Thu, 17.08.2017 11:37:34, Z. Fodor, P. Podlaski, VTPC-2 sector 2 issues
|
Sat, 5.08.2017 21:54:42, A.Laszlo, FrontEnd card exchange
|
Wed, 2.08.2017 21:22:25, EDZ, Y. Nagai, B. Rumberger, FTPC HV status
|
Sun, 30.07.2017 14:38:49, P. Podlaski, "Old" TPC HV status.
|
Sat, 8.07.2017 09:30:24, A.Aduszkiewicz, "Old" TPC HV status. 11x
|
Fri, 7.07.2017 21:30:51, A.Aduszkiewicz, A.Laszlo, FTPC gating grid observations
|
Thu, 6.07.2017 22:55:24, Z.Fodor, A.Laszlo, Starting FTPC conditioning
|
Thu, 15.06.2017 19:01:42, M. Kuich, P. Podlaski, TPC HV status. 11x
|
Mon, 12.12.2016 08:10:51, M. Kuich, HV settings before shutdown 11x
|
Fri, 25.11.2016 22:23:54, M.Kuich, A.Laszlo, Gating Grid closing problem
|
Wed, 9.11.2016 00:21:44, A.Aduszkiewicz, HV settings before short shutdown between p and Pb run 11x
|
Tue, 1.11.2016 08:07:08, A.Aduszkiewicz, HV settings before electrical intervention 11x
|
Wed, 21.09.2016 18:24:21, A.Aduszkiewicz, HV setting snapshot 11x
|
Mon, 5.09.2016 12:25:33, A.Aduszkiewicz, VTPC-2 sector 2 amp meter
|
Sun, 4.09.2016 11:27:35, M. Kuich, A.Aduszkiewicz, TPC HV status.
|
Tue, 26.07.2016 13:14:00, A.Aduszkiewicz, M.Kumara, TPC HV scan 7x
|
Fri, 15.07.2016 17:53:12, M. Kuich, Drift velocity in GapTPC.
|
Sat, 2.07.2016 14:08:19, A.Aduszkiewicz, M. Kuich, TPC HV status 11x
|
Thu, 10.03.2016 17:39:08, A.Aduszkiewicz, CAEN HV module repaired
|
Sun, 28.02.2016 15:05:00, T.Czopowicz, B.Maksiak, Light guide for LV protected
|
Mon, 30.11.2015 08:16:44, M. Kuich, HV settings at the end of the run. 11x
|
Sun, 15.11.2015 15:37:28, A.Aduszkiewicz, M. Kuich, TPC HV status
|
Wed, 21.10.2015 08:10:42, M. Kuich, HV settings at the end of run.  
|
Tue, 13.10.2015 12:01:53, A.Aduszkiewicz, HV settings during the run  
|
Tue, 13.10.2015 12:01:49, A.Aduszkiewicz, HV settings during the run
|
Wed, 30.09.2015 17:07:00, M. Kuich, HV status - restored after elog crush
|
Tue, 8.09.2015 14:36:38, E. Kaptur, Test of the Beam Counters
|
Wed, 2.09.2015 17:09:38, A.Aduszkiewicz, CAEN HV module replacement
|
Tue, 1.09.2015 15:44:38, M. Kuich, TPC HV status
|
Sat, 21.03.2015 23:18:47, T.Czopowicz, S1 in DB (and java monitor)
|
Sat, 21.03.2015 22:31:57, T.Czopowicz, Trigger ratios in DB (and java monitor)
|
Wed, 18.03.2015 11:46:43, A.Grzeszczuk, A.Aduszkiewicz, MTPC-R gating pulser
|
Tue, 3.03.2015 19:55:20, B. Maksiak, E-log crash
|
Mon, 2.03.2015 15:10:31, A. Aduszkiewicz, VTPC-1 LV interlock
|
Thu, 26.02.2015 13:10:23, E. Kaptur, Beam counters HV - Ar 13A GeV/c
|
Fri, 20.02.2015 19:01:39, Dejan Jokovic, Problem with TOF-R TDCs
|
Mon, 16.02.2015 18:11:38, S. Kowalski, S4 beam on
|
Sun, 15.02.2015 20:08:14, M. Kuich, Drift velocity in the Gap TPC 
|
Sun, 15.02.2015 18:49:00, A. Aduszkiewicz, S.Pulawski, B. Obama, E. Kaptur on behalf of the NA61/SHINE collaboration, Basic settings for Ar+Sc @ 150 AGeV
|
Wed, 11.02.2015 23:42:21, A. Aduszkiewicz, Z.Fodor, S4 and GAP TPC out of the beam
|
Wed, 11.02.2015 18:04:11, S. Kowalski, Ar run - S1 and S2
|
Tue, 10.02.2015 16:08:34, Z.fodor, S4 position x=0, check beam hight markers
|
Mon, 9.02.2015 15:27:35, A.Laszlo, Saving old S11 setting
|
Fri, 6.02.2015 16:00:52, Z.Fodor, VTX1 power problem, dismount LMPD
|
Tue, 3.02.2015 18:43:06, M. Kuich, T. Czopowicz, A.Aduszkiewicz, TPC HV status
|
Sun, 14.12.2014 17:34:15, A. Aduszkiewicz, Z.Fodor, Basic settings for p+Pb @ 158 GeV/c, 2014 10x
|
Mon, 8.12.2014 13:37:18, A.Ivashkin, PSD repair
|
Wed, 19.11.2014 23:03:18, A.Laszlo, Z.Fodor, S1_2,S1_3,S1_4 high voltage raised
