This is NA61/SHINE electronic logbook (read-only BACKUP!)

Run summary Shift logbook Run settings Beam logbook BPD logbook DAQ logbook DCS logbook Experts logbook Gas logbook TOF logbook Trigger logbook PSD logbook VD logbook Run coordination Detector Upgrade DRS logbook
  Logbook for all experts' activities, Page 3 of 4  NA61/SHINE logo
Entry  Tue, 4.12.2012 17:45:25, A.Ivashkin, A-detector 
Entry  Tue, 4.12.2012 13:50:29, Zoltan Fodor, measurements of the time of beam counters 
Entry  Mon, 3.12.2012 18:14:48, D.Jokovic, TOF status at the start of Be run  
Entry  Mon, 3.12.2012 17:19:43, A.Ivashkin, A-detector 
Entry  Mon, 3.12.2012 16:48:23, O.Petukhov, PSD 
Entry  Mon, 3.12.2012 10:54:38, S. Kowalski, Z Det 
Entry  Fri, 30.11.2012 14:53:08, A.Laszlo, Pressure loss in VTPC chilled water circuit. 
Entry  Tue, 27.11.2012 12:54:35, A.Aduszkiewicz, TPC voltage ramping up status 
Entry  Mon, 8.10.2012 08:19:05, A.Laszlo, TPC potential strips were off for the whole run id171-2012-10-08-082232.pngid171-2012-10-08-084436.png
Entry  Mon, 8.10.2012 08:18:17, A.Aduszkiewicz, End of p+Pb run - TPC HV status 
Entry  Wed, 3.10.2012 15:57:39, A.Aduszkiewicz, GAP TPC HV increased by another 10V 
Entry  Wed, 3.10.2012 15:35:26, Z. Fodor, MTPC hut temperature 
Entry  Tue, 2.10.2012 14:16:27, A.Aduszkiewicz, no helium between VT2 and MT 
Entry  Mon, 1.10.2012 14:06:41, A.Aduszkiewicz, GAP TPC HV increased by 10V 
Entry  Sat, 29.09.2012 17:14:38, Zoltan Fodor, Temperature in the MTPC hut 
Entry  Tue, 25.09.2012 21:01:58, Zoltan Fodor, TOF readout problem 
Entry  Fri, 21.09.2012 21:43:27, Zoltan Fodor, DAQ problem 
Entry  Fri, 21.09.2012 18:52:50, A. Marcinek, Problems with BPD1 signals 
Entry  Fri, 21.09.2012 13:16:10, D.Jokovic, TOF HV status at the start of p+Pb run 
Entry  Thu, 20.09.2012 21:04:58, A.Laszlo, LMPD operational settings for p+Pb physics run id160-2012-09-20-210514.png
Entry  Thu, 20.09.2012 19:10:59, Zoltan Fodor, Magnet problem on VTX1 again 
Entry  Thu, 20.09.2012 14:18:15, Zoltan Fodor, Magnet settings 
Entry  Thu, 20.09.2012 00:20:20, A. Marcinek, BPD HV 
Entry  Wed, 19.09.2012 15:36:53, A.Laszlo, He bag between MTPCL and R 
Entry  Tue, 18.09.2012 17:51:56, A.Laszlo, Target alignment 
Entry  Mon, 17.09.2012 14:05:42, A. Marcinek, BPD3 on beam and gas flow started in all BPDs 
Entry  Mon, 17.09.2012 10:19:40, A.Laszlo, VTX1 test 
Entry  Mon, 17.09.2012 10:18:38, A.Laszlo, Target holder change to LMPD 
Entry  Fri, 24.08.2012 16:29:23, A.Laszlo, VTX1 magnet leak welded, box closed 
Entry  Tue, 21.08.2012 14:40:29, A.Laszlo, VTX1 top insulator box closed 
Entry  Mon, 13.08.2012 16:00:06, Z.fodor, PSD movement 
Entry  Wed, 8.08.2012 13:53:21, Z. Fodor, S5 position 
Entry  Mon, 6.08.2012 13:24:11, Z. Fodor, Magnet heating id147-2012-08-06-135710.png
