kV 0V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1600/20 ramping down GTPC SW
Mon, 9.06.2025 15:33:10 1010/400/4kV 1250/1200/13kV 1050V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1600/20 bringing up GTPC SW
Mon, 9.06.2025 15:35:34 1010/400/4kV 1250/1200/13kV 1100V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1600/20 bringing up GTPC SW
Mon, 9.06.2025 15:39:17 1010/400/4kV 1250/1200/13kV 1130V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1600/20 bringing up GTPC SW
1000/400/4kV 1250/1200/13kV 1140V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1580/20 GRC back to 1580V
Mon, 9.06.2025 15:42:46 1010/400/4kV 1250/1200/13kV 1160V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1600/20 bringing up GTPC SW
Mon, 9.06.2025 15:44:25 1010/400/4kV 1250/1200/13kV 1180V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1600/20 bringing up GTPC SW
Mon, 9.06.2025 15:48:58 1030/400/4kV 1250/1200/13kV 1180V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1600/20 bringing up LTT SW
Mon, 9.06.2025 15:55:47 1060/400/4kV 1250/1200/13kV 1180V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1600/20 bringing up LTT SW
Mon, 9.06.2025 15:59:29 1080/400/4kV 1250/1200/13kV 1180V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1600/20 bringing up LTT SW
Mon, 9.06.2025 16:05:59 1095/400/4kV 1250/1200/13kV 1180V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1600/20 bringing up LTT SW
Tue, 10.06.2025 11:06:08 1095/400/4kV 1250/1200/13kV 1140V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1600/20
40V on GTPC
Tue, 10.06.2025 16:09:21 1095/400/4kV 1250/1200/13kV 1140V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1170V/17.3kV 1600/20 +20V on FTPC3
Tue, 10.06.2025 16:47:33 1095/400/4kV 1250/1200/13kV 1140V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1600/20
20V on FTPC3, back to nominal
Thu, 12.06.2025 17:55:30 1095/400/4kV 1250/1200/13kV 1140V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1500/20 GRC by -100V due to small current excursions
Thu, 12.06.2025 19:25:44 1095/400/4kV 1250/1200/13kV 1140V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1400/20 GRC by -100V due to small current excursions
Thu, 12.06.2025 20:00:21 1000/400/4kV 1250/1200/13kV 1140V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1400/20 GRC to 1000V for beam tuning safety
Thu, 12.06.2025 21:15:33 1000/400/4kV 1250/1200/13kV 1140V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1200/20 GRC to 1200V for beam tuning safety
Fri, 13.06.2025 00:19:53 1095/400/4kV 1250/1200/13kV 1140V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1580/20 LTT to 1095V and GRC to 1580V
Fri, 13.06.2025 10:22:59 1000/400/4kV 1250/1200/13kV 1140V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1400/20 LTT to 1000V and GRC to 1400V for safety (unstable beam+tuning)
Fri, 13.06.2025 14:22:01 1000/400/4kV 1250/1200/13kV 1140V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1580/20 GRC back to 1580V
Sat, 14.06.2025 01:37:49 1100/400/4kV 1250/1200/13kV 1140V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1150V/17.3kV 1580/20 LTT ramped up to 1100V
Sat, 14.06.2025 16:45:43 1100/400/4kV 1250/1200/13kV 1140V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1160V/17.3kV 1580/20 FTPC3 +10V above nominal
Sun, 15.06.2025 18:22:53 1100/400/4kV 1250/1200/13kV 1140V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1180V/17.3kV 1580/20 FTPC3 +30V above nominal
Tue, 17.06.2025 06:21:56 1100/400/4kV 1250/1200/13kV 500V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1180V/17.3kV 1580/20 GTPC recovery after trip +500V
Tue, 17.06.2025 06:26:09 1100/400/4kV 1250/1200/13kV 1000V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1180V/17.3kV 1580/20 GTPC recovery after trip +500V
Tue, 17.06.2025 06:28:26 1100/400/4kV 1250/1200/13kV 1100V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1180V/17.3kV 1580/20 GTPC recovery after trip +100V
Tue, 17.06.2025 06:30:07 1100/400/4kV 1250/1200/13kV 1140V/8.16kV 1090V/13kV 1180V/17.3kV 1100V/1040/19kV 1100/1040V/19kV 1150V/17.3kV 1180V/17.3kV 1580/20 GTPC recovery after trip +40V
Mon, 23.06.2025 09:34:07 0/0/4kV 1000/1000/13kV 1000V/8.16kV 1000V/13kV 1000V/17.3kV 1000V/1000/19kV 1000/1000V/19kV 1000V/17.3kV 1000V/17.3kV 1000/20 ramping down
Mon, 23.06.2025 09:42:26 0/0/4kV 750/750/13kV 750V/8.16kV 750V/13kV 750V/17.3kV 750V/750/19kV 750/750V/19kV 750V/17.3kV 750V/17.3kV 750/20 ramping down
Mon, 23.06.2025 09:53:42 0/0/4kV 500/500/13kV 500V/8.16kV 500V/13kV 500V/17.3kV 500V/500/19kV 500/500V/19kV 500V/17.3kV 500V/17.3kV 500/20 ramping down
Mon, 23.06.2025 09:58:04 0/0/4kV 0/0/13kV 0V/8.16kV 0V/13kV 0V/17.3kV 0V/0/19kV 0/0V/19kV 0V/17.3kV 0V/17.3kV 0/0 ramping down
Mon, 23.06.2025 10:25:10 0/0/0kV 0/0/0kV 0V/0kV 0V/0kV 0V/0kV 0V/0/0kV 0/0V/0kV 0V/0kV 0V/0kV 0/0 ramping down finished
  352   Fri, 18.10.2024 15:07:03 B. LyonTPC High Voltage for 2024 pi+C and Pb runs
VTPC-1 Gap TPC VTPC-2 FTPC 1 MTPC-L MTPC-R FTPC 2 FTPC 3
Fri, 18.10.2024 15:09:12 500V/13kV 500V/8.16kV 500V/13kV 500V/17.3kV 500V/19kV 500V/19kV 500V/17.3kV 500V/17.3kV Full drift voltage and potential strips ON in big TPCs, 500V on sense wires (BL)
Fri, 18.10.2024 17:00:43 600V/13kV 600V/8.16kV 600V/13kV 600V/17.3kV 600V/19kV 600V/19kV 600V/17.3kV 600V/17.3kV +100V in all chambers, Gating Grid PS turned on (BL)
Sat, 19.10.2024 09:41:49 700V/13kV 700V/8.16kV 700V/13kV 700V/17.3kV 700V/19kV 700V/19kV 700V/17.3kV 700V/17.3kV +100V in all chambers (BL)
Sat, 19.10.2024 12:53:09 800V/13kV 800V/8.16kV 800V/13kV 800V/17.3kV 800V/19kV 800V/19kV 800V/17.3kV 800V/17.3kV +100V in all chambers (BL)
Sat, 19.10.2024 15:11:54 900V/13kV 900V/8.16kV 890V/13kV 900V/17.3kV 900V(SR)/840V(HR)/19kV 900V(SR)/840V(HR)/19kV 900V/17.3kV 900V/17.3kV +100V in all chambers except MTPC HR and VTPC2. VTPC2 and MTPCs are at 200V below nominal. (BL)
Sat, 19.10.2024 16:40:34 1000V/13kV 980V/8.16kV 890V/13kV 980V/17.3kV 900V(SR)/840V(HR)/19kV 900V(SR)/840V(HR)/19kV 950V/17.3kV 950V/17.3kV +Volts, now all chambers except VTPC1 P1,P4 are at 200V below nominal. (BL)
Sat, 19.10.2024 22:45:52 1050V(P1,P4)1000V/13kV 980V/8.16kV 890V/13kV 980V/17.3kV 900V(SR)/840V(HR)/19kV 900V(SR)/840V(HR)/19kV 950V/17.3kV 950V/17.3kV All chambers are now at 200V below nominal. (BL)
Sun, 20.10.2024 17:27:52 1100V(P1,P4)1050V/13kV 1030V/8.16kV 940V/13kV 1030V/17.3kV 950V(SR)/890V(HR)/19kV 950V(SR)/890V(HR)/19kV 1000V/17.3kV 1000V/17.3kV Begin process of ramping to nominal voltages. All chambers bumped by +50V. (BL)
Sun, 20.10.2024 17:36:36 1150V(P1,P4)1100V/13kV 1080V/8.16kV 990V/13kV 1080V/17.3kV 1000V(SR)/940V(HR)/19kV 1000V(SR)/940V(HR)/19kV 1050V/17.3kV 1050V/17.3kV All chambers bumped by +50V. (BL)
Sun, 20.10.2024 17:55:56 1250V(P1,P4)/1200V/13kV 1180V/8.16kV 1090V/13kV 1180V/17.3kV 1100V(SR)/1040V(HR)/19kV 1100V(SR)/1040V(HR)/19kV 1150V/17.3kV 1150V/17.3kV All TPCs at nominal voltages (BL)
Wed, 30.10.2024 14:15:08 1250V(P1,P4)/1200V/13kV 0V/0kV 1090V/13kV 0V/0kV 1100V(SR)/1040V(HR)/19kV 1100V(SR)/1040V(HR)/19kV 0V/0kV 0V/0kV In preparation for Pb run, beamline TPCs turned to 0. First sense voltage allowed to ramp down, then drift voltages turned off. Other TPCs at nominal voltages (BL)

Wed, 30.10.2024 04:11:45 (Andras Laszlo): There was mains problem, after mains recovery, re-ramping.
Wed, 30.10.2024 05:02:08 (Andras Laszlo): Finished re-ramping TPCs and GRC.

VTPC-1 VTPC-2 MTPC-L MTPC-R
Thu, 31.10.2024 17:16:47 1010V(P1,P4)/980V/13kV 890V/13kV 900V(SR)/820V(HR)/19kV 900V(SR)/820V(HR)/19kV New table without beamline TPCs for Pb run. Voltages stepped down to 200V below ion run levels for beam tuning (BL)
Sat, 2.11.2024 23:53:14 1110V(P1,P4)/1080V/13kV 990V/13kV 1000V(SR)/920V(HR)/19kV 1000V(SR)/920V(HR)/19kV Raised voltages to -80V/-100V in small steps (BL)
Sun, 3.11.2024 00:43:13 1190V(P1,P4)/1160V/13kV 1070V/13kV 1100V(SR)/1020V(HR)/19kV 1100V(SR)/1020V(HR)/19kV Raised voltages to nominal in small steps (BL)

Sun, 3.11.2024 00:43:13 BL: Raised GRC Voltage from 1400V to 1540V in steps per instruction from A. Laszlo

Mon, 11.11.2024 12:43:43 BL: During beam intensity adjustments, brief spike in S1 (~3M) caused MTPCL Sector 25 to start running a high current of ~2uA. Promptly dropped voltages in MTPCL High Res by 200V. Sector 25 continued running at 200nA, so further dropped it to 500V. (620 below nominal). Running currents appear to have subsided. Raising voltages back in small steps.
Mon, 11.11.2024 14:24:13 BL: TPCs (including MTPCL Sector 25) appear fine, but beam intensity is really low. Dropped all TPCs down to 300V below nominal (beam expert thought 200V wasn't safe enough) so beam expert can tune the beam.
Mon, 11.11.2024 22:30:40 BL: Brought TPCs up 100V, now at 200V below nominal. Beam intensity has changed again after recent LHC filling so waiting for additional beam tuning before proceeding higher.
Mon, 11.11.2024 23:18:28 BL: Brought TPCs back to nominal in small steps. Out-of-spill currents seem good.

Mon, 18.11.2024 08:29:11 BL: MTPCL Sector 25 tripped at ~6:40am this morning after high intensity beam. Currents were running 1.4-1.6uA in a similar fashion as previous instance until the power supply (trip set to 1.6uA/5s) killed the sector voltage after many minutes. Brought sector back up to nominal in steps, appears fine. New trip set to 1uA/10s.