|
Mon, 10.11.2014 20:15:22, Z.Fodor,A.Laszlo,A.Aduszkiewicz, GAP TPC FE replacement
|
Wed, 5.11.2014 23:53:57, A.Laszlo, LMPD Kr calibration settings
|
Tue, 4.11.2014 12:05:13, K.Marton, A.Laszlo, LMPD FieldWire and SenseWire settings archive
|
Tue, 4.11.2014 11:23:57, Z.Fodor, V1 position set
|
Mon, 3.11.2014 11:32:46, Z. Fodor, A.Laszlo, Sensor of water temperature
|
Sun, 2.11.2014 21:37:24, O. Wyszynski, S4 signal
|
Fri, 31.10.2014 19:55:07, O. Wyszynski, Thresholds and Voltages
|
Wed, 29.10.2014 11:54:24, A.Aduszkiewicz, Temperature sensors
|
Mon, 27.10.2014 10:35:39, A. Aduszkiewicz, BPD HV
|
Sun, 26.10.2014 14:50:19, A.Aduszkiewicz, M.Kuich, TPC HV status
|
Sun, 26.10.2014 14:44:22, A.Aduszkiewicz, BPD HV
|
Mon, 29.09.2014 15:58:18, A.Aduszkiewicz, PSD moved to Saleve
|
Sun, 21.09.2014 10:29:28, A. Aduszkiewicz, MTPC-L sector 3
|
Thu, 18.09.2014 14:18:59, A.Aduszkiewicz, VTPC-2 HV
|
Mon, 8.09.2014 18:13:44, A.Aduszkiewicz, M.Kuich, TPC HV status
|
Wed, 6.08.2014 11:46:48, Z. Fodor, Preparation to the modification in the area
|
Fri, 25.07.2014 19:08:36, E. Kaptur S.Kowalski S Pulawski, LV Cable test 
|
Sun, 9.03.2014 19:02:22, Z. Fodor, Gate signal for GAPTPC
|
Tue, 10.12.2013 15:13:02, M. Kuich, TPC HV module replaced
|
Thu, 24.10.2013 16:22:22, O.Petukhov, Central DAQ config intervention
|
Wed, 13.02.2013 08:31:53, A.Aduszkiewicz, HV settings at the end of the 2013 run  
|
Mon, 11.02.2013 12:42:31, A.Ivashkin, Change of termosensor position in PSD
|
Thu, 7.02.2013 14:24:16, A. Marcinek, Basic settings for Be @ 13 AGeV 11x
|
Thu, 7.02.2013 14:20:55, A. Marcinek, Basic settings for Be @ 30 AGeV
|
Tue, 5.02.2013 15:58:35, A.Ivashkin, PSD trigger threshold
|
Fri, 25.01.2013 10:17:48, S. Pulawski, PSD treshold 30 GeV
|
Wed, 23.01.2013 18:13:59, O. Wyszynski, Pattern Units
|
Mon, 21.01.2013 17:44:34, A.Laszlo, VTPC1 FEE cooling problem and repair
|
Sun, 20.01.2013 21:10:58, D.Jokovic, HV distributors for TOF replaced
|
Fri, 18.01.2013 23:09:45, ,
|
Fri, 18.01.2013 18:04:05, A.Ivashkin,
|
Thu, 17.01.2013 18:43:26, A.Ivashkin, Change of termosensor position in PSD
|
Wed, 16.01.2013 09:20:37, A. Marcinek, Basic settings for Be @ 20 AGeV 11x
|
Tue, 15.01.2013 17:15:58, MG, S4 position change to field on
|
Mon, 14.01.2013 23:07:23, S. Pulawski, Z detector (after today operations)
|
Sun, 13.01.2013 22:53:19, S. Pulawski, New treshold for Z detector
|
Sun, 13.01.2013 22:29:05, S. Pulawski, Scan Be/All depend of trigger settings.
|
Fri, 11.01.2013 22:35:26, A.Ivashkin, PSD threshold for 20 GeV is 160 mV
|
Fri, 11.01.2013 20:54:29, A.Aduszkiewicz, 2013 TPC voltage
|
Fri, 11.01.2013 19:41:29, S. Pulawski, Z det treshhold
|
Fri, 11.01.2013 14:06:05, A.Laszlo, 20GeV/c magnetic field settings for Be 2013 run
|
Fri, 11.01.2013 08:16:32, S. Pulawski, Z det - recover and HV settings
|
Thu, 10.01.2013 12:26:43, A. Marcinek, Counter HV setting for restart of Be run
|
Tue, 8.01.2013 11:00:06, A.Aduszkiewicz, TPC voltage ramping up status
|
Mon, 10.12.2012 18:55:04, O.Wyszynski, PSD in pattern unit
|
Thu, 6.12.2012 18:32:11, S. Pulawski, New Z det TH
|
Thu, 6.12.2012 12:54:38, Z. Fodor, S4 thresholds changed to 496mv
|
Wed, 5.12.2012 15:54:28, Z.Fodor, Counter thresholds
|
Wed, 5.12.2012 12:33:48, Z. Fodor, S4 position
|
Tue, 4.12.2012 20:52:34, A.Ivashkin, PSD trigger threshold
|
Tue, 4.12.2012 20:12:09, S. Kowalski, Th for Zdet
|
Tue, 4.12.2012 17:54:40, A.Aduszkiewicz, TPC HV full
|
|