Tue, 4.12.2012 17:45:25, A.Ivashkin, A-detector
|
Tue, 4.12.2012 13:50:29, Zoltan Fodor, measurements of the time of beam counters
|
Mon, 3.12.2012 18:14:48, D.Jokovic, TOF status at the start of Be run
|
Mon, 3.12.2012 17:19:43, A.Ivashkin, A-detector
|
Mon, 3.12.2012 16:48:23, O.Petukhov, PSD
|
Mon, 3.12.2012 10:54:38, S. Kowalski, Z Det
|
Fri, 30.11.2012 14:53:08, A.Laszlo, Pressure loss in VTPC chilled water circuit.
|
Tue, 27.11.2012 12:54:35, A.Aduszkiewicz, TPC voltage ramping up status
|
Mon, 8.10.2012 08:19:05, A.Laszlo, TPC potential strips were off for the whole run 
|
Mon, 8.10.2012 08:18:17, A.Aduszkiewicz, End of p+Pb run - TPC HV status
|
Wed, 3.10.2012 15:57:39, A.Aduszkiewicz, GAP TPC HV increased by another 10V
|
Wed, 3.10.2012 15:35:26, Z. Fodor, MTPC hut temperature
|
Tue, 2.10.2012 14:16:27, A.Aduszkiewicz, no helium between VT2 and MT
|
Mon, 1.10.2012 14:06:41, A.Aduszkiewicz, GAP TPC HV increased by 10V
|
Sat, 29.09.2012 17:14:38, Zoltan Fodor, Temperature in the MTPC hut
|
Tue, 25.09.2012 21:01:58, Zoltan Fodor, TOF readout problem
|
Fri, 21.09.2012 21:43:27, Zoltan Fodor, DAQ problem
|
Fri, 21.09.2012 18:52:50, A. Marcinek, Problems with BPD1 signals
|
Fri, 21.09.2012 13:16:10, D.Jokovic, TOF HV status at the start of p+Pb run
|
Thu, 20.09.2012 21:04:58, A.Laszlo, LMPD operational settings for p+Pb physics run
|
Thu, 20.09.2012 19:10:59, Zoltan Fodor, Magnet problem on VTX1 again
|
Thu, 20.09.2012 14:18:15, Zoltan Fodor, Magnet settings
|
Thu, 20.09.2012 00:20:20, A. Marcinek, BPD HV
|
Wed, 19.09.2012 15:36:53, A.Laszlo, He bag between MTPCL and R
|
Tue, 18.09.2012 17:51:56, A.Laszlo, Target alignment
|
Mon, 17.09.2012 14:05:42, A. Marcinek, BPD3 on beam and gas flow started in all BPDs
|
Mon, 17.09.2012 10:19:40, A.Laszlo, VTX1 test
|
Mon, 17.09.2012 10:18:38, A.Laszlo, Target holder change to LMPD
|
Fri, 24.08.2012 16:29:23, A.Laszlo, VTX1 magnet leak welded, box closed
|
Tue, 21.08.2012 14:40:29, A.Laszlo, VTX1 top insulator box closed
|
Mon, 13.08.2012 16:00:06, Z.fodor, PSD movement
|
Wed, 8.08.2012 13:53:21, Z. Fodor, S5 position
|
Mon, 6.08.2012 13:24:11, Z. Fodor, Magnet heating
|
Mon, 6.08.2012 10:25:15, A.Laszlo, Beam counters settings for 2012 VTX2-only run
|
Mon, 6.08.2012 08:43:42, A.Aduszkiewicz, TPC HV setting summer 2012
|
Thu, 2.08.2012 08:57:06, Z. Fodor, Problem with na61conv
|
Mon, 30.07.2012 13:52:55, Z. Fodor, Warning up VTX1 magnet
|
Thu, 26.07.2012 23:14:28, Oskar Wyszynski, Trigger settings for USA NA61 measurement
|
Thu, 26.07.2012 15:44:04, Z, Fodor, Magnet warm up
|
Tue, 24.07.2012 17:46:26, A.Aduszkiewicz, VTPC and GTPC voltages increasing
|
Wed, 18.07.2012 11:23:25, AL, ZF, PSD readout check
|
Mon, 16.07.2012 13:46:57, A.Laszlo, LMPD target change from Pb 0.5mm -> 1mm
|
Fri, 13.07.2012 13:58:23, Andras Laszlo, First production run for 158GeV/c p+Pb is 15852
|
Fri, 13.07.2012 02:49:02, A. Wilczek, Beam alignment 7x
|
Tue, 10.07.2012 10:41:14, A.Laszlo, Magnet settings for 2012 158GeV/c p+Pb data taking
|
Tue, 10.07.2012 02:59:38, A. Wilczek, Beam alignmet - continuation 6x
|
Thu, 5.07.2012 16:06:19, A.Laszlo, VTX1 magnet
|
Tue, 3.07.2012 17:19:28, Zoltan Fodor, 30GeV Magnetic Field
|
Tue, 3.07.2012 13:49:03, A.Sadovsky A.Wilczek, Beam alignmet on target study  
|
Fri, 29.06.2012 16:39:58, A.Aduszkiewicz, GAP TPC HV full
|
Fri, 29.06.2012 09:26:00, R.Planeta, position of S2
|
Thu, 28.06.2012 16:36:30, A.Aduszkiewicz, GAP TPC voltage reduced for Kr source installation
|
Wed, 27.06.2012 08:42:02, A.Laszlo, Kr calibration settings 
|
Mon, 25.06.2012 17:45:38, A.Aduszkiewicz, VTPC-1 voltage reduction for Kr calibration
|
Sat, 23.06.2012 19:29:26, A.Aduszkiewicz, TPC HV full
|
Sat, 23.06.2012 10:37:05, A. Marcinek, V1
|
Thu, 21.06.2012 10:07:28, A.Laszlo, Automatic HV trip detection in central DAQ
|
Wed, 20.06.2012 18:04:57, A. Marcinek, counter HV
|
Tue, 19.06.2012 11:11:50, A.Aduszkiewicz, TPC HV ramping up
|
Wed, 7.12.2011 17:52:15, A.Laszlo, Saved setting of 2011 ion run 13x
|
Thu, 1.12.2011 14:52:08, ,
|
Tue, 29.11.2011 17:42:32, Ivashkin A., PSD trigger thresholds
|
Tue, 29.11.2011 17:39:47, Ivashkin A., PSD position at beam
|
Thu, 24.11.2011 11:07:21, A. Ivashkin, PSD MAPD voltages
|
Thu, 24.11.2011 09:41:36, A. Ivashkin, PSD voltages for Pb runs
|
Tue, 22.11.2011 17:14:18, S. Pulawski, HV Setings of counter for 75A Gev/c Be beam. 11x
|
Sat, 19.11.2011 19:48:50, S. Pulawski, Signal cabel of Z get sum.
|
Thu, 17.11.2011 00:51:05, Z.Fodor, Added PSD summed analog signal to ADC
|
Thu, 17.11.2011 00:48:21, Z.Fodor, Deadtime after CAMAC fast clear changed
|
Wed, 16.11.2011 14:52:19, A. Aduszkiewicz, TPC HV
|
Tue, 15.11.2011 22:55:09, A.Laszlo, S.Pulawski, Oscillation observed on the pedestal line of VTPC2-Sector4,6
|
Tue, 15.11.2011 04:29:21, S.Kowalski, Zdet delay
|
Mon, 14.11.2011 11:43:26, A.Laszlo, Added Z-det signal to MTDC
|
Sat, 12.11.2011 19:57:26, Z.Fodor, A.Laszlo, T0 change
|
Sat, 12.11.2011 08:11:21, S, Kowalski, HV Quartz det
|
Fri, 11.11.2011 02:43:25, A. Aduszkiewicz, TPC HV status
|
Fri, 11.11.2011 01:57:45, H.-J. Mathes, Beam counter settings
|
Thu, 10.11.2011 12:33:06, H.-J. Mathes, Beam counter switch on
|
Wed, 9.11.2011 21:25:37, Seweryn Kowalski, Z-det ADC Channels
|
Wed, 9.11.2011 18:36:56, A. Aduszkiewicz, TPC HV
|
Wed, 9.11.2011 14:06:01, S, Kowalski, Z det
|
Tue, 8.11.2011 12:32:12, A.Aduszkiewicz, TPC HV drift and chambers
|
Mon, 7.11.2011 12:10:54, A. Aduszkiewicz, GAP TPC drift voltage
|
Mon, 7.11.2011 11:39:35, A.Laszlo, S.Pulawski, TPC pedestal oscillation observed again, now in full VTPC2-Sector6
|
Sat, 5.11.2011 18:45:41, A. Aduszkiewicz, TPC drift voltage 5kV
|
Fri, 4.11.2011 17:04:52, A. Aduszkiewicz, TPC drift voltage 1kV
|
Wed, 2.11.2011 16:29:11, A.Aduszkiewicz, TPC drift voltage
|
Sun, 18.09.2011 20:33:05, A.Laszlo, PSD sum signal to ADC1-10
|
Fri, 16.09.2011 09:20:06, A.Laszlo, PSD trigger uses aircore cable of S5 temporarily
|
Mon, 5.09.2011 11:58:55, W. Dominik, VT-2 noise fighting - story continues
|
Mon, 5.09.2011 10:05:26, W. Dominik, VTPC-2 noise oscillations understood!
|
Tue, 23.08.2011 12:04:53, T. Matulewicz, P. Roznowski, MTPC L drift length change 2
|
Mon, 22.08.2011 09:53:28, T. Matulewicz, P. Roznowski , MTPC L drift length change
|
Wed, 17.08.2011 14:46:09, S. Pulawski, Change in HV channels... 
|
Tue, 16.08.2011 17:37:20, A.Laszlo, Changed S5 HV to -1930V
|
Wed, 10.08.2011 14:35:21, A.Laszlo, Changing HV of S5 
|
Fri, 5.08.2011 11:35:02, A.Laszlo, MTPCL gating grid contact problem
|
Thu, 4.08.2011 18:47:29, Z.Fodor, A.Laszlo, Modification of MTDC mapping
|
Wed, 3.08.2011 20:03:59, Z.Fodor, A.Laszlo, Gating grid problem in VTPC2 repaired
|
Mon, 1.08.2011 14:02:33, W. Dominik, Magnets V1 & V2 settings and callibration
|
|