Wed, 20.11.2024 21:35:19 At approximately 8pm, we received an extremely high intensity beam from SPS (S1 ~5M). Currents in VTPCs hit 4uA. To enable beam tuning, TPC HV was turned down by 200V and we are now raising it back in small steps. VTPC2 current trip setting was lowered from 5uA to 3uA. (I think the trip time is still 5s)

VTPC-1 Gap TPC VTPC-2 FTPC 1 MTPC-L MTPC-R FTPC 2 FTPC 3
Sun, 20.10.2024 17:55:56 890V(P1,P4)/860V/13kV 0kV 770V/13kV N/A 800V(SR)/820V(HR)/19kV 800V(SR)/820V(HR)/19kV 0kV 0kV Reduced big TPCs by 300V in preparation for beam change to fragmentation run. GapTPC and FTPC2+3 will be used for this run, but they are not online yet (still purging) (BL)
Mon, 25.11.2024 15:46:36 890V(P1,P4)/860V/13kV 0V/8.16kV 770V/13kV N/A 800V(SR)/820V(HR)/19kV 800V(SR)/820V(HR)/19kV 0V/17.3kV 0V/17.3kV Turned on drift voltage for GapTPC and FTPC2+3. Drift velocity ready for FTPC2+3, but GapTPC still needs time to purge. (BL)
Mon, 25.11.2024 16:38:06 890V(P1,P4)/860V/13kV 600V/8.16kV 770V/13kV N/A 800V(SR)/820V(HR)/19kV 800V(SR)/820V(HR)/19kV 600V/17.3kV 600V/17.3kV Gating Grid for FTPCs and GapTPC turned on, +600V for GapTPC and FTPC2+3. (BL)
Mon, 25.11.2024 17:20:22 890V(P1,P4)/860V/13kV 600V/8.16kV 770V/13kV N/A 800V(SR)/820V(HR)/19kV 800V(SR)/820V(HR)/19kV 700V/17.3kV 700V/17.3kV +100V for FTPC2+3. (BL)
Mon, 25.11.2024 17:55:19 890V(P1,P4)/860V/13kV 600V/8.16kV 770V/13kV N/A 800V(SR)/820V(HR)/19kV 800V(SR)/820V(HR)/19kV 800V/17.3kV 800V/17.3kV +100V for FTPC2+3. (BL)
Mon, 25.11.2024 20:40:36 890V(P1,P4)/860V/13kV 600V/8.16kV 770V/13kV N/A 800V(SR)/820V(HR)/19kV 800V(SR)/820V(HR)/19kV 900V/17.3kV 900V/17.3kV +100V for FTPC2+3. Pausing here. (BL)
Tue, 26.11.2024 11:49:56 890V(P1,P4)/860V/13kV 700V/8.16kV 770V/13kV N/A 800V(SR)/820V(HR)/19kV 800V(SR)/820V(HR)/19kV 900V/17.3kV 900V/17.3kV +100V for GapTPC, drift velocity measurement has started. (BL)
Tue, 26.11.2024 14:14:53 890V(P1,P4)/860V/13kV 800V/8.16kV 770V/13kV N/A 800V(SR)/820V(HR)/19kV 800V(SR)/820V(HR)/19kV 900V/17.3kV 900V/17.3kV +100V for GapTPC. Pausing here. (BL)


Mon, 25.11.2024 17:15:37 TK: went down to VTPC with DR to disconnect and reconnect LV for VTPC2 RCU 21 FEC 11 and RCU 23 FEC 8 to fix the voltage levels. Voltages went from ~3.18V back to ~3.23V.
  74   Fri, 10.06.2011 14:53:29 A. AduszkiewiczTPC HV up
Since yesterday evening we're slowly increasing chamber voltage. Now at 900V in VTPCs and 800/900V in MTPCs.
  25   Wed, 11.08.2010 19:05:26 A. AduszkiewiczTPC HV tripped
Almost all TPC sectors tripped, except of VTPC-1 sectors 4 and 5, and some sectors in MTPC-R. BPDs tripped also.
-> Power supply problem (it trips even if the cable is disconnected). Rainer is arriving.

20:30 Solution is found. Accidentally the current limit for all channels in the CAEN power supply was set to 10nA. Now the original settings are restored and we could turn on all TPCs, BPDs, counters, potential strips (they tripped also).
  266   Sun, 4.09.2016 11:27:35 M. Kuich, A.AduszkiewiczTPC HV status.
amplification voltage/drift voltage

VTPC-1 VTPC-2 MTPC-L MTPC-R GAP TPC
4/09/2016 11:28 0V/6.5kV 0V/6.5kV 0V/9.5kV 0V/9.5kV 0V/4.2kV (MK)
4/09/2016 18:10 0V/13kV 0V/13kV 0V/19kV 0V/19kV 0V/8.16kV Full drift voltage and potential strips ON (AA)
5/09/2016 15:30 100V/13kV 100V/13kV 100V/19kV 100V/19kV 100V/8.16kV VTPC-2 sec. 2 ampmeter caused HV power supply trip. Sec. 2 of VTPC-2 off. (MK)
5/09/2016 17:30 300V/13kV 0V/13kV 300V/19kV 300V/19kV 0V/8.16kV Ampmeter taken to repair. (MK)
6/09/2016 9:30 500V/13kV 0V/13kV 500V/19kV 500V/19kV 0V/8.16kV (MK)
6/09/2016 11:00 600V/13kV 600V/13kV 600V/19kV 600V/19kV 600V/8.16kV Sector 11 in MTPC-R has hight current. Voltage in Sector 11 of MTPC-R is 650V.(MK)
6/09/2016 14:00 750V/13kV 700V/13kV 630V/700V/19kV 630V/700V/19kV 700V/8.16kV Voltage in Sector 11 of MTPC-R is 650V. (MK)
6/09/2016 17:40 830V/800V/13kV 700V/13kV 630V/700V/19kV 630V/700V/19kV 790V/8.16kV Voltage in Sector 11 of MTPC-R is 650V. (MK)
7/09/2016 8:15 880V/850V/13kV 730V/13kV 660V/730V/19kV 660V/730V/19kV 820V/8.16kV (MK)
7/09/2016 11:10 930V/900V/13kV 780V/13kV 710V/780V/19kV 710V/780V/19kV 870V/8.16kV (MK)
7/09/2016 13:10 960V/930V/13kV 810V/13kV 740V/810V/19kV 740V/810V/19kV 900V/8.16kV (MK)
7/09/2016 15:00 980V/950V/13kV 830V/13kV 760V/830V/19kV 760V/830V/19kV 920V/8.16kV (MK)
7/09/2016 17:50 1020V/990V/13kV 870V/13kV 800V/870V/19kV 800V/870V/19kV 960V/8.16kV (MK)
7/09/2016 19:00 1060V/1030V/13kV 910V/13kV 840V/910V/19kV 840V/910V/19kV 1000V/8.16kV (MK)
8/09/2016 13:40 1110V/1080V/13kV 960V/13kV 890V/960V/19kV 890V/960V/19kV 1050V/8.16kV Voltage 100V below nominal (AA)
8/09/2016 16:00 1160V/1130V/13kV 1010V/13kV 940V/1010V/19kV 940V/1010V/19kV 1050V/8.16kV Voltage 50V below nominal (AA)
8/09/2016 16:00 1160V/1130V/13kV 1010V/13kV 940V/1010V/19kV 940V/1010V/19kV 950V/8.16kV GAP TPC lowered by 100V for beam tuning (AA)
9/09/2016 10:30 1180V/1150V/13kV 1030V/13kV 960V/1030V/19kV 960V/1030V/19kV 1000V/8.16kV Voltage 30V below nominal (AA)
10/09/2016 18:10 1210V/1180V/13kV 1060V/13kV 960V/1030V/19kV 960V/1030V/19kV 1150V/8.16kV VTPCs and GAP TPC up, MTPCs 30V below nominal (AA)
15/09/2016 18:18 1110V/1080V/13kV 960V/13kV 890V/960V/19kV 890V/960V/19kV 1050V/8.16kV 100V below nominal due to beam tuning (MK)
16/09/2016 17:08 1140V/1110V/13kV 990V/13kV 920V/990V/19kV 920V/990V/19kV 1080V/8.16kV Ramping up (MK)
16/09/2016 17:58 1170V/1140V/13kV 1030V/13kV 950V/1030V/19kV 950V/1030V/19kV 1110V/8.16kV Ramping up (MK)
16/09/2016 18:40 1210V/1180V/13kV 1060V/13kV 990V/1060V/19kV 990V/1060V/19kV 1150V/8.16kV Nominal voltages (MK)
16/09/2016 18:40 1210V/1180V/13kV 1060V/13kV 990V/1060V/19kV 990V/1060V/19kV 1170V/8.16kV GapTPC voltage +20V (MK)
21/09/2016 18:44 1110V/1080V/13kV 960V/13kV 890V/960V/19kV 890V/960V/19kV 1070V/8.16kV All voltages -100V for beam tuning (AA)
22/09/2016 2:25 1210V/1180V/13kV 1060V/13kV 990V/1060V/19kV 990V/1060V/19kV 1170V/8.16kV nominal voltages (AA)


20.09.2016 11:07:14 AA: On Sep 20, around 5AM the shifters accidentally turned off and on MTPC-R sector 1 HV. It seems that the TPC survived.


VTPC-1 VTPC-2 MTPC-L MTPC-R GAP TPC
18/10/2016 13:50 1210V/1180V/13kV 1060V/13kV 990V/1060V/19kV 990V/1060V/19kV 1020V/0kV -150V in GapTPC and drift voltage down due to FE card replacement (MK)
18/10/2016 15:10 1010V/980V/13kV 1060V/13kV 990V/1060V/19kV 990V/1060V/19kV 1020V/0kV -200V in VTPC-1 due to destabilized gas system! (MK)
19/10/2016 9:15 1060V/1030V/13kV 1060V/13kV 990V/1060V/19kV 990V/1060V/19kV 1020V/0kV VTPC-1 ramping up (MK)
19/10/2016 9:50 1110V/1080V/13kV 1060V/13kV 990V/1060V/19kV 990V/1060V/19kV 1020V/0kV VTPC-1 ramping up (MK)
19/10/2016 11:30 1160V/1130V/13kV 1060V/13kV 990V/1060V/19kV 990V/1060V/19kV 1020V/0kV VTPC-1 ramping up (MK)
19/10/2016 14:50 1190V/1160V/13kV 1060V/13kV 990V/1060V/19kV 990V/1060V/19kV 1020V/0kV VTPC-1 ramping up (MK)
19/10/2016 14:50 1010V/980V/13kV 860V/13kV 790V/860V/19kV 790V/890V/19kV 970V/0kV -200V for the beam tuning (MK)
20/10/2016 11:40 1010V/980V/13kV 860V/13kV 790V/860V/19kV 790V/890V/19kV 970V/8.16kV GapTPC drift field on(MK)
21/10/2016 11:15 1190V/1160V/13kV 1040V/13kV 1040V/970V/19kV 1040V/970V/19kV 1050V/8.16kV 20V below the nominal voltages (AA)
21/10/2016 12:06 1210V/1180V/13kV 1060V/13kV 1060V/990V/19kV 1060V/990V/19kV 1070V/8.16kV nominal voltages (mistaken note in GTPC?) (AA)
21/10/2016 21:31 1010V/980V/13kV 860V/13kV 790V/860V/19kV 790V/860V/19kV 970V/8.16kV -200V for the beam tuning (AA)
22/10/2016 2:10 1210V/1180V/13kV 1060V/13kV 1060V/990V/19kV 1060V/990V/19kV 1170V/8.16kV nominal voltages (AA)
21/10/2016 21:31 1010V/980V/13kV 860V/13kV 790V/860V/19kV 790V/860V/19kV 970V/8.16kV -200V for the high intensity beam tests (MK)
25/10/2016 20:10 910V/880V/13kV 760V/13kV 690V/860V/19kV 690V/860V/19kV 870V/8.16kV -300V for the high intensity beam tests (PP)
25/10/2016 23:45 1210V/1180V/13kV 1060V/13kV 1060V/990V/19kV 1060V/990V/19kV 1170V/8.16kV nominal voltages (AA)
26/10/2016 11:26 910V/880V/13kV 760V/13kV 690V/860V/19kV 690V/860V/19kV 870V/8.16kV -300V for the high intensity beam tests (PP)
26/10/2016 19:37 1210V/1180V/13kV 1060V/13kV 1060V/990V/19kV 1060V/990V/19kV 1170V/8.16kV nominal voltages (MK)


01.11.2016 9AM AA, MK: All TPC HV were switch off for the incoming electrical intervention

VTPC-1 VTPC-2 MTPC-L MTPC-R GAP TPC
2/11/2016 16:45 0V/0V/13kV 0V/13kV 0V/0V/19kV 0V/0V/19kV 0V/8.16kV Started drift voltages (AA)
2/11/2016 18:05 500V/13kV 500V/13kV 500V/19kV 500V/19kV 500V/8.16kV Potential strips ON (MK)
2/11/2016 23:51 730V/700V/13kV 670V/13kV 670V/600V/19kV 670V/600V/19kV 730V/8.16kV (MK)
3/11/2016 8:04 820V/790V/13kV 670V/13kV 670V/600V/19kV 670V/600V/19kV 780V/8.16kV (MK)
3/11/2016 8:42 920V/890V/13kV 770V/13kV 770V/700V/19kV 770V/700V/19kV 880V/8.16kV (MK)
3/11/2016 9:50 970V/940V/13kV 820V/13kV 820V/750V/19kV 820V/750V/19kV 930V/8.16kV (MK)
3/11/2016 10:10 1020V/990V/13kV 870V/13kV 870V/800V/19kV 870V/800V/19kV 930V/8.16kV (MK)
3/11/2016 11:28 1070V/1040V/13kV 920V/13kV 920V/850V/19kV 920V/850V/19kV 980V/8.16kV (MK)
3/11/2016 12:12 1110V/1080V/13kV 960V/13kV 960V/890V/19kV 960V/890V/19kV 1020V/8.16kV (MK)
3/11/2016 14:05 1160V/1130V/13kV 1010V/13kV 1010V/940V/19kV 1010V/940V/19kV 1070V/8.16kV (MK)
3/11/2016 16:30 1190V/1160V/13kV 1040V/13kV 1040V/970V/19kV 1040V/970V/19kV 1150V/8.16kV (MK)
3/11/2016 17:44 1190V/1160V/13kV 1060V/13kV 1060V/990V/19kV 1060V/990V/19kV 1170V/8.16kV Nominal voltages (MK)
5/11/2016 16:45 1190V/1160V/13kV 1060V/13kV 1060V/990V/19kV 1060V/990V/19kV 1210V/8.16kV +40V in GapTPC - tunning after QA (MK)
9/11/2016 0:27 500V/13kV 500V/13kV 500V/19kV 500V/19kV 500V/8.16kV semi-hibernation between p and Pb runs (AA)


14.11.2016 08:42:16 8:40 MK: Beginning of Pb run. Rumping up the amplification. GapTPC is off - to decide if we need it or not.