Entry  Mon, 6.08.2012 10:25:15, A.Laszlo, Beam counters settings for 2012 VTX2-only run id146-2012-08-06-102522.png
Entry  Mon, 6.08.2012 08:43:42, A.Aduszkiewicz, TPC HV setting summer 2012 id145-2012-08-06-084247.png
Entry  Thu, 2.08.2012 08:57:06, Z. Fodor, Problem with na61conv 
Entry  Mon, 30.07.2012 13:52:55, Z. Fodor, Warning up VTX1 magnet 
Entry  Thu, 26.07.2012 23:14:28, Oskar Wyszynski, Trigger settings for USA NA61 measurement 
Entry  Thu, 26.07.2012 15:44:04, Z, Fodor, Magnet warm up id141-2012-07-26-173927.png
Entry  Tue, 24.07.2012 17:46:26, A.Aduszkiewicz, VTPC and GTPC voltages increasing id140-2012-07-24-174537.png
Entry  Wed, 18.07.2012 11:23:25, AL, ZF, PSD readout check 
Entry  Mon, 16.07.2012 13:46:57, A.Laszlo, LMPD target change from Pb 0.5mm -> 1mm id138-2012-07-16-134702.png
Entry  Fri, 13.07.2012 13:58:23, Andras Laszlo, First production run for 158GeV/c p+Pb is 15852 
Entry  Fri, 13.07.2012 02:49:02, A. Wilczek, Beam alignment 7x
Entry  Tue, 10.07.2012 10:41:14, A.Laszlo, Magnet settings for 2012 158GeV/c p+Pb data taking 
Entry  Tue, 10.07.2012 02:59:38, A. Wilczek, Beam alignmet - continuation 6x
Entry  Thu, 5.07.2012 16:06:19, A.Laszlo, VTX1 magnet 
Entry  Tue, 3.07.2012 17:19:28, Zoltan Fodor, 30GeV Magnetic Field 
Entry  Tue, 3.07.2012 13:49:03, A.Sadovsky A.Wilczek, Beam alignmet on target study id131-2012-07-03-135235.pngid131-2012-07-03-135312.pngid131-2012-07-03-140524.png
Entry  Fri, 29.06.2012 16:39:58, A.Aduszkiewicz, GAP TPC HV full 
Entry  Fri, 29.06.2012 09:26:00, R.Planeta, position of S2 
Entry  Thu, 28.06.2012 16:36:30, A.Aduszkiewicz, GAP TPC voltage reduced for Kr source installation id128-2012-06-28-173514.png
Entry  Wed, 27.06.2012 08:42:02, A.Laszlo, Kr calibration settings id127-2012-06-27-084234.pngid127-2012-06-27-165734.png
Entry  Mon, 25.06.2012 17:45:38, A.Aduszkiewicz, VTPC-1 voltage reduction for Kr calibration 
Entry  Sat, 23.06.2012 19:29:26, A.Aduszkiewicz, TPC HV full 
Entry  Sat, 23.06.2012 10:37:05, A. Marcinek, V1 
Entry  Thu, 21.06.2012 10:07:28, A.Laszlo, Automatic HV trip detection in central DAQ 
Entry  Wed, 20.06.2012 18:04:57, A. Marcinek, counter HV 
Entry  Tue, 19.06.2012 11:11:50, A.Aduszkiewicz, TPC HV ramping up 
Entry  Wed, 7.12.2011 17:52:15, A.Laszlo, Saved setting of 2011 ion run 13x
Entry  Thu, 1.12.2011 14:52:08, ,  
Entry  Tue, 29.11.2011 17:42:32, Ivashkin A., PSD trigger thresholds 
Entry  Tue, 29.11.2011 17:39:47, Ivashkin A., PSD position at beam 
Entry  Thu, 24.11.2011 11:07:21, A. Ivashkin, PSD MAPD voltages 
Entry  Thu, 24.11.2011 09:41:36, A. Ivashkin, PSD voltages for Pb runs 
Entry  Tue, 22.11.2011 17:14:18, S. Pulawski, HV Setings of counter for 75A Gev/c Be beam. 11x
Entry  Sat, 19.11.2011 19:48:50, S. Pulawski, Signal cabel of Z get sum. 
Entry  Thu, 17.11.2011 00:51:05, Z.Fodor, Added PSD summed analog signal to ADC 
Entry  Thu, 17.11.2011 00:48:21, Z.Fodor, Deadtime after CAMAC fast clear changed 
Entry  Wed, 16.11.2011 14:52:19, A. Aduszkiewicz, TPC HV 
Entry  Tue, 15.11.2011 22:55:09, A.Laszlo, S.Pulawski, Oscillation observed on the pedestal line of VTPC2-Sector4,6 
Entry  Tue, 15.11.2011 04:29:21, S.Kowalski, Zdet delay 
Entry  Mon, 14.11.2011 11:43:26, A.Laszlo, Added Z-det signal to MTDC 
Entry  Sat, 12.11.2011 19:57:26, Z.Fodor, A.Laszlo, T0 change 
Entry  Sat, 12.11.2011 08:11:21, S, Kowalski, HV Quartz det 
Entry  Fri, 11.11.2011 02:43:25, A. Aduszkiewicz, TPC HV status 
Entry  Fri, 11.11.2011 01:57:45, H.-J. Mathes, Beam counter settings 
Entry  Thu, 10.11.2011 12:33:06, H.-J. Mathes, Beam counter switch on 
Entry  Wed, 9.11.2011 21:25:37, Seweryn Kowalski, Z-det ADC Channels 
Entry  Wed, 9.11.2011 18:36:56, A. Aduszkiewicz, TPC HV 
Entry  Wed, 9.11.2011 14:06:01, S, Kowalski, Z det 
Entry  Tue, 8.11.2011 12:32:12, A.Aduszkiewicz, TPC HV drift and chambers 
Entry  Mon, 7.11.2011 12:10:54, A. Aduszkiewicz, GAP TPC drift voltage 
Entry  Mon, 7.11.2011 11:39:35, A.Laszlo, S.Pulawski, TPC pedestal oscillation observed again, now in full VTPC2-Sector6 
Entry  Sat, 5.11.2011 18:45:41, A. Aduszkiewicz, TPC drift voltage 5kV 
Entry  Fri, 4.11.2011 17:04:52, A. Aduszkiewicz, TPC drift voltage 1kV 
Entry  Wed, 2.11.2011 16:29:11, A.Aduszkiewicz, TPC drift voltage 
Entry  Sun, 18.09.2011 20:33:05, A.Laszlo, PSD sum signal to ADC1-10 
Entry  Fri, 16.09.2011 09:20:06, A.Laszlo, PSD trigger uses aircore cable of S5 temporarily 
Entry  Mon, 5.09.2011 11:58:55, W. Dominik, VT-2 noise fighting - story continues 
Entry  Mon, 5.09.2011 10:05:26, W. Dominik, VTPC-2 noise oscillations understood! 
Entry  Tue, 23.08.2011 12:04:53, T. Matulewicz, P. Roznowski, MTPC L drift length change 2 
Entry  Mon, 22.08.2011 09:53:28, T. Matulewicz, P. Roznowski , MTPC L drift length change  
Entry  Wed, 17.08.2011 14:46:09, S. Pulawski, Change in HV channels... id86-2011-08-17-144621.pngid86-2011-08-17-144650.png
Entry  Tue, 16.08.2011 17:37:20, A.Laszlo, Changed S5 HV to -1930V 
Entry  Wed, 10.08.2011 14:35:21, A.Laszlo, Changing HV of S5 id84-2011-08-10-143537.pngid84-2011-08-10-184333.png
Entry  Fri, 5.08.2011 11:35:02, A.Laszlo, MTPCL gating grid contact problem 
Entry  Thu, 4.08.2011 18:47:29, Z.Fodor, A.Laszlo, Modification of MTDC mapping 
Entry  Wed, 3.08.2011 20:03:59, Z.Fodor, A.Laszlo, Gating grid problem in VTPC2 repaired 
Entry  Mon, 1.08.2011 14:02:33, W. Dominik, Magnets V1 & V2 settings and callibration 
ELOG V3.1.3-7933898