  Logbook for all experts' activities, Page 1 of 4  NA61/SHINE logo
ID Date Author Subject Text Attachments
  376   Tue, 11.08.2026 16:48:37 Barnabas Porfy, Tomek KowalskiTPC tests + VD testsWe are trying to find signal in trigger jitter.

We switched VTPC-1 trigger optic cable to
 printscreen_376_20260811-164935.png 
  375   Mon, 3.08.2026 08:56:26 B. Maksiak, A. DmitrievFinal HV settings for neutrino 2026 runz   6x 
  374   Wed, 8.07.2026 15:39:06 V.OzvenchukTPC HV settings for 2026 neutrino run                             VTPC-1       
      Gap TPC          VTPC-2          FTPC
1          MTPC-L                     MTPC-R
  
  373   Wed, 8.07.2026 14:00:14 Andras LaszloGRC settings for 2026 proton+Nitrogen runMon, 6.07.2026 10:00:00 (A.Laszlo):
HV jumper settings: GRC-1 all SenseWires
ON (low multiplicity setting -- unchanged),
  
  372   Wed, 1.04.2026 08:33:40 L. Biardzki, B. Maksiak, A. DmitrievFinal HV setting for pp 2026   8x 
  371   Wed, 11.03.2026 21:40:55 B. LyonTPC HV settings for 2026 p+p run[TABLE border="0" cellspacing="10"] 
                  |   VTPC-1  |  Gap TPC
 |  VTPC-2  |  FTPC 1  |  MTPC-L |  MTPC-R
  
  370   Mon, 9.03.2026 13:53:23 Andras LaszloGRC settings for 2026 proton+proton runMon,  9.03.2026 13:54:08 (AL):
HV jumper settings: GRC-1 all SenseWires
ON (low multiplicity setting -- unchanged),
  
  369   Tue, 28.10.2025 20:08:28 B. LyonTPC HV Settings for p+p 300GeV/c run and Pb+Pb run (with GRC)[TABLE border="0" cellspacing="10"] 
                  |   VTPC-1  |  Gap TPC
 |  VTPC-2  |  FTPC 1  |  MTPC-L |  MTPC-R
  
  368   Mon, 27.10.2025 10:31:25 Andras LaszloGRC settings for 2025 proton+proton runMon, 27.10.2025 10:31:24 (AL):
HV jumper settings: GRC-1 all SenseWires
on (low multiplicity setting -- unchanged),
  
  367   Sat, 2.08.2025 12:48:29 B. MaksiakCAEN HV power supply failures[B]Single event[/B] - behavior: the board
loses connection, it disappears from GECO
or any other means of communication.
  
  366   Mon, 7.07.2025 08:09:03 A. DmitrievHV and LV settings for 2025 Oxygen run   9x 
  365   Sat, 28.06.2025 15:52:43 Paweltarget scanTarget scan was performed:
Estimated carbon target position: -17 mm
Estimated H2O target position: 33 mm
  
  364   Thu, 26.06.2025 16:40:34 T.CzopowiczHV channels swapped (V1 <-> TOFF-32B)V1 is now connected to 05.003.
TOFF-32B is now connected to 06.006
Module 5 gives more current.
  
  363   Wed, 25.06.2025 13:11:05 A. Dmitriev, V. OzvenchukTPC High Voltage for 2025 O+O run (small TPCs) [TABLE border="0" cellspacing="10"] 

|  FTPC-1 |  FTPC-2  |  FTPC-3  | GTPC |
  
  362   Mon, 23.06.2025 14:01:56 A. Dmitriev, V. OzvenchukTPC High Voltage for 2025 O+O run (big TPCs + GRC)[TABLE border="0" cellspacing="10"] 
                          |  VTPC-1 |  VTPC-2
 |  MTPC-L  | MTPC-R   | GRC-1 | |-
  
  361   Sun, 22.06.2025 17:39:51 Y. Nagai2025 Neutrino run settings (p+LBNF at 120 GeV/c)   printscreen_361_20250622-175141.pngprintscreen_361_20250622-175208.pngprintscreen_361_20250622-175218.pngprintscreen_361_20250622-175234.pngprintscreen_361_20250622-175249.png 
  360   Thu, 19.06.2025 19:11:52 Y. BalkovaAlignment during neutrino run 2025 Thu, 19.06.2025 19:12:17 

For two days, we were trying to take the
  
  359   Wed, 18.06.2025 14:19:29 FTPC Oxygen run settings instructionsAndras Laszlo
In order to run FTPCs for the Oxygen run,
the following protocol is suggesed.
  