VTPC-1 VTPC-2 MTPC-L MTPC-R GAP TPC
14/11/2016 8:40 700V/13kV 700V/13kV 700V/19kV 700V/19kV 0V/0kV (MK)
14/11/2016 10:30 800V/770V/13kV 770V/13kV 770V/700V/19kV 770V/700V/19kV 100V/8.16kV (MK)
14/11/2016 11:30 920V/890V/13kV 810V/13kV 810V/740V/19kV 810V/740V/19kV 500V/8.16kV (MK)
14/11/2016 14:00 1010V/980V/13kV 860V/13kV 860V/790V/19kV 860V/790V/19kV 700V/8.16kV (MK)
14/11/2016 14:30 1060V/1030V/13kV 910V/13kV 910V/840V/19kV 910V/840V/19kV 800V/8.16kV (MK)
14/11/2016 15:30 1110V/1080V/13kV 960V/13kV 960V/890V/19kV 960V/890V/19kV 900V/8.16kV (MK)
15/11/2016 10:40 1160V/1130V/13kV 1010V/13kV 1010V/940V/19kV 1010V/940V/19kV 1000V/8.16kV (MK)
15/11/2016 11:22 1160V/1130V/13kV 1010V/13kV 1010V/940V/19kV 1010V/940V/19kV 1050V/8.16kV (MK)
15/11/2016 13:17 1210V/1180V/13kV 1060V/13kV 1060V/990V/19kV 1060V/990V/19kV 1100V/8.16kV Nominal voltages in MTPCs and VTPCs (MK)
15/11/2016 17:43 910V/880V/13kV 760V/13kV 760V/690V/19kV 760V/690V/19kV 800V/8.16kV -300V for the beam tunning (MK)
17/11/2016 19:00 1010V/980V/13kV 860V/13kV 860V/790V/19kV 860V/790V/19kV 900V/8.16kV Rumping up (MK)
17/11/2016 21:00 1110V/1080V/13kV 960V/13kV 960V/890V/19kV 960V/890V/19kV 1000V/8.16kV Rumping up (MK)
17/11/2016 21:52 1160V/1130V/13kV 1010V/13kV 1010V/940V/19kV 1010V/940V/19kV 1080V/8.16kV Rumping up (MK)
17/11/2016 23:50 1210V/1180V/13kV 1060V/13kV 1060V/990V/19kV 1060V/990V/19kV 1150V/8.16kV Nominal voltages (MK)


18.11.2016 20:39:25 MK: Sector 6 in VTPC-1 tripped. It was recovered without problems.

VTPC-1 VTPC-2 MTPC-L MTPC-R GAP TPC
18/11/2016 20:40 1210V/1180V/13kV 1060V/13kV 1060V/990V/19kV 1060V/990V/19kV 1150V/8.16kV Nominal voltages (MK)
24/11/2016 13:23 910V/880V/13kV 760V/13kV 760V/690V/19kV 760V/690V/19kV 850V/8.16kV -300V for the beam tunning (MK)
24/11/2016 13:23 1060V/1030V/13kV 910V/13kV 910V/840V/19kV 910V/840V/19kV 1000V/8.16kV Rumping up (MK)
25/11/2016 2:36 1210V/1180V/13kV 1060V/13kV 1060V/990V/19kV 1060V/990V/19kV 1170V/8.16kV Nominal voltages, +20V in GapTPC(MK)


25.11.2016 12:04:20 MK: Sector 5 and 6 in VTPC-1 tripped. They was recovered without problems.

VTPC-1 VTPC-2 MTPC-L MTPC-R GAP TPC
25/11/2016 12:06 1210V/1180V/13kV 1060V/13kV 1060V/990V/19kV 1060V/990V/19kV 1170V/8.16kV Nominal voltages, +20V in GapTPC(MK)

1.12.2016 10:00:27 : Sector 1 and 6 in VTPC-1 tripped. They was recovered without problems.

VTPC-1 VTPC-2 MTPC-L MTPC-R GAP TPC
1.12.2016 10:40:35 1210V/1180V/13kV 1060V/13kV 1060V/990V/19kV 1060V/990V/19kV 1170V/8.16kV (MK, TM, PP)

4.12.2016 18:08:12 MK: Due to TPC with high frequency gate opening the current limit changed to 5uA. After the test settings were restored - 1uA for VTPC2 and MTPCs and 2uA for VTPC1.

5/12/2016 8:09 910V/880V/13kV 760V/13kV 760V/690V/19kV 760V/690V/19kV 870V/8.16kV -300V for the beam tunning (MK)
6/12/2016 5:42 1210V/1180V/13kV 1060V/13kV 1060V/990V/19kV 1060V/990V/19kV 1170V/8.16kV Nominal voltages (MK)
6/12/2016 13:02 910V/880V/13kV 760V/13kV 760V/690V/19kV 760V/690V/19kV 870V/8.16kV -300V for the beam tunning (MK)
6/12/2016 19:31 1210V/1180V/13kV 1060V/13kV 1060V/990V/19kV 1060V/990V/19kV 1170V/8.16kV Nominal voltages (MK)
7/12/2016 10:47 1210V/1180V/13kV 1060V/13kV 1060V/990V/19kV 0V/0V/0kV 1170V/8.16kV MTPC-R off (pot. strips on) (AA)
7/12/2016 18:25 1210V/1180V/13kV 1060V/13kV 1060V/990V/19kV 1060V/990V/19kV 1170V/8.16kV Nominal voltages (MK)
  273   Thu, 15.06.2017 19:01:42 M. Kuich, P. PodlaskiTPC HV status.
amplification voltage/drift voltage

VTPC-1 VTPC-2 MTPC-L MTPC-R GAP TPC
15/06/2017 19:05 0V/0.5kV 0V/0.5kV 0V/0.5kV 0V/0.5kV 0V/0.5kV (MK)
15/06/2017 22:28 0V/6.5kV 0V/6.5kV 0V/9.5kV 0V/9.5kV 0V/4.2kV (MK)
16/06/2017 11:26 0V/13kV 0V/13kV 0V/19kV 0V/19kV 0V/8.16kV Full drift voltage and potential strips ON (MK)
16/06/2017 23:00 300V/13kV 300V/13kV 300V/19kV 300V/19kV 300V/8.16kV - (PP)
17/06/2017 09:00 400V/13kV 400V/13kV 400V/19kV 400V/19kV 400V/8.16kV - (PP)
17/06/2017 10:06 500V/13kV 500V/13kV 500V/19kV 500V/19kV 500V/8.16kV - (PP)
17/06/2017 15:20 600V/13kV 600V/13kV 600V/19kV 600V/19kV 600V/8.16kV - (PP)
17/06/2017 19:40 700V/13kV 700V/13kV 700V/19kV 700V/19kV 700V/8.16kV - (MK)
18/06/2017 00:10 750V/13kV 750V/13kV 750V/19kV 750V/19kV 750V/8.16kV - (WD)
18/06/2017 06:55 800V/13kV 800V/13kV 800V/19kV 800V/19kV 800V/8.16kV - (WD)
18/06/2017 12:30 870V/870V/13kV 850V/13kV 800V/870V/19kV 800V/870V/19kV 850V/8.16kV - (MK)
18/06/2017 13:55 900V/890V/13kV 870V/13kV 800V/870V/19kV 800V/870V/19kV 860V/8.16kV - (PP)
18/06/2017 15:00 940V/920V/13kV 870V/13kV 800V/870V/19kV 800V/870V/19kV 910V/8.16kV - (PP)
18/06/2017 15:30 1000V/970V/13kV 870V/13kV 800V/870V/19kV 800V/870V/19kV 960V/8.16kV - (PP)
18/06/2017 17:38 1060V/1030V/13kV 910V/13kV 840V/910V/19kV 840V/910V/19kV 1000V/8.16kV - (PP)
19/06/2017 19:50 1110V/1080V/13kV 960V/13kV 890V/960V/19kV 890V/960V/19kV 1050V/8.16kV in 25V steps (PP)
19/06/2017 20:58 1150V/1120V/13kV 1000V/13kV 930V/1000V/19kV 930V/960V/19kV 1090V/8.16kV - (PP)
20/06/2017 01:30 1170V/1140V/13kV 1020V/13kV 950V/1020V/19kV 950V/1020V/19kV 1110V/8.16kV - (PP)
20/06/2017 13:06 1210V/1180V/13kV 1060V/13kV 990V/1060V/19kV 990V/1060V/19kV 1150V/8.16kV Full voltages on sense wires in small steps (PP)
20/06/2017 13:06 1210V/1180V/13kV 1060V/13kV 990V/1060V/19kV 490V/560V/19kV 1150V/8.16kV MTPC-R -500V due to compresor replacement (PP)


3.07.2017 17:41:22 HV in 5 TPCs switched off. Beam is over.
Attachment 1: printscreen_273_20170702-103103.png
printscreen_273_20170702-103103.png
Attachment 2: printscreen_273_20170702-103120.png
printscreen_273_20170702-103120.png
Attachment 3: printscreen_273_20170702-103131.png
printscreen_273_20170702-103131.png
Attachment 4: printscreen_273_20170702-103138.png
printscreen_273_20170702-103138.png
Attachment 5: printscreen_273_20170702-103145.png
printscreen_273_20170702-103145.png
Attachment 6: printscreen_273_20170702-103151.png
printscreen_273_20170702-103151.png
Attachment 7: printscreen_273_20170702-103158.png
printscreen_273_20170702-103158.png
Attachment 8: printscreen_273_20170702-103204.png
printscreen_273_20170702-103204.png
Attachment 9: printscreen_273_20170702-103210.png
printscreen_273_20170702-103210.png
Attachment 10: printscreen_273_20170702-103216.png
printscreen_273_20170702-103216.png
Attachment 11: printscreen_273_20170702-103234.png
printscreen_273_20170702-103234.png
  104   Fri, 11.11.2011 02:43:25 A. AduszkiewiczTPC HV status
Chamber voltages are 30V below the nominal value. I'm afraid to go higher, since I have no tool to verify the results (DAQ crashes a lot).

GAP TPC 150V below the nominal value. This is because occasionally I saw beam particles saturating ADCs of several adjacent pads.
  217   Mon, 8.09.2014 18:13:44 A.Aduszkiewicz, M.KuichTPC HV status
amplification voltage/drift voltage

VTPC-1 VTPC-2 MTPC-L MTPC-R GAP TPC
8/09/2014 18:00 0V/0kV 0V/1kV 0V/1kV 0V/1kV 0V/1kV Potential strips ON 60V; VTPC-1 HV cable is disconnected due to works related to the H2 line concrete shielding installation
10/09/2014 19:50 1V/1kV 10V/1kV 10V/1kV 10V/1kV 10V/1kV
11/09/2014 11:05 100V/6.5kV 100V/6.5kV 100V/9kV 100V/9kV 100V/5kV
11/09/2014 14:10 300V/6.5kV 300V/6.5kV 300V/9kV 300V/9kV 300V/5kV
11/09/2014 18:20 500V/10kV 500V/10kV 500V/15kV 500V/15kV 500V/8kV
12/09/2014 14:10 600V/10kV 600V/10kV 600V/15kV 600V/15kV 600V/8kV
12/09/2014 15:50 650V/11.7kV 650V/11.7kV 650V/17.1kV 650V/17.1kV 650V/9.2kV
12/09/2014 17:15 700V/11.7kV 700V/11.7kV 700V/17.1kV 700V/17.1kV 700V/9.2kV
13/09/2014 14:50 (825V/795V)/13kV 775V/13kV 775V/19kV 775V/19kV 775V/10.2kV
13/09/2014 17:40 (930V/900V)/13kV 820V/13kV (780V/820V)/19kV (780V/820V)/19kV 860V/10.2kV
14/09/2014 16:20 (1020V/990V)/13kV 870V/13kV (800V/870V)/19kV (800V/870V)/19kV 930V/10.2kV
14/09/2014 22:25 (720V/690V)/13kV 570V/13kV (500V/570V)/19kV (500V/570V)/19kV 630V/10.2kV Voltages lowered for the night with no shifts
15/09/2014 10:20 (950V/920V)/13kV 800V/13kV (730V/800V)/19kV (730V/800V)/19kV 860V/10.2kV
15/09/2014 14:03 (1020V/990V)/13kV 870V/13kV (800V/870V)/19kV (800V/870V)/19kV 930V/10.2kV
15/09/2014 23:15 (980V/950V)/13kV 830V/13kV (760V/830V)/19kV (760V/830V)/19kV 890V/10.2kV Voltages lowered because the gating grid is not closed
15/09/2014 23:15 (880V/850V)/13kV 730V/13kV (660V/730V)/19kV (660V/730V)/19kV 790V/10.2kV Voltages lowered because the gating grid is not closed
16/09/2014 06:07 (580V/550V)/13kV 430V/13kV (360V/430V)/19kV (360V/430V)/19kV 490V/10.2kV Voltages lowered because the floating current in sector 17 in MTPC-L up to 45nA.
16/09/2014 11:55 (880V/850V)/13kV 730V/13kV (660V/530V)/19kV (660V/730V)/19kV 790V/10.2kV MTPC-Ls voltage is lower because of high and floating current in sector 17 (now it is 17nA).
16/09/2014 13:35 (940V/910V)/13kV 790V/13kV (720V/750V)/19kV (720V/790V)/19kV 850V/10.2kV MTPC-Ls voltage is lower because of high and floating current in sector 17 (now it is 14nA).
16/09/2014 15:50 (1000V/970V)/13kV 850V/13kV (780V/850V)/19kV (780V/850V)/19kV 910V/10.2kV
16/09/2014 16:45 (1010V/980V)/13kV 860V/13kV (780V/850V)/19kV (790V/860V)/19kV 920V/10.2kV MTPC-Ls voltage is lower because of high and floating current in sector 17 (now it is 6nA).
16/09/2014 18:45 (1010V/980V)/13kV 860V/13kV (780V/850V)/19kV (810V/880V)/19kV 920V/10.2kV MTPC-Ls voltage is lower because of high and floating current in sector 17 (now it is 4nA).
16/09/2014 19:25 (1010V/980V)/13kV 860V/13kV (780V/850V)/19kV (820V/890V)/19kV 920V/10.2kV Voltage in other TPCs are not increased because of high current.
16/09/2014 20:10 (1010V/980V)/13kV 860V/13kV (780V/850V)/19kV (830V/900V)/19kV 920V/10.2kV Voltage in other TPCs are not increased because of high current.
16/09/2014 20:50 (1010V/980V)/13kV 860V/13kV (800V/870V)/19kV (840V/910V)/19kV 920V/10.2kV Voltage in other TPCs are not increased because of high current.
16/09/2014 21:42 (1010V/980V)/13kV 860V/13kV (800V/870V)/19kV (850V/920V)/19kV 920V/10.2kV Voltage in other TPCs are not increased because of high current.
16/09/2014 22:20 (1010V/980V)/13kV 860V/13kV (805V/875V)/19kV (860V/930V)/19kV 920V/10.2kV Voltage in other TPCs are not increased because of high current.
16/09/2014 23:00 (1010V/980V)/13kV 860V/13kV (810V/880V)/19kV (870V/940V)/19kV 920V/10.2kV Voltage in other TPCs are not increased because of high current.
16/09/2014 23:44 (1010V/980V)/13kV 860V/13kV (815V/880V)/19kV (880V/950V)/19kV 920V/10.2kV Voltage in other TPCs are not increased because of high current.
17/09/2014 00:41 (1010V/980V)/13kV 860V/13kV (815V/880V)/19kV (890V/960V)/19kV 920V/10.2kV Voltage in other TPCs are not increased because of high current.
17/09/2014 00:57 (910V/880V)/13kV 760V/13kV (715V/780V)/19kV (890V/960V)/19kV 820V/10.2kV Voltage in other TPCs are decreased for the night to more safe level.
17/09/2014 05:57 (910V/880V)/13kV 760V/13kV (715V/780V)/19kV (890V/960V)/19kV 820V/10.2kV Voltage in the sector 17 of MTPC-L decreased to 550V due to floating current.
17/09/2014 15:14 (935V/905V)/13kV 810V/13kV (730V/800V)/19kV (890V/960V)/19kV 870V/10.2kV Voltage in the sector 17 of MTPC-L is set to 600V.
17/09/2014 17:01 (970V/940V)/13kV 860V/13kV (730V/800V)/19kV (890V/960V)/19kV 890V/10.2kV Voltage in the sector 17 of MTPC-L is set to 600V.
17/09/2014 17:31 (980V/950V)/13kV 875V/13kV (730V/800V)/19kV (890V/960V)/19kV 900V/10.2kV Voltage in the sector 17 of MTPC-L is set to 600V.
17/09/2014 18:08 (990V/960V)/13kV 890V/13kV (730V/825V)/19kV (890V/960V)/19kV 900V/10.2kV Voltage in the sector 17 of MTPC-L is set to 650V.
17/09/2014 18:52 (1000V/970V)/13kV 900V/13kV (770V/840V)/19kV (890V/960V)/19kV 910V/10.2kV Voltage in the sector 17 of MTPC-L is set to 675V.
17/09/2014 19:42 (1000V/970V)/13kV 910V/13kV (770V/840V)/19kV (900V/970V)/19kV 910V/10.2kV Voltage in the sector 17 of MTPC-L is set to 675V.
17/09/2014 21:50 (800V/770V)/13kV 910V/13kV (770V/840V)/19kV (900V/970V)/19kV 910V/10.2kV Voltage in the sector 17 of MTPC-L is set to 675V; VTPC-1 voltage decreased as there was over 60nA current in sector 1
17/09/2014 22:47 (600V/570V)/13kV 910V/13kV (770V/840V)/19kV (900V/970V)/19kV 910V/10.2kV Voltage in the sector 17 of MTPC-L is set to 675V; VTPC-1 current still around 40nA, thus decreasing the voltage
18/09/2014 04:17 (600V/570V)/13kV 610V/13kV (770V/840V)/19kV (900V/970V)/19kV 910V/10.2kV Voltage in the sector 17 of MTPC-L is set to 675V; VTPC-2 current increased to around 80nA
18/09/2014 10:25 (600V/570V)/13kV 710V/13kV (790V/860V)/19kV (900V/970V)/19kV 910V/10.2kV Voltage in the sector 17 of MTPC-L is set to 695V.
18/09/2014 11:55 (600V/570V)/13kV 700V/13kV (810V/880V)/19kV (900V/970V)/19kV 910V/10.2kV Voltage in the sector 17 of MTPC-L is set to 715V.
18/09/2014 14:22 (600V/570V)/13kV 700V/13kV (810V/880V)/19kV (900V/970V)/19kV 910V/10.2kV Voltage in the sector 17 of MTPC-L is set to 900V - standard value
18/09/2014 15:33 (600V/570V)/13kV 700V/13kV (910V/980V)/19kV (900V/970V)/19kV 910V/10.2kV
18/09/2014 17:47 (600V/570V)/13kV 700V/13kV (950V/1010V)/19kV (900V/970V)/19kV 910V/10.2kV
18/09/2014 20:02 (600V/570V)/13kV 700V/13kV (920V/980V)/19kV (900V/970V)/19kV 910V/10.2kV
19/09/2014 00:07 (600V/570V)/13kV 700V/13kV (920V/980V)/19kV (700V/770V)/19kV 910V/10.2kV Voltage in MTPC-R is set to safe values for night; notice that the current in the sector 17 of MTPC-L is high (40-50nA).
19/09/2014 11:30? (600V/570V)/13kV 700V/13kV (920V/980V)/19kV (500V/570V)/19kV 910V/10.2kV Voltage in MTPC-R is set to even safer values; current in the sector 7 of MTPC-L is high (70nA).
19/09/2014 13:00 (900V/870V)/13kV 700V/13kV (920V/980V)/19kV (500V/570V)/19kV 910V/10.2kV
19/09/2014 14:00 (910V/880V)/13kV 700V/13kV (920V/980V)/19kV (500V/570V)/19kV 910V/10.2kV
19/09/2014 15:11 (920V/890V)/13kV 700V/13kV (920V/980V)/19kV (500V/570V)/19kV 910V/10.2kV
19/09/2014 15:45 (820V/790V)/13kV 700V/13kV (920V/980V)/19kV (500V/570V)/19kV 910V/10.2kV Voltage in the sector 3 of VTPC-1 decreased to 690V due to current over 110nA
19/09/2014 17:05 (820V/790V)/13kV 700V/13kV (500V/570V)/19kV (500V/570V)/19kV 940V/10.2kV Voltage in the sector 3 of VTPC-1 decreased to 690V.
19/09/2014 18:00 (820V/790V)/13kV 700V/13kV (500V/570V)/19kV (500V/570V)/19kV 950V/10.2kV Voltage in the sector 3 of VTPC-1 decreased to 690V.
19/09/2014 21:00 (820V/790V)/13kV 700V/13kV (500V/570V)/19kV (500V/570V)/19kV 1125V/10.2kV Voltage in the sector 3 of VTPC-1 decreased to 690V.
19/09/2014 22:13 (820V/790V)/13kV 700V/13kV (300V/370V)/19kV (300V/370V)/19kV 1125V/10.2kV Voltage in the sector 3 of VTPC-1 decreased to 690V.
19/09/2014 23:55 (820V/790V)/13kV 700V/13kV (100V/170V)/19kV (100V/170V)/19kV 1130V/10.2kV Voltage in the sector 3 of VTPC-1 decreased to 690V; GAP TPC tuning not included in the logbook (several small changes done in the past hour. 1130V is the final voltage)
20/09/2014 10:30 (1100V/1070V)/13kV 700V/13kV (100V/170V)/19kV (100V/170V)/19kV 830V/10.2kV End of the GAP TPC calibration
20/09/2014 12:58 (1100V/1070V)/13kV 700V/13kV (100V/170V)/19kV (100V/170V)/19kV 830V/10.2kV During data taking the current in the sector 2 of VTPC-1 was floating in range 20-125nA; voltage in the sector 2 of VTPC-1 set to 970V.
20/09/2014 13:23 (1100V/1070V)/13kV 700V/13kV (100V/170V)/19kV (100V/170V)/19kV 830V/10.2kV Current in the sector 2 of VTPC-1 was floating up to 50nA; voltage in the sector 2 of VTPC-1 set to 870V.
20/09/2014 20:45 (1100V/1070V)/13kV 800V/13kV (100V/170V)/19kV (100V/170V)/19kV 830V/10.2kV Current in the sector 2 of VTPC-1 was floating up to 50nA; voltage in the sector 2 of VTPC-1 set to 920V. HV in MTPC-L sec. 3 was increased to 340V, but now is back again at 170V after current increased to 108nA.
20/09/2014 21:40 (1100V/1070V)/13kV 860V/13kV (100V/170V)/19kV (100V/170V)/19kV 830V/10.2kV Current in the sector 2 of VTPC-1 was floating up to 50nA; voltage in the sector 2 of VTPC-1 set to 920V. HV in MTPC-L sec. 3 decreased to 50V, after current increased to 65nA.
20/09/2014 21:40 (1100V/1070V)/13kV 890V/13kV (100V/170V)/19kV (100V/170V)/19kV 830V/10.2kV Current in the sector 2 of VTPC-1 was floating up to 50nA; voltage in the sector 2 of VTPC-1 set to 920V. HV in MTPC-L sec. 3 decreased to 0V, after current increased to 50nA.
21/09/2014 9:56 (1100V/1070V)/13kV 960V/13kV (100V/170V)/19kV (100V/170V)/19kV 830V/10.2kV VTPC-1 sec. 2 set to 920V. MTPC-L sec. 3 set to 0V
21/09/2014 15:10 (1100V/1070V)/13kV 960V/13kV (100V/170V)/19kV (100V/170V)/19kV 830V/10.2kV VTPC-1 sec. 2 set to 960V. MTPC-L sec. 3 set to 0V
21/09/2014 16:10 (1100V/1070V)/13kV 960V/13kV (100V/170V)/19kV (100V/170V)/19kV 830V/10.2kV VTPC-1 sec. 2 set to 980V. MTPC-L sec. 3 set to 0V
21/09/2014 17:05 (1100V/1070V)/13kV 960V/13kV (100V/170V)/19kV (100V/170V)/19kV 830V/10.2kV VTPC-1 sec. 2 set to 1000V. MTPC-L sec. 3 set to 0V
21/09/2014 ~19:00 (1100V/1070V)/13kV 960V/13kV 0V/19kV 0V/19kV 830V/10.2kV VTPC-1 sec. 2 set to 1000V.


22.09.2014 00:15:16 VTPC-1 currents are normal (6nA) with 1070V in sector 2. This is correlated with reduced humidity in the VTPC hut.

Shutting down all the voltages.
  222   Sun, 26.10.2014 14:50:19 A.Aduszkiewicz, M.KuichTPC HV status
amplification voltage/drift voltage

VTPC-1 VTPC-2 MTPC-L MTPC-R GAP TPC
26/10/2014 14:46 0V/0.5kV 0V/0.5kV 0V/0.5kV 0V/0.5kV 0V/0.5kV
27/10/2014 10:31 0V/6.5kV 0V/0.5kV 0V/0.5kV 0V/0.5kV 0V/0.5kV
27/10/2014 18:41 0V/10kV 0V/6.5kV 0V/0.5kV 0V/10kV 0V/5kV Potential strips on, except of the MTP-L
28/10/2014 10:24 0V/13kV 0V/13kV 0V/0.5kV 0V/19kV 0V/10.2kV
28/10/2014 11:25 (710V/680V)/13kV 560V/13kV 0V/5kV (560V/490V)/19kV 620V/10.2kV All potential strips on
28/10/2014 19:00 (810V/780V)/13kV 660V/13kV (170V/100V)/10kV (660V/590V)/19kV 720V/10.2kV
29/10/2014 10:00 (860V/830V)/13kV 710V/13kV (610V/540V)/19kV (710V/640V)/19kV 770V/10.2kV
29/10/2014 14:16 (910V/880V)/13kV 760V/13kV (710V/640V)/19kV (760V/690V)/19kV 820V/10.2kV
29/10/2014 17:40 (960V/930V)/13kV 810V/13kV (760V/690V)/19kV (810V/740V)/19kV 870V/10.2kV
30/10/2014 10:54 (1010V/980V)/13kV 860V/13kV (830V/765V)/19kV (860V/790V)/19kV 920V/10.2kV
30/10/2014 14:50 (1020V/990V)/13kV 870V/13kV (870V/800V)/19kV (870V/800V)/19kV 930V/10.2kV
30/10/2014 17:00 (1040V/1010V)/13kV 890V/13kV (890V/820V)/19kV (890V/820V)/19kV 950V/10.2kV
31/10/2014 10:17 (1050V/1020V)/13kV 900V/13kV (900V/830V)/19kV (900V/830V)/19kV 960V/10.2kV
31/10/2014 12:17 (1070V/1040V)/13kV 920V/13kV (920V/850V)/19kV (920V/850V)/19kV 980V/10.2kV
31/10/2014 17:53 (1090V/1060V)/13kV 940V/13kV (940V/870V)/19kV (940V/870V)/19kV 1000V/10.2kV
31/10/2014 21:09 (1100V/1070V)/13kV 950V/13kV (950V/880V)/19kV (950V/880V)/19kV 1010V/10.2kV
31/10/2014 21:57 (1110V/1080V)/13kV 960V/13kV (960V/890V)/19kV (960V/890V)/19kV 1020V/10.2kV
1/11/2014 15:16 (1120V/1090V)/13kV 970V/13kV (970V/900V)/19kV (970V/900V)/19kV 1030V/10.2kV
1/11/2014 17:15 (1110V/1080V)/13kV 970V/13kV (970V/900V)/19kV (970V/900V)/19kV 1030V/10.2kV Voltages decreased in the VTPC-1 due to Kr calibration.
1/11/2014 17:30 (1110V/1080V)/13kV 980V/13kV (980V/910V)/19kV (980V/910V)/19kV 1040V/10.2kV
1/11/2014 20:08 (1100V/1070V)/13kV 990V/13kV (990V/920V)/19kV (990V/920V)/19kV 1050V/10.2kV Operational voltage for the Kr calibration in the VTPC-1.
2/11/2014 10:06 (1100V/1070V)/13kV 1010V/13kV (1010V/940V)/19kV (1010V/940V)/19kV 1070V/10.2kV
2/11/2014 11:59 (1100V/1070V)/13kV 1020V/13kV (1020V/950V)/19kV (1020V/950V)/19kV 1080V/10.2kV
2/11/2014 14:02 (1100V/1070V)/13kV 1030V/13kV (1030V/960V)/19kV (1030V/960V)/19kV 1100V/10.2kV
2/11/2014 15:27 (1100V/1070V)/13kV 1040V/13kV (1040V/970V)/19kV (1040V/970V)/19kV 1120V/10.2kV
2/11/2014 17:00 (1130V/1100V)/13kV 1050V/13kV (1050V/980V)/19kV (1050V/980V)/19kV 1130V/10.2kV
2/11/2014 17:50 (1140V/1110V)/13kV 1050V/13kV (1050V/980V)/19kV (1050V/980V)/19kV 1140V/10.2kV
2/11/2014 20:14 (1150V/1120V)/13kV 1050V/13kV (1050V/980V)/19kV (1050V/980V)/19kV 1140V/10.2kV
2/11/2014 21:01 (1160V/1130V)/13kV 1050V/13kV (1050V/980V)/19kV (1050V/980V)/19kV 1140V/10.2kV
2/11/2014 21:52 (1170V/1140V)/13kV 1050V/13kV (1050V/980V)/19kV (1050V/980V)/19kV 1140V/10.2kV
2/11/2014 22:26 (1180V/1150V)/13kV 1050V/13kV (1050V/980V)/19kV (1050V/980V)/19kV 1140V/10.2kV
2/11/2014 22:53 (1190V/1160V)/13kV 1050V/13kV (1050V/980V)/19kV (1050V/980V)/19kV 1140V/10.2kV
2/11/2014 23:13 (1200V/1170V)/13kV 1050V/13kV (1050V/980V)/19kV (1050V/980V)/19kV 1140V/10.2kV
2/11/2014 23:19 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990V)/19kV 1150V/10.2kV All TPCs are on the nominal voltages
3/11/2014 17:10 (1100V/1070V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990V)/19kV 1150V/10.2kV Voltages decreased in the VTPC-1 for Kr calibration.
4/11/2014 17:20 (1100V/1070V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990V)/19kV 1130V/10.2kV Voltage decreased in the GAP TPC for Kr calibration.
4/11/2014 18:26 (1100V/1070V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990V)/19kV 1100V/10.2kV Final voltage tuning for the GAP TPC Kr calibration.
5/11/2014 18:05 (1130V/1100V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990V)/19kV 1100V/10.2kV
5/11/2014 18:47 (1150V/1120V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990V)/19kV 1100V/10.2kV
5/11/2014 22:43 (1170V/1140V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990V)/19kV 1120V/10.2kV
6/11/2014 14:22 (1190V/1160V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990V)/19kV 1135V/10.2kV
6/11/2014 16:50 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990V)/19kV 1150V/10.2kV All TPCs are on the nominal voltages
10/11/2014 18:25 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990V)/19kV 0V/0V GAP TPC switched off
10/11/2014 19:30 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990V)/19kV 1150V/10.2kV GAP TPC switched on
11/11/2014 22:47 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990V)/19kV 0V/0V GAP TPC switched off
12/11/2014 10:30 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990V)/19kV 1100V/10.2kV GAP TPC voltage set for Kr calibration
12/11/2014 23:59 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990V)/19kV 1150V/10.2kV GAP TPC voltage increased to the nominal value
25/11/2014 17:40 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990V)/19kV 1100V/10.2kV GAP TPC voltage set for Kr calibration. Previous setting attached as a screenshot.
26/11/2014 18:48 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990V)/19kV 1150V/10.2kV GAP TPC voltage increased to the nominal value
09/12/2014 03:10 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (860V/790V)/19kV 1150V/10.2kV MTPC-R sense wire voltage decreased due to compressor problems. TPC is isolated.
09/12/2014 04:10 (1210V/1180V)/13kV 1060V/13kV (860V/790V)/19kV (860V/790V)/19kV 1150V/10.2kV MTPC-L sense wire voltage decreased due to compressor problems. TPC is be isolated.
09/12/2014 15:05 (1210V/1180V)/13kV 1060V/13kV (960V/890V)/19kV (960V/890V)/19kV 1150V/10.2kV MTPC-L sense wire voltage 100V below the nominal value
10/12/2014 04:07 (1210V/1180V)/13kV 1060V/13kV (1000V/930V)/19kV (1000V/930V)/19kV 1150V/10.2kV MTPC-L sense wire voltage 60V below the nominal value
10/12/2014 04:07 (1210V/1180V)/13kV 1060V/13kV (1020V/950V)/19kV (1020V/950V)/19kV 1150V/10.2kV MTPC-L sense wire voltage 40V below the nominal value
10/12/2014 13:44 (1210V/1180V)/13kV 1060V/13kV (1040V/970V)/19kV (1040V/970V)/19kV 1150V/10.2kV MTPCs sense wire voltage 20V below the nominal values
10/12/2014 15:00 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990V)/19kV 1150V/10.2kV MTPCs sense wire voltage at the nominal values
15/12/2014 08:40 (0V/0V)/0kV 0V/0kV (0V/0V)/0kV (0V/0V)/0kV 0V/0kV TPCs sense wire voltage turned off
Attachment 1: b4KrGTPC.png
b4KrGTPC.png
  235   Tue, 3.02.2015 18:43:06 M. Kuich, T. Czopowicz, A.AduszkiewiczTPC HV status
amplification voltage/drift voltage

VTPC-1 VTPC-2 MTPC-L MTPC-R GAP TPC (MK)
3/02/2015 18:37 0V/0.5kV 0V/0.5kV 0V/0.5kV 0V/0.5kV 0V/0.5kV (MK)
4/02/2015 15:10 0V/6.5kV 0V/6.5kV 0V/9.5kV 0V/9.5kV 0V/5.1kV Potential strips ON (MK)
4/02/2015 17:02 10V/13kV 10V/13kV 10V/19kV 10V/19kV 10V/10.2kV (MK)
5/02/2015 09:36 100V/13kV 100V/13kV 100V/19kV 100V/19kV 100V/10.2kV (MK)
5/02/2015 10:42 200V/13kV 200V/13kV 200V/19kV 200V/19kV 200V/10.2kV (MK)
5/02/2015 13:02 300V/13kV 300V/13kV 300V/19kV 300V/19kV 300V/10.2kV (MK)
5/02/2015 14:40 400V/13kV 400V/13kV 400V/19kV 400V/19kV 400V/10.2kV (MK)
5/02/2015 16:05 500V/13kV 500V/13kV 500V/19kV 500V/19kV 500V/10.2kV (MK)
5/02/2015 16:47 (580V/550V)/13kV 560V/13kV (580V/510V)/19kV (580V/510)/19kV 560V/10.2kV (MK)
6/02/2015 08:31 (630V/600V)/13kV 610V/13kV (630V/560V)/19kV (630V/560)/19kV 610V/10.2kV (MK)
6/02/2015 09:42 (680V/650V)/13kV 660V/13kV (680V/610V)/19kV (680V/610)/19kV 660V/10.2kV (MK)
6/02/2015 10:41 (730V/700V)/13kV 710V/13kV (730V/660V)/19kV (730V/660)/19kV 710V/10.2kV (MK)
6/02/2015 13:09 (810V/780V)/13kV 780V/13kV (780V/710V)/19kV (780V/710)/19kV 790V/10.2kV (MK)
6/02/2015 15:55 (870V/840V)/13kV 830V/13kV (830V/760V)/19kV (830V/760)/19kV 840V/10.2kV (MK)
6/02/2015 15:55 (890V/860V)/13kV 840V/13kV (840V/770V)/19kV (840V/770)/19kV 860V/10.2kV (MK)
6/02/2015 15:55 (910V/880V)/13kV 850V/13kV (850V/780V)/19kV (850V/780)/19kV 880V/10.2kV (MK)
7/02/2015 11:15 (930V/900V)/13kV 870V/13kV (870V/800V)/19kV (870V/800)/19kV 900V/10.2kV (TC)
7/02/2015 12:30 (950V/920V)/13kV 890V/13kV (890V/820V)/19kV (890V/820)/19kV 920V/10.2kV (TC)
7/02/2015 13:30 (970V/940V)/13kV 910V/13kV (910V/840V)/19kV (910V/840)/19kV 940V/10.2kV (TC)
7/02/2015 14:20 (990V/960V)/13kV 930V/13kV (920V/850V)/19kV (920V/850)/19kV 960V/10.2kV (TC)
7/02/2015 15:40 (1010V/980V)/13kV 950V/13kV (920V/850V)/19kV (920V/850)/19kV 980V/10.2kV (TC)
8/02/2015 12:08 (1060V/1030V)/13kV 1000V/13kV (970V/900V)/19kV (970V/900)/19kV 1030V/10.2kV (MK)
8/02/2015 18:55 (1110V/1080V)/13kV 1020V/13kV (1010V/940V)/19kV (1010V/940)/19kV 1080V/10.2kV (AA)
9/02/2015 08:45 (1150V/1120V)/13kV 1040V/13kV (1030V/960V)/19kV (1030V/960)/19kV 1120V/10.2kV (MK)
9/02/2015 15:00 (1190V/1160V)/13kV 1045V/13kV (1045V/975V)/19kV (1045V/975)/19kV 1135V/10.2kV (MK)
9/02/2015 15:00 (1200V/1170V)/13kV 1055V/13kV (1055V/985V)/19kV (1055V/985)/19kV 1145V/10.2kV (MK)
10/02/2015 10:00 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990)/19kV 1150V/10.2kV TPCs at the nominal voltages(AA)
10/02/2015 17:28 (1160V/1130V)/13kV 1010V/13kV (1060V/990V)/19kV (1060V/990)/19kV 1050V/10.2kV Voltages lowered due to beam tuning (MK)
11/02/2015 10:02 (1130V/1100V)/13kV 980V/13kV (1030V/960V)/19kV (1030V/960)/19kV 1000V/10.2kV Voltages lowered due to currents during beam tuning (MK)
11/02/2015 22:24 (1130V/1100V)/13kV 980V/13kV (1030V/960V)/19kV (1030V/960)/19kV 0V/ 0 kV GAP TPC OFF (MK,AA)
11/02/2015 23:11 (1130V/1100V)/13kV 980V/13kV (1030V/960V)/19kV (1030V/960)/19kV 500V/10.2kV GAP TPC ON again (MK)
12/02/2015 01:46 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990)/19kV 500V/10.2kV TPPCs at the nominal volages without Gap TPC (MK)
12/02/2015 11:21 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990)/19kV 900V/10.2kV Rumping up the Gap TPC (100V steps) (MK)
12/02/2015 13:22 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990)/19kV 950V/10.2kV Rumping up the Gap TPC (MK)
12/02/2015 13:52 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990)/19kV 1000V/10.2kV Rumping up the Gap TPC (MK)
12/02/2015 14:34 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990)/19kV 1050V/10.2kV Rumping up the Gap TPC (MK)
12/02/2015 17:53 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990)/19kV 1100V/10.2kV Rumping up the Gap TPC (25V steps)(MK)
12/02/2015 21:10 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990)/19kV 1150V/10.2kV Rumping up the Gap TPC (10V steps). GapTPC at the nominal voltage.(MK)
13/02/2015 2:00 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990)/19kV 1170V/10.2kV (AA)
13/02/2015 22:00 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990)/19kV 1190V/10.2kV (AA)
15/02/2015 19:57 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990)/19kV 1190V/8.37kV Drift field in the GapTPC reduced due to lower vd in the chamber (MK)
16/02/2015 21:31 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990)/19kV 0V/0kV GAP TPC off (AA)
17/02/2015 4:02 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990)/19kV 1000V/8.37kV (AA)
17/02/2015 5:34 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990)/19kV 1190V/8.37kV (AA)
10/03/2015 11:55 (1010V/980V)/13kV 860V/13kV (860V/990V)/19kV (860V/990)/19kV 990V/8.37kV Wire voltages decreased by 200V for beam tuning (AA)
10/03/2015 20:55 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990)/19kV 1190V/8.37kV Back to the nominal voltages (AA)
18/03/2015 08:44 (910V/880V)/13kV 760V/13kV (760V/690V)/19kV (760V/690)/19kV 890V/8.37kV Wire voltages decreased by 300V for beam tuning(MK)
18/03/2015 22:21 (1010V/980V)/13kV 860V/13kV (860V/790V)/19kV (860V/790)/19kV 990V/8.37kV -200V (AA)
18/03/2015 22:40 (1060V/1030V)/13kV 910V/13kV (910V/840V)/19kV (910V/840)/19kV 1040V/8.37kV -150V (AA)
18/03/2015 23:45 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990)/19kV 1190V/8.37kV Back to the nominal voltages (AA)
30/03/2015 08:41 (1010V/980V)/13kV 860V/13kV (860V/790V)/19kV (860V/790)/19kV 990V/8.37kV Wire voltages decreased by 200V for beam tuning / changing the beam momentum(MK)
  252   Tue, 1.09.2015 15:44:38 M. KuichTPC HV status
amplification voltage/drift voltage

VTPC-1 VTPC-2 MTPC-L MTPC-R GAP TPC
1/09/2015 15:40 0V/0.5kV 0V/0.5kV 0V/0.5kV 0V/0.5kV 0V/0V (MK)
1/09/2015 18:49 0V/6.5kV 0V/6.5kV 0V/9.5kV 0V/9.5kV 0V/0V Potential strips ON (MK)
1/09/2015 22:46 0V/6.5kV 0V/6.5kV 0V/9.5kV 0V/9.5kV 0V/0.5kV (MK)
2/09/2015 10:19 10V/13kV 10V/13kV 10V/19kV 10V/19kV 10V/4.5kV (MK)
2/09/2015 14:45 100V/13kV 100V/13kV 100V/19kV 100V/19kV 100V/8.37kV Full DRIFT HV in all TPCs (MK)
2/09/2015 14:45 200V/13kV 200V/13kV 200V/19kV 200V/19kV 200V/8.37kV (MK)
3/09/2015 9:00 0V/13kV 0V/13kV 0V/19kV 0V/19kV 0V/8.37kV HV switched off due to exchanging power supply module (MK)
3/09/2015 14:00 300V/13kV 200V/13kV 300V/19kV (300V/200V)/19kV 250V/8.37kV (MK)
3/09/2015 16:41 500V/13kV 400V/13kV 500V/19kV 500V/19kV 500V/8.37kV (MK)
4/09/2015 10:28 (580V/550V)/13kV 450V/13kV (580V/510V)/19kV (580V/510V)/19kV 560V/8.37kV (MK)
4/09/2015 14:54 (630V/600V)/13kV 500V/13kV (630V/560V)/19kV (630V/560V)/19kV 610V/8.37kV (MK)
4/09/2015 18:46 (680V/650V)/13kV 560V/13kV (680V/610V)/19kV (680V/610V)/19kV 610V/8.37kV (MK)
6/09/2015 13:06 (780V/750V)/13kV 660V/13kV (780V/710V)/19kV (780V/710V)/19kV 710V/8.37kV (AA)
6/09/2015 21:30 (880V/850V)/13kV 760V/13kV (830V/760V)/19kV (830V/760V)/19kV 810V/8.37kV (AA)
7/09/2015 10:30 (960V/930V)/13kV 810V/13kV (860V/790V)/19kV (860V/790V)/19kV 860V/8.37kV (AA)
7/09/2015 15:20 (1010V/980V)/13kV 860V/13kV (860V/790V)/19kV (860V/790V)/19kV 910V/8.37kV (AA)
8/09/2015 10:00 (1060V/1030V)/13kV 910V/13kV (910V/840V)/19kV (910V/840V)/19kV 960V/8.37kV (AA)
9/09/2015 8:00 (1060V/1030V)/13kV 910V/13kV (910V/840V)/19kV (910V/840V)/19kV 0V/0V GAP TPC HV off (AA)
9/09/2015 13:55 (1110V/1080V)/13kV 960V/13kV (960V/890V)/19kV (960V/890V)/19kV 800V/8.37kV (AA)
9/09/2015 15:25 (1160V/1130V)/13kV 1010V/13kV (1010V/940V)/19kV (1010V/940V)/19kV 900V/8.37kV (AA)
9/09/2015 19:05 (1170V/1140V)/13kV 1020V/13kV (1020V/950V)/19kV (1020V/950V)/19kV 950V/8.37kV (AA)
9/09/2015 20:40 (1180V/1150V)/13kV 1030V/13kV (1030V/960V)/19kV (1030V/960V)/19kV 1000V/8.37kV (AA)
9/09/2015 21:15 (1190V/1160V)/13kV 1040V/13kV (1040V/970V)/19kV (1040V/970V)/19kV 1050V/8.37kV (AA)
9/09/2015 22:05 (1160V/1130V)/13kV 1010V/13kV (1010V/940V)/19kV (1010V/940V)/19kV 1050V/8.37kV (AA)
11/09/2015 00:40 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990V)/19kV 1150V/8.37kV full voltages (AA)
11/09/2015 00:50 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990V)/19kV 1200V/8.37kV increased GAP TPC HV (AA)
13/09/2015 8:50 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990V)/19kV 1210V/8.37kV increased GAP TPC HV (AA)
14/09/2015 11:30 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990V)/19kV 1150V/8.37kV decreased GAP TPC HV (MK)
14/09/2015 19:20 (1110V/1080V)/13kV 960V/13kV (960V/890V)/19kV (960V/890V)/19kV 1050V/8.37kV -100V for beam tuning (AA)
15/09/2015 0:33 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990V)/19kV 1150V/8.37kV full voltages (AA)
15/09/2015 16:00 (1110V/1080V)/13kV 960V/13kV (960V/890V)/19kV (960V/890V)/19kV 1050V/8.37kV -100V for beam tuning (AA)
15/09/2015 16:00 (1110V/1080V)/13kV 960V/13kV (960V/890V)/19kV (960V/890V)/19kV 1050V/10.2kV GapTPC drift field increased due to changing the drift velocity (MK)
15/09/2015 23:24 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990V)/19kV 1150V/10.2kV full voltages (AA)
16/09/2015 17:28 (1110V/1080V)/13kV 960V/13kV (960V/890V)/19kV (960V/890V)/19kV 1050V/10.2kV -100V for beam tuning (MK)
17/09/2015 00:23 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990V)/19kV 1150V/10.2kV full voltages (MK)
17/09/2015 00:48 (1210V/1180V)/13kV 1060V/13kV (1060V/990V)/19kV (1060V/990V)/19kV 1220V/10.2kV GAP TPC +70V (MK)
17/09/2015 00:48 (1010V/980V)/13kV 860V/13kV (860V/790V)/19kV (860V/790V)/19kV 1020V/10.2kV -200V in all TPCs(MK)
22/09/2015 11:45 (1010V/980V)/13kV 860V/13kV (860V/790V)/19kV (0V/0V)/0kV 1020V/10.2kV MTPC-R off (compressor failure) (AA)
  259   Sun, 15.11.2015 15:37:28 A.Aduszkiewicz, M. KuichTPC HV status
amplification voltage/drift voltage

VTPC-1 VTPC-2 MTPC-L MTPC-R GAP TPC
15/11/2015 15:40 0V/0.2kV 0V/0.2kV 0V/0.2kV 0V/0.2kV 0V/0V (AA)
15/11/2015 16:50 0V/1kV 0V/1kV 0V/1kV 0V/1kV 0V/0V pot. strips on (AA)
17/11/2015 10:30 0V/13kV 0V/13kV 0V/19kV 0V/9.5kV 0V/0V (MK)
17/11/2015 11:30 POWER CUT
17/11/2015 18:20 0V/2kV 0V/2kV 0V/5kV 0V/5kV 0V/0V pot. strips on (MK)
17/11/2015 20:57 0V/13kV 0V/13kV 0V/19kV 0V/19kV 0V/0V (MK)
18/11/2015 11:03 100V/13kV 100V/13kV 100V/19kV 100V/19kV 0V/0V (MK)
18/11/2015 16:13 500V/13kV 500V/13kV 500V/19kV 500V/19kV 0V/0V (MK)
19/11/2015 16:13 700V/13kV 700V/13kV 700V/19kV 700V/19kV 0V/0V (MK)
19/11/2015 16:13 830V/800V/13kV 770V/13kV 770V/700V/19kV 770V/700V/19kV 0V/0V (MK)
20/11/2015 10:11 920V/890V/13kV 820V/13kV 820V/750V/19kV 820V/750V/19kV 0V/0V (MK)
20/11/2015 15:22 990V/960V/13kV 840V/13kV 840V/770V/19kV 840V/770V/19kV 0V/0V (MK)
20/11/2015 18:19 1050V/1020V/13kV 900V/13kV 900V/830V/19kV 900V/830V/19kV 0V/0V (MK)
20/11/2015 18:28 1070V/1040V/13kV 920V/13kV 920V/850V/19kV 920V/850V/19kV 0V/0V No beam, wires' conditioning (MK)
20/11/2015 18:41 1090V/1060V/13kV 940V/13kV 940V/870V/19kV 940V/870V/19kV 0V/0V No beam, wires' conditioning (MK)
20/11/2015 18:50 1030V/1000V/13kV 880V/13kV 880V/810V/19kV 880V/810V/19kV 0V/0V Beam back (AA)
22/11/2015 14:34 1070V/1040V/13kV 920V/13kV 920V/850V/19kV 920V/850V/19kV 0V/0V Access, wires' conditioning (MK)
22/11/2015 14:45 1090V/1060V/13kV 940V/13kV 940V/870V/19kV 940V/870V/19kV 0V/0V Access, wires' conditioning (MK)
22/11/2015 14:51 1100V/1070V/13kV 950V/13kV 950V/880V/19kV 950V/880V/19kV 0V/0V Access, wires' conditioning (MK)
22/11/2015 14:51 1110V/1080V/13kV 960V/13kV 960V/890V/19kV 960V/890V/19kV 0V/0V Access, wires' conditioning (MK)
22/11/2015 15:35 1150V/1120V/13kV 1000V/13kV 1000V/910V/19kV 1000V/930V/19kV 0V/0V Access, wires' conditioning (MK)
22/11/2015 15:35 1010V/980V/13kV 860V/13kV 860V/790V/19kV 860V/790V/19kV 0V/0V End of access (MK)
22/11/2015 21:28 1060V/1180V/13kV 1060V/13kV 1060V/990V/19kV 1060V/990V/19kV 0V/0V Nominal values in small steps (MK)
22/11/2015 21:28 1110V/1080V/13kV 960V/13kV 960V/890V/19kV 960V/890V/19kV 0V/0V -100V for beam tunning (MK)
22/11/2015 22:30 full voltage
23/11/2015 0:55 1110V/1080V/13kV 960V/13kV 960V/890V/19kV 960V/890V/19kV 0V/0V -100V (AA)
23/11/2015 15:55 1010V/980V/13kV 860V/13kV 860V/790V/19kV 860V/790V/19kV 0V/0V -200V (AA)
23/11/2015 20:00 voltages off (watercooling problem)
23/11/2015 23:26 910V/880V/13kV 760V/13kV 760V/690V/19kV 760V/690V/19kV 0V/0V -300V (AA)
24/11/2015 13:34 1110V/1080V/13kV 960V/13kV 960V/890V/19kV 960V/890V/19kV 0V/0V -100V in respect to the nominal in small steps (MK)
24/11/2015 13:34 1010V/980V/13kV 860V/13kV 860V/790V/19kV 860V/790V/19kV 0V/0V -200V in respect to the nominal for beam tunning (MK)
24/11/2015 13:34 1210V/1180V/13kV 1060V/13kV 1060V/990V/19kV 1060V/990V/19kV 0V/0V Nominal values in small steps (MK)
25/11/2015 10:24 1010V/980V/13kV 860V/13kV 860V/790V/19kV 860V/790V/19kV 0V/0V -200V for beam tuning (AA)
26/11/2015 9:45 1210V/1180V/13kV 1060V/13kV 1060V/990V/19kV 1060V/990V/19kV 0V/0V Nominal values in small steps (MK)
27/11/2015 15:45 910V/880V/13kV 760V/13kV 760V/690V/19kV 760V/690V/19kV 0V/0V -300V for beam intensity test (AA)
27/11/2015 17:50 810V/780V/13kV 660V/13kV 660V/590V/19kV 660V/590V/19kV 0V/0V -400V for beam intensity test (MK)
27/11/2015 19:39 1210V/1180V/13kV 1060V/13kV 1060V/990V/19kV 1060V/990V/19kV 0V/0V Nominal values in small steps (MK)
Attachment 1: printscreen_259_20151130-081547.png
printscreen_259_20151130-081547.png
  263   Sat, 2.07.2016 14:08:19 A.Aduszkiewicz, M. KuichTPC HV status
amplification voltage/drift voltage

VTPC-1 VTPC-2 MTPC-L MTPC-R GAP TPC
2/07/2016 14:05 0V/13kV 0V/13kV 0V/19kV 0V/19kV 0V/10.2kV (AA)
3/07/2016 19:31 0V/13kV 0V/13kV 0V/19kV 0V/19kV 0V/10.2kV Potential strips ON (MK)
4/07/2016 15:31 100V/13kV 100V/13kV 100V/19kV 100V/19kV 100V/10.2kV (MK)
4/07/2016 18:23 300V/13kV 300V/13kV 300V/19kV 300V/19kV 300V/10.2kV (MK)
5/07/2016 9:35 500V/13kV 500V/13kV 500V/19kV 500V/19kV 500V/10.2kV (MK)
5/07/2016 9:35 600V/13kV 600V/13kV 600V/19kV 600V/19kV 0V/0kV GapTPC HV off due to stopped gass flow (MK)
6/07/2016 14:35 730V/700V/13kV 670V/13kV 670V/600V/19kV 670V/600V/19kV 500V/10.2kV (MK)
6/07/2016 18:50 830V/800V/13kV 770V/13kV 770V/700V/19kV 770V/700V/19kV 600V/10.2kV (MK)
7/07/2016 10:25 880V/850V/13kV 820V/13kV 820V/750V/19kV 820V/750V/19kV 700V/10.2kV (MK)
7/07/2016 16:00 960V/930V/13kV 860V/13kV 860V/790V/19kV 860V/790V/19kV 800V/10.2kV (MK)
8/07/2016 11:30 960V/930V/13kV 860V/13kV 860V/790V/19kV 860V/790V/19kV 0V/10.2kV GapTPC wire HV off due to reduction of gas flow (PP)
9/07/2016 14:50 960V/930V/13kV 860V/13kV 860V/790V/19kV 860V/790V/19kV 500V/10.2kV (PP)
9/07/2016 15:20 960V/930V/13kV 860V/13kV 860V/790V/19kV 860V/790V/19kV 550V/10.2kV (PP)
9/07/2016 16:00 1010V/980V/13kV 910V/13kV 910V/840V/19kV 910V/840V/19kV 600V/10.2kV (PP)
9/07/2016 17:30 1010V/980V/13kV 910V/13kV 910V/840V/19kV 910V/840V/19kV 650V/10.2kV (PP)
10/07/2016 09:15 1010V/980V/13kV 910V/13kV 910V/840V/19kV 910V/840V/19kV 700V/10.2kV (PP)
11/07/2016 16:00 1010V/980V/13kV 910V/13kV 910V/840V/19kV 910V/840V/19kV 750V/10.2kV (PP)
11/07/2016 18:20 1010V/980V/13kV 910V/13kV 910V/840V/19kV 910V/840V/19kV 950V/10.2kV GTPC HV up in 50V steps (PP)
11/07/2016 21:15 1060V/1030V/13kV 960V/13kV 960V/890V/19kV 960V/890V/19kV 950V/10.2kV (AA)
11/07/2016 22:25 1110V/1080V/13kV 1010V/13kV 1010V/940V/19kV 1010V/940V/19kV 1000V/10.2kV MTPC-L sector 20 left at 960V, due to high current(AA)
11/07/2016 22:45 1110V/1080V/13kV 1010V/13kV 1010V/940V/19kV 1010V/940V/19kV 1000V/10.2kV MTPC-L sector 20 reduced to 910V, as it was at 20 nA out of spill(AA)
11/07/2016 22:50 1160V/1080V/13kV 1030V/13kV 1030V/950V/19kV 1030V/960V/19kV 1000V/10.2kV MTPC-L sector 20 at 910V(AA)
11/07/2016 23:20 1170V/1100V/13kV 1040V/13kV 1040V/970V/19kV 1040V/970V/19kV 1050V/10.2kV MTPC-L sector 20 at 910V(AA)
12/07/2016 0:15 1060V/1030V/13kV 910V/13kV 910V/840V/19kV 910V/840V/19kV 1000V/10.2kV 150V below the nominal values(AA)
12/07/2016 17:50 1110V/1080V/13kV 960V/13kV 960V/890V/19kV 960V/890V/19kV 1050V/10.2kV (AA)
12/07/2016 18:15 1160V/1130V/13kV 1010V/13kV 1010V/940V/19kV 1010V/940V/19kV 1100V/10.2kV MTPC-L sector 20 at 960V (6nA out of spill) (AA)
12/07/2016 18:28 1190V/1160V/13kV 1040V/13kV 1040V/970V/19kV 1040V/970V/19kV 1130V/10.2kV MTPC-L sector 20 at 960V (6nA out of spill) (AA)
12/07/2016 23:45 1060V/1030V/13kV 910V/13kV 910V/840V/19kV 910V/840V/19kV 1000V/10.2kV 150V below the nominal values (AA)
13/07/2016 9:40 1060V/1030V/13kV 910V/13kV 910V/840V/19kV 910V/840V/19kV 0V/0kV GAP TPC HV off for geometrical survey (AA)
13/07/2016 14:30 1060V/1030V/13kV 910V/13kV 910V/840V/19kV 910V/840V/19kV 1000V/10.2kV GAP TPC HV on after geometrical survey (MK)
13/07/2016 18:35 1060V/1030V/13kV 910V/13kV 910V/840V/19kV 910V/840V/19kV 1100V/10.2kV (MK)
15/07/2016 9:30 1140V/1110V/13kV 990V/13kV 990V/920V/19kV 990V/920V/19kV 1130V/10.2kV Ramping up (MK)
15/07/2016 14:00 1210V/1180V/13kV 1060V/13kV 1060V/990V/19kV 1060V/990V/19kV 1150V/10.2kV Nominal voltages (MK)
20/07/2016 18:50 1110V/1080V/13kV 960V/13kV 960V/890V/19kV 960V/890V/19kV 1050V/10.2kV -100V on amplification due to beam tunning. (MK)
21/07/2016 19:30 1210V/1180V/13kV 1060V/13kV 1060V/990V/19kV 1060V/990V/19kV 1150V/10.2kV Nominal voltages (MK)
Attachment 1: printscreen_1521_20160718-181727.png
printscreen_1521_20160718-181727.png
Attachment 2: printscreen_1521_20160718-181741.png
printscreen_1521_20160718-181741.png
Attachment 3: printscreen_1521_20160718-181746.png
printscreen_1521_20160718-181746.png
Attachment 4: printscreen_1521_20160718-181752.png
printscreen_1521_20160718-181752.png
Attachment 5: printscreen_1521_20160718-181943.png
printscreen_1521_20160718-181943.png
Attachment 6: printscreen_1521_20160718-181949.png
printscreen_1521_20160718-181949.png
Attachment 7: printscreen_1521_20160718-181954.png
printscreen_1521_20160718-181954.png
Attachment 8: printscreen_1521_20160718-181959.png
printscreen_1521_20160718-181959.png
Attachment 9: printscreen_1521_20160718-182003.png
printscreen_1521_20160718-182003.png
Attachment 10: printscreen_1521_20160718-182007.png
printscreen_1521_20160718-182007.png
Attachment 11: printscreen_1521_20160718-182013.png
printscreen_1521_20160718-182013.png
  371   Wed, 11.03.2026 21:40:55 B. LyonTPC HV settings for 2026 p+p run
VTPC-1 Gap TPC VTPC-2 FTPC 1 MTPC-L MTPC-R FTPC 2 FTPC 3
Wed, 11.03.2026 20:50:00 500V/13kV 500V/8.16kV 500V/13kV 500V/17.3kV 500V/19kV 500V/19kV 500V/17.3kV 500V/17.3kV Full drift voltage and potential strips ON in big TPCs, 500V on sense wires, Gating Grid turned on. (BL)
Wed, 11.03.2026 21:41:17 600V/13kV 600V/8.16kV 600V/13kV 600V/17.3kV 600V/19kV 600V/19kV 600V/17.3kV 600V/17.3kV +100V on sense wires, now at 600V (BL)
Wed, 11.03.2026 22:48:02 700V/13kV 700V/8.16kV 700V/13kV 700V/17.3kV 700V/19kV 700V/19kV 700V/17.3kV 700V/17.3kV +100V on sense wires, now at 700V (BL)
Wed, 11.03.2026 23:48:39 800V/13kV 800V/8.16kV 790V/13kV 800V/17.3kV 800V(SR)/740V(HR)/19kV 800V(SR)/740V(HR)/19kV 800V/17.3kV 800V/17.3kV +100V except MTPC HR and VTPC2. MTPC and VTPC2 now at 300V below nominal, going to hold there overnight. (BL)
Thu, 12.03.2026 00:07:56 900V/13kV 850V/8.16kV 790V/13kV 850V/17.3kV 800V(SR)/740V(HR)/19kV 800V(SR)/740V(HR)/19kV 850V/17.3kV 850V/17.3kV +100V on VTPC1, +50V on small TPCs. All TPCs (except VTPC1 sectors 1, 4) are at 300V below nominal (BL)
Thu, 12.03.2026 15:41:21 950V(1,4)/900V/13kV 850V/8.16kV 790V/13kV 850V/17.3kV 800V(SR)/740V(HR)/19kV 800V(SR)/740V(HR)/19kV 850V/17.3kV 850V/17.3kV +50V on VTPC1 sectors 1, 4. Now all are at 300V below nominal (BL)
Thu, 12.03.2026 23:07:44 1050V(1,4)/1000V/13kV 950V/8.16kV 890V/13kV 950V/17.3kV 900V(SR)/840V(HR)/19kV 900V(SR)/840V(HR)/19kV 950V/17.3kV 950V/17.3kV +100V. Now all are at 200V below nominal (BL)
Fri, 13.03.2026 16:40:06 1100V(1,4)/1050V/13kV 1000V/8.16kV 940V/13kV 1000V/17.3kV 950V(SR)/890V(HR)/19kV 950V(SR)/890V(HR)/19kV 1000V/17.3kV 1000V/17.3kV Beginning raise to nominal with +50V to all chambers (BL)
Sat, 14.03.2026 18:46:46 1250V(1,4)/1200V/13kV 1150V/8.16kV 1090V/13kV 1150V/17.3kV 1100V(SR)/1040V(HR)/19kV 1100V(SR)/1040V(HR)/19kV 1150V/17.3kV 1150V/17.3kV Nominal voltage was reached around 23:00 last night. (BL)


Fri, 13.03.2026 17:56:52 At 17:23, began raising GRC voltage as well from its parking value of 1100V, toward nominal 1600V.
Sat, 14.03.2026 18:47:51 During the final raising to nominal, it was discovered that FTPC1 was not actually connected. Had to turn off all FTPC1 voltages plus FTPC2+3 sense wires in order to connect them. FTPC2+3 were raised back to normal relatively quickly, but since FTPC1 had not actually been stressed yet we had to raise it slowly.

Wed, 18.03.2026 07:44:17 In preparation for power cut in EHN1, all TPC voltages and power supplies were turned off.
Wed, 18.03.2026 14:04:54 TPC drift voltage and gating grid were turned on before lunch. Now raising TPCs (and GRC) back to nominal sense wire voltages gradually in steps.
  374   Wed, 8.07.2026 15:39:06 V.OzvenchukTPC HV settings for 2026 neutrino run
                            VTPC-1 	            Gap TPC 	        VTPC-2 	        FTPC 1 	        MTPC-L 	                   MTPC-R 	               FTPC 2 	        FTPC 3 		
Wed,  8.07.2026 16:40:55   500V/13kV 	            500V/8.16kV 	500V/13kV 	500V/17.3kV 	500V/19kV 	           500V/19kV 	               500V/17.3kV 	500V/17.3kV 	Full drift voltage and potential strips ON in big TPCs, 500V on sense wires, Gating Grid turned on. 	(VO)

Wed,  8.07.2026 17:49:23   600V/13kV 	            600V/8.16kV 	600V/13kV 	600V/17.3kV 	600V/19kV 	           600V/19kV 	               600V/17.3kV 	600V/17.3kV 	+100V on sense wires, now at 600V 	(VO)

Wed,  8.07.2026 18:48:15   600V/13kV 	            600V/8.16kV 	690V/13kV 	600V/17.3kV 	600V(SR)/640V(HR)/19kV 	   600V(SR)/640V(HR)/19kV      600V/17.3kV 	600V/17.3kV 	+40V on MTPCs(HR), +90V VTPC-2 sense wires, 400V below nominal 	(VO)

Wed,  8.07.2026 18:53:46   700V/13kV 	            700V/8.16kV 	690V/13kV 	700V/17.3kV 	700V(SR)/640V(HR)/19kV 	   700V(SR)/640V(HR)/19kV      700V/17.3kV 	700V/17.3kV 	+100V on rest sense wires, MTPCs(SR) 400V below nominal 	(VO) 

Wed,  8.07.2026 20:22:48   800V/13kV 	            780V/8.16kV 	690V/13kV 	780V/17.3kV 	700V(SR)/640V(HR)/19kV 	   700V(SR)/640V(HR)/19kV      750V/17.3kV 	750V/17.3kV 	all TPCs, except VTPC-1(1,4) 400V below nominal 	(VO)

Wed,  8.07.2026 21:40:19   850V(1,4)/800V/13kV 	    780V/8.16kV 	690V/13kV 	780V/17.3kV 	700V(SR)/640V(HR)/19kV 	   700V(SR)/640V(HR)/19kV      750V/17.3kV 	750V/17.3kV 	all TPCs 400V below nominal 	(VO)

Thu,  9.07.2026 15:14:16   850V(1,4)/800V/13kV 	    780V/8.16kV 	690V/13kV 	0V/17.3kV 	700V(SR)/640V(HR)/19kV 	   700V(SR)/640V(HR)/19kV      750V/17.3kV 	750V/17.3kV 	ramp down to 0V the FTPC-1 due to the 8.5nA current 	(VO) 

Thu,  9.07.2026 15:50:15   850V(1,4)/800V/13kV 	    780V/8.16kV 	690V/13kV 	100V/17.3kV 	700V(SR)/640V(HR)/19kV 	   700V(SR)/640V(HR)/19kV      750V/17.3kV 	750V/17.3kV 	+100V on FTPC-1, I = 1nA 	(VO)

Thu,  9.07.2026 16:48:01   850V(1,4)/800V/13kV 	    780V/8.16kV 	690V/13kV 	200V/17.3kV 	700V(SR)/640V(HR)/19kV 	   700V(SR)/640V(HR)/19kV      750V/17.3kV 	750V/17.3kV 	+100V on FTPC-1, I = 1.8nA 	(VO)

Thu,  9.07.2026 17:18:02   850V(1,4)/800V/13kV 	    780V/8.16kV 	690V/13kV 	300V/17.3kV 	700V(SR)/640V(HR)/19kV 	   700V(SR)/640V(HR)/19kV      750V/17.3kV 	750V/17.3kV 	+100V on FTPC-1, I = 2.6nA 	(VO)

Thu,  9.07.2026 17:40:01   850V(1,4)/800V/13kV 	    780V/8.16kV 	690V/13kV 	500V/17.3kV 	700V(SR)/640V(HR)/19kV 	   700V(SR)/640V(HR)/19kV      750V/17.3kV 	750V/17.3kV 	+200V on FTPC-1, I = 4.3nA 	(VO)

Thu,  9.07.2026 18:11:36   850V(1,4)/800V/13kV 	    780V/8.16kV 	690V/13kV 	600V/17.3kV 	700V(SR)/640V(HR)/19kV 	   700V(SR)/640V(HR)/19kV      750V/17.3kV 	750V/17.3kV 	+100V on FTPC-1, I = 5.0nA 	(VO)

Fri, 10.07.2026 10:33:08   850V(1,4)/800V/13kV 	    780V/8.16kV 	690V/13kV 	700V/17.3kV 	700V(SR)/640V(HR)/19kV 	   700V(SR)/640V(HR)/19kV      750V/17.3kV 	750V/17.3kV 	+100V on FTPC-1, I = 3.6nA 	(VO)

Fri, 10.07.2026 11:07:34   950V(1,4)/900V/13kV 	    880V/8.16kV 	790V/13kV 	800V/17.3kV 	800V(SR)/740V(HR)/19kV 	   800V(SR)/740V(HR)/19kV      850V/17.3kV 	850V/17.3kV 	+100V on sense wires            (VO)

Fri, 10.07.2026 11:27:27   950V(1,4)/900V/13kV 	    880V/8.16kV 	790V/13kV 	880V/17.3kV 	800V(SR)/740V(HR)/19kV 	   800V(SR)/740V(HR)/19kV      850V/17.3kV 	850V/17.3kV 	+80V on  FTPC-1, all TPCs 300V below nominal            (VO)

Fri, 10.07.2026 11:50:31   1050V(1,4)/1000V/13kV    980V/8.16kV 	890V/13kV 	980V/17.3kV 	900V(SR)/840V(HR)/19kV 	   900V(SR)/840V(HR)/19kV      950V/17.3kV 	950V/17.3kV 	+100V on sense wires, all TPCs 200V below nominal            (VO)

Fri, 10.07.2026 13:27:30   1100V(1,4)/1050V/13kV    1030V/8.16kV 	940V/13kV 	1030V/17.3kV 	950V(SR)/890V(HR)/19kV 	   950V(SR)/890V(HR)/19kV      1000V/17.3kV 	1000V/17.3kV 	+50V on sense wires, all TPCs 150V below nominal            (VO)

Fri, 10.07.2026 13:56:22   1150V(1,4)/1100V/13kV    1080V/8.16kV 	990V/13kV 	1080V/17.3kV 	1000V(SR)/940V(HR)/19kV    1000V(SR)/940V(HR)/19kV     1050V/17.3kV 	1050V/17.3kV 	+50V on sense wires, all TPCs 100V below nominal            (VO)

Fri, 10.07.2026 14:14:31   1200V(1,4)/1150V/13kV    1130V/8.16kV 	1040V/13kV 	11300V/17.3kV 	1050V(SR)/990V(HR)/19kV    1050V(SR)/990V(HR)/19kV     1100V/17.3kV 	1100V/17.3kV 	+50V on sense wires, all TPCs 50V below nominal             (VO)

Fri, 10.07.2026 15:02:42   850V(1,4)/800V/13kV 	    780V/8.16kV 	690V/13kV 	780V/17.3kV 	700V(SR)/640V(HR)/19kV 	   700V(SR)/640V(HR)/19kV      750V/17.3kV 	750V/17.3kV 	all TPCs 400V below nominal 	(VO)

Fri, 10.07.2026 19:45:03   1050V(1,4)/1000V/13kV    980V/8.16kV 	890V/13kV 	980V/17.3kV 	900V(SR)/840V(HR)/19kV 	   900V(SR)/840V(HR)/19kV      950V/17.3kV 	950V/17.3kV 	+200V on sense wires, all TPCs 200V below nominal            (VO)

Fri, 10.07.2026 20:09:04   1150V(1,4)/1100V/13kV    1080V/8.16kV 	990V/13kV 	1080V/17.3kV 	1000V(SR)/940V(HR)/19kV    1000V(SR)/940V(HR)/19kV     1050V/17.3kV 	1050V/17.3kV 	+100V on sense wires, all TPCs 100V below nominal            (VO)

Fri, 10.07.2026 20:19:34   1250V(1,4)/1200V/13kV    1180V/8.16kV 	1090V/13kV 	1180V/17.3kV 	1100V(SR)/1040V(HR)/19kV   1100V(SR)/1040V(HR)/19kV    1150V/17.3kV 	1150V/17.3kV 	+100V on sense wires, all TPCs at nominal            (VO)

Mon,  3.08.2026 11:39:06   950V(1,4)/900V/13kV      0V/0kV 	        790V/13kV 	0V/0kV 	        800V(SR)/740V(HR)/19kV     800V(SR)/740V(HR)/19kV      0V/0kV 	        0V/0kV 	        -300V on sense wires for big TPCs, switched off GTPC and FTPCs            (VO) 

Wed,  5.08.2026 15:42:50   590V(1,4)/590V/13kV      0V/0kV 	        590V/13kV 	0V/0kV 	        600V(SR)/540V(HR)/19kV     600V(SR)/540V(HR)/19kV      0V/0kV 	        0V/0kV 	        -200V on sense wires for TPCs, except VTPC1. -360V for VTPC1(1,4), -310V for VTPC1(2,3,5,6)   (AD) 

Mon, 10.08.2026 11:15:51   690V(1,4)/690V/13kV      0V/0kV 	        690V/13kV 	0V/0kV 	        700V(SR)/640V(HR)/19kV     700V(SR)/640V(HR)/19kV      0V/0kV 	        0V/0kV 	        +100V on sense wires for big TPCs, on the way to reach the PbPb nominal voltages for the tests.   (VO) 

Mon, 10.08.2026 11:48:16   790V(1,4)/790V/13kV      0V/0kV 	        770V/13kV 	0V/0kV 	        800V(SR)/720V(HR)/19kV     800V(SR)/720V(HR)/19kV      0V/0kV 	        0V/0kV 	        all TPCs, except VTPC1, are 300V below nominal   (VO) 

Mon, 10.08.2026 12:55:09   890V(1,4)/860V/13kV      0V/0kV 	        770V/13kV 	0V/0kV 	        800V(SR)/720V(HR)/19kV     800V(SR)/720V(HR)/19kV      0V/0kV 	        0V/0kV 	        all TPCs are 300V below nominal   (VO) 

Mon, 10.08.2026 13:43:53   990V(1,4)/960V/13kV      0V/0kV 	        870V/13kV 	0V/0kV 	        900V(SR)/820V(HR)/19kV     900V(SR)/820V(HR)/19kV      0V/0kV 	        0V/0kV 	        +100V on sense wires, all TPCs are 200V below nominal   (VO)

Mon, 10.08.2026 14:31:05   1040V(1,4)/1010V/13kV    0V/0kV 	        920V/13kV 	0V/0kV 	        950V(SR)/870V(HR)/19kV     950V(SR)/870V(HR)/19kV      0V/0kV 	        0V/0kV 	        +50V on sense wires, all TPCs are 150V below nominal   (VO)

Mon, 10.08.2026 15:34:21   1090V(1,4)/1060V/13kV    0V/0kV 	        970V/13kV 	0V/0kV 	        1000V(SR)/920V(HR)/19kV    1000V(SR)/920V(HR)/19kV     0V/0kV 	        0V/0kV 	        +50V on sense wires, all TPCs are 100V below nominal   (VO)

Mon, 10.08.2026 17:13:06   1140V(1,4)/1100V/13kV    0V/0kV 	        1020V/13kV 	0V/0kV 	        1050V(SR)/970V(HR)/19kV    1050V(SR)/970V(HR)/19kV     0V/0kV 	        0V/0kV 	        +50V on sense wires, all TPCs are 50V below nominal   (VO)

Mon, 10.08.2026 17:30:04   1190V(1,4)/1160V/13kV    0V/0kV 	        1070V/13kV 	0V/0kV 	        1100V(SR)/1020V(HR)/19kV   1100V(SR)/1020V(HR)/19kV    0V/0kV 	        0V/0kV 	        +50V on sense wires, all TPCs are at nominal   (VO)

Mon, 10.08.2026 19:08:49   590V(1,4)/560V/13kV      0V/0kV 	        470V/13kV 	0V/0kV 	        500V(SR)/420V(HR)/19kV     500V(SR)/420V(HR)/19kV      0V/0kV 	        0V/0kV 	        -600V on sense wires, all TPCs are 600V below nominal   (AD)

Mon, 10.08.2026 19:16:43   0V(1,4)/0V/13kV          0V/0kV 	        0V/13kV 	0V/0kV 	        0V(SR)/0V(HR)/19kV         0V(SR)/0V(HR)/19kV          0V/0kV 	        0V/0kV 	        Turn off sense voltages  (AD)

Mon, 10.08.2026 19:24:20   0V(1,4)/0V/0kV           0V/0kV 	        0V/0kV 	        0V/0kV 	        0V(SR)/0V(HR)/0kV          0V(SR)/0V(HR)/0kV           0V/0kV 	        0V/0kV 	        Turn off drift voltages  (AD)
  145   Mon, 6.08.2012 08:43:42 A.AduszkiewiczTPC HV setting summer 2012
Wire voltages in the attachment.

Drift voltages:
VTPCs: 13kV
MTPCs: 19kV
GAP TPC: 10.2kV
Attachment 1: id145-2012-08-06-084247.png
id145-2012-08-06-084247.png
  319   Wed, 29.06.2022 22:48:07 P. PodlaskiTPC HV scan
Wed, 29.06.2022 22:48:08 Started TPC HV scan.


HV RUN
+0V 40124
+25V 40128
+50V 40129
+75V 40130
+100V 40131


VTPC1 164 72 73 - 137 67 68 VTPC2 41 39 35 - 29 32 31
  121   Tue, 19.06.2012 11:11:50 A.AduszkiewiczTPC HV ramping up
amplification voltage/drift voltage
VTPC-1 VTPC-2 MTPC-L MTPC-R GAP TPC
19/06/2012 11:10 100V/1kV 100V/1kV 100V/2kV 100V/2kV 100V/1kV
19/06/2012 11:45 500V/5kV 500V/5kV 500V/5kV 500V/5kV 500V/5kV
19/06/2012 17:50 800V/8kV 800V/8kV 800V/10kV 800V/10kV 800V/8kV
20/06/2012 10:15 1110V(1080V)/12kV 960V/12kV 960V(890V)/15kV 960V(890V)/15kV 800V/10kV
20/06/2012 14:00 1110V(1080V)/13kV 960V/13kV 960V(890V)/19kV 960V(890V)/19kV 800V/10.2kV
  213   Tue, 10.12.2013 15:13:02 M. KuichTPC HV module replaced
TPC HV CAEN module No 4. replaced. Borrowed module will be returned to Pool. NA61 module is installed.

SY527 reports that there are no modules connected!
  125   Sat, 23.06.2012 19:29:26 A.AduszkiewiczTPC HV full
The setting is:
VTPC-1 1210/1180V
VTPC-2 1060V
MTPCs 1060/990V
GAP TPC 1150V <-- we see nice tracks in the GAP TPC with this voltage
  180   Tue, 4.12.2012 17:54:40 A.AduszkiewiczTPC HV full
Voltage setting, not yet tested with the beam.
Attachment 1: id180-2012-12-04-175444.png
id180-2012-12-04-175444.png
ELOG V3.1.3-7933898