  358   Sun, 8.06.2025 14:31:51 Andras Laszlo, Richard NagyGRC settings for 2025 neutrino runSun,  8.06.2025 14:32:16 (AL,RN):
HV jumper settings: GRC-1 all SenseWires
on (low multiplicity setting), GRC-2 all
  
  357   Wed, 4.06.2025 19:59:38 A. Dmitriev, V. Ozvenchuk, R. NagyTPC High Voltage for 2025 Neutrino runs[TABLE border="0" cellspacing="10"] 
                          |   LTT   |  VTPC-1
| Gap TPC   | VTPC-2   |  FTPC-1   | MTPC-L
  
  356   Mon, 2.06.2025 17:00:35 Richard Nagy, Andras LaszloLTT - 2025 Neutrino RunMon,  2.06.2025 17:01:37 (RN): Entry created
for 2025 Neutrino Run
  
  355   Mon, 2.12.2024 07:49:26 Piotrek Podlaski (for the last time)HV and LV settings for 2024 fragmentation run   7x 
  354   Thu, 28.11.2024 14:42:00 I. PidhurskyiFix reaction IDs for fragmentation runsUPDATED BOOKKEEPING

changes:
  
  353   Fri, 1.11.2024 00:34:06 Andras LaszloGRC settings for 2024 Pb runFri,  1.11.2024 00:34:04 (AL): Changed GRC2
to single-wire mode. GRC1 is in full acceptance
mode.
 printscreen_353_20241115-061220.png 
  352   Fri, 18.10.2024 15:07:03 B. LyonTPC High Voltage for 2024 pi+C and Pb runs[TABLE border="0" cellspacing="10"] 
                  |   VTPC-1  |  Gap TPC
 |  VTPC-2  |  FTPC 1  |  MTPC-L |  MTPC-R
  
  351   Sat, 13.07.2024 12:36:35 I. PidhurskyiList of runs to fix in bookkeeping Run 44231 -- All zero-suppression thresholds
for TPCs were set to zero due to a bug in
the tdaq-control. (remove?)
  
  351   Sat, 13.07.2024 12:36:35 I. PidhurskyiList of runs to fix in bookkeeping Run 44231 -- All zero-suppression thresholds
for TPCs were set to zero due to a bug in
the tdaq-control. (remove?)
  
  350   Sun, 7.07.2024 19:25:29 Andras LaszloGRC settings for 2024 neutrino runSun,  7.07.2024 19:25:44 (AL):
Flow: GRC-1,2 at 4.0 l/h : 0.8 l/h (Ar:CO2).
Voltages: Udrift=-0V, Usw=1400V. (Slow Isw
  
  350   Sun, 7.07.2024 19:25:29 Andras LaszloGRC settings for 2024 neutrino runSun,  7.07.2024 19:25:44 (AL):
Flow: GRC-1,2 at 4.0 l/h : 0.8 l/h (Ar:CO2).
Voltages: Udrift=-0V, Usw=1400V. (Slow Isw
  
  349   Sat, 6.07.2024 19:09:05 Richard Nagy, Andras Laszlo, Piotr PodlaskiLTT commissioning* Sat,  6.07.2024 19:09:27 Gating grid scan:

Ugg[V] Isw[nA] (with totally open gate)
 printscreen_349_20240707-185351.pngprintscreen_350_20240710-162231.pngprintscreen_350_20240712-134546.png 
  349   Sat, 6.07.2024 19:09:05 Richard Nagy, Andras Laszlo, Piotr PodlaskiLTT commissioning* Sat,  6.07.2024 19:09:27 Gating grid scan:

Ugg[V] Isw[nA] (with totally open gate)
 printscreen_349_20240707-185351.pngprintscreen_350_20240710-162231.pngprintscreen_350_20240712-134546.png 
  348   Fri, 28.06.2024 15:40:10 B. LyonHV TPC - 2024 Neutrino runamplification voltage/drift voltage

[TABLE border="1" cellspacing="2"] 
  
  348   Fri, 28.06.2024 15:40:10 B. LyonHV TPC - 2024 Neutrino runamplification voltage/drift voltage

[TABLE border="1" cellspacing="2"] 
  
  347   Sun, 29.10.2023 14:09:36 2023 Pb run HV settings     13x 
  346   Thu, 28.09.2023 08:58:22 P. PodlaskiHV in legacy TPC - 2023 Pb runamplification voltage/drift voltage

[TABLE border="0" cellspacing="10"] 
 printscreen_346_20231029-140853.png 
  345   Wed, 16.08.2023 07:47:11 P. PodlaskiHV status before shutdown    
  344   Tue, 4.07.2023 14:35:20 A.LaszloFTPC HV StatusTue,  4.07.2023 14:35:50 (AL): Setting FTPC2,3
drift field to Udrift=-1730V (Idrift=10uA).
Current consumption OK.
  
  343   Tue, 4.07.2023 14:25:51 A.LaszloGRC settings for 2023 neutrinos runTue,  4.07.2023 14:25:47 (AL): Starting gas
flow of GRC-1,2 for purging. Only 2.5ln/h
(Ar) and 0.5ln/h(CO2).
  
  342   Mon, 3.07.2023 09:57:25 P. PodlaskiLegacy TPC HV status - 2023 neutrino runamplification voltage/drift voltage

[TABLE border="0" cellspacing="10"] 
  
  341   Fri, 18.11.2022 18:05:01 M. Bielewicz, J. Szewinski, A. Izvestnyy, N. Karpushkin, D. RybkaFPSD and MPSD position callibrationFri, 18.11.2022 18:05:07 FPSD and set for
central plus 14.8 cm to Jura
Fri, 18.11.2022 18:05:30 Close the area and
  
  340   Thu, 17.11.2022 20:18:36 M. Bielewicz, J. Szewinski, A. Izvestnyy, N. Karpushkin, D. RybkaMPSD position callibrationThu, 17.11.2022 19:30:21 Move MPSD to the
central position
Thu, 17.11.2022 20:00:52 Close the door to
  
  339   Wed, 16.11.2022 13:55:58 Andras LaszloGRC settings for 2022 Pb run
Wed, 16.11.2022 13:35:17 (AL): disconnected
GRC2, for tests, GRC1 back on 1540V. Will
  
  338   Mon, 14.11.2022 11:39:03 A. IzvestnyyF-PSD positionMon, 14.11.2022 11:39:16 F-PSD was moved to
a 13.5 cm offset towards Jura from the central
position.
  
  337   Sun, 13.11.2022 00:08:29 M. Bielewicz, J. Szewinski, O. Izvestnyy, N. KarpushkinPSD callibratrionAll run have wrong label "0 GeV Krypton Calibration
2022"
Sun, 13.11.2022 00:10:13 Experimental area
  
  336   Fri, 11.11.2022 23:12:37 B. Rumberger, P. PodlaskiGTPC Drift HV IssuesFri, 11.11.2022 23:12:37 BR: GTPC drift HV
supply did not show current increasing linearly
with voltage. Current would stay at 0A until
  
  335   Fri, 4.11.2022 18:38:54 P. Podlaski"Old" TPC HV status, Kr+Pb runamplification voltage/drift voltage

[TABLE border="0" cellspacing="10"] 
  
  334   Fri, 4.11.2022 17:51:59 P. Podlaski, W.Brylinski, B. Porfy, G.Stefanek, T. Susa, B. Kozlowski, A. SeryakovKr calibration - November 2022FTPC-2 runs: 41015, 41016, 41017, 41018, 41019,
41020, 41021, 41022, 41023, 41024, 41025,
41026, 41027 ([COLOR=darkgreen][B]75M[/B][/COLOR]
  
  333   Fri, 4.11.2022 10:51:08 P. Podlaski, W. BrylinskiTuning GG timing for Kr data-taking    
  332   Thu, 3.11.2022 16:15:34 B. Rumberger, P. PodlaskiFTPC HV StatusDrift voltage / Amplification voltage

 [TABLE border="0" cellspacing="10"] 
  
  331   Tue, 26.07.2022 11:16:24 P. Podlaski, B. RumbergerHV and LV settings for T2K LT run (2022)   6x 
  330   Fri, 22.07.2022 11:39:53 B. Rumberger, P. Podlaski, Y. Nagai, M. FriendDelay Wire Chamber - GEM-BPD Alignment-Ramp field to 0. 
-Remove target.
-Move S4 to field 0 position.
  
  329   Wed, 20.07.2022 11:02:29 W. BrylinskiT2K run - pulser callibration dataRun list:
- 40737 - pulser data, default configuration
(glitch filter off)
  
  328   Sat, 16.07.2022 11:37:04 B. RumbergerFTPC2 Field Cage Resistor Chain MalfunctionWednesday 13 July, 10:00 AM: BR: Andras and
I heard arcing noises coming from FTPC2.
  
  327   Thu, 14.07.2022 04:11:38 A.LaszloGRC test pulser data and settingsMon, 04.07.2022 18:24:40 A.Laszlo: 31 GeV/c
h+ (proton) beam into 158GeV/c bending field,
beam bent to ~center of GRC2 (GRC1 is off).
  
  326   Thu, 7.07.2022 16:46:37 Y. NagaiBeam position fine tunings (T2K replica target run 2022)We observe beam vertical position change frequently.
Below summarize the adjustment history. 
It seems to have some correlation with accelerator
  
  325   Thu, 7.07.2022 11:53:29 Y. NagaiIntensity Scan result (T2K replica target run 2022, p+T2K graphite at 31 GeV/c)S1 = beam intensity
L2 = # of events recorded
frac(N=1) = fraction of events without off-time
 printscreen_325_20220707-115424.pngNA61_T2KreplicaTarget_runStatus_20220719-2.pdf 
  324   Tue, 5.07.2022 12:24:02 K. WojcikT2K run S4 position scanTue,  5.07.2022 12:24:43 Horizontal S4 scan.
Set nominal current for TRIM.021.492 : -4.1
A. DID NOT change the magnet current (-3.7
 8x 
  323   Mon, 4.07.2022 01:20:05 K.Sakashita, Y. Nagaibeam parameters for 31GeV/c run 2022three files attached. 

 * all the XSCI were moved out to minimize
 CESAR_GUI_9.7.3_04-Jul-22_01-19-44.pngCESAR_GUI_9.7.3_04-Jul-22_01-19-11.pngCESAR_GUI_9.7.3_04-Jul-22_01-17-42.png 
  322   Sat, 2.07.2022 23:40:19 K.SakashitaCESAR capture for 31GeV/c tuning   CESAR_GUI_9.7.3_02-Jul-22_23-39-49.pngCESAR_GUI_9.7.3_02-Jul-22_23-42-19.png 
  321   Fri, 1.07.2022 23:59:53 Kamil W.CEDAR diaphragm scan (T2K run)CEDAR (pressure 3.32 bar)
diaphragm | 6-fold/trig | 7-fold/trig | 8-fold/trig
----------+-------------+-------------+-------------
  
  320   Thu, 30.06.2022 11:20:51 WB, PPTPC zero suppression threshold scanThu, 30.06.2022 11:19:53  TPC zero suppression
threshold:
- 40154: threshold: 1
  
  319   Wed, 29.06.2022 22:48:07 P. PodlaskiTPC HV scanWed, 29.06.2022 22:48:08 Started TPC HV scan.

  
  318   Wed, 29.06.2022 11:23:10 Kamil W., Yoshikazu N. Ken S.S3 and S2 scan (T2K run)   6x 
  317   Tue, 28.06.2022 20:44:05 Kamil W., Yoshikazu N. Ken S.Colimators and beam tunning for T2K run   CESAR_GUI_9.7.3_28-Jun-22_20-43-40.pngCESAR_GUI_9.7.3_28-Jun-22_23-03-23.pngCESAR_GUI_9.7.3_28-Jun-22_23-07-10.png 
  316   Tue, 28.06.2022 18:51:55 Kamil W.THC scan for protons (30 GeV/c T2K)
Wed, 29.06.2022 07:55:51 THC full scan complete
and attached.
 8x 
  315   Tue, 28.06.2022 16:59:00 Kamil W.THC scanLow pressure range scan  CESAR_GUI_9.7.3_28-Jun-22_16-59-33.png 
  314   Tue, 28.06.2022 10:48:08 Kamil W.CEDAR scan 31GeV/c protons (T2K)   PRESS       TRIGG          6-FOLD     
    7-FOLD          8-FOLD   
------------------------------------------------------------------------
 CESAR_GUI_9.7.3_28-Jun-22_10-51-35.png 
  313   Mon, 27.06.2022 21:00:16 B. Rumberger, K. AllisonFTOF HV StatusMon, 27.06.2022 21:00:28: FTOF HV turned on
for T2K run.
  
  312   Sun, 26.06.2022 20:50:11 SzymonCEDAR scan 31GeV/cPRESS       TRIGG          6-FOLD        
 7-FOLD          8-FOLD   
------------------------------------------------------------------------
 Screenshot_2022-06-26_20-52-46.png 
  311   Sun, 26.06.2022 13:54:33 K.SakashitaT2K target installation work on June 25- Tightened fixing screws of the side support
bar since it was found that these screws
were not so tight. In order to reduce possibility
 IMG_3743.jpegIMG_1652.jpeg 
  310   Sun, 26.06.2022 13:42:52 K.SakashitaT2K target installation work on June 24- install T2K replica target. We installed
the label "C".  
- adjusted the position of S3 in order to
  
  309   Sun, 26.06.2022 12:57:43 K.SakashitaT2K target installation work on June 23- GEM-BPD was installed after adjusting the
position of the concrete block
- Modify the position fixing parts of the
 IMG_9508.jpegImage_from_iOS_(4).jpg 
  308   Thu, 23.06.2022 18:03:39 M. Kuich"Old" TPC HV statusamplification voltage/drift voltage

[TABLE border="0" cellspacing="10"] 
  
  307   Wed, 22.06.2022 19:16:57 K.SakashitaT2K target installation workK.Sakashita, Y.Nagai, H.Kitagawa, Y.Shiraishi

 IMG_4976.jpegIMG_4975.jpeg 
  306   Tue, 24.05.2022 19:04:36 PP, BR, WBBad RCUsSome RCUs in VTPC2 are seen to unconfigure
after some time. They will restore to default
configuration.
  
  305   Sat, 21.05.2022 23:19:08 PP WBTPC rate testsFull MTPC+VTPC:

  
  304   Tue, 10.05.2022 10:41:47 PP, WBMTPC non working sectorsFollowing sectors are not working (zero current,
no particles visible):
[LIST]
 Screenshot_from_2022-05-10_10-45-30.png 
  303   Fri, 1.04.2022 15:54:22 P. Podlaski, W. BrylinskiMTPC cooling temperaturesFri,  1.04.2022 15:54:31 Changing the temperatures
of cooling 16.5 -> 15.5
  
  302   Sun, 14.11.2021 17:31:17 P. Podlaski, W. BrylinskiVTPCs and FTPCs sampling rate scan
- run : 279:
number of samples per channel:   700 
  
  301   Sat, 13.11.2021 17:35:48 B. Rumberger, P. Podlaski, W. BrylinskiTPC Voltage ScanSense wire voltage scan. Beginning at nominal
voltage and incrementing by 10 V. Run numbers
& currents will be noted.
  
  300   Sat, 13.11.2021 15:24:18 B. RumbergerFTPC HV StatusNov. 12th, 2021: Ramped sense wires to 200
V below nominal sense wire voltage.
Steps:
  
  299   Tue, 9.11.2021 13:53:38 Zoltan FodorMagnet test8.11 10:00 tried to rump up VTX1
11:40 VTX1 camp crashed by cryo after they
tried to ramp up the VTX2 and it is was 
  
  298   Thu, 28.10.2021 18:56:31 P. PodlaskiVTPCs HV status (first restart after LS2)amplification voltage/drift voltage

[TABLE border="0" cellspacing="10"] 
  
  297   Sat, 28.08.2021 09:48:28 BR, MK, MUVTPC1 FEC Final Cable InstallationFECs tested row-by-row & connectors glued
in place.
  
  296   Thu, 29.07.2021 11:38:11 PP BRVTPC-1 FEE testsA: 18 94 35 32 34 36
AB: 41 42 33 13 37 31
 RCU37Bad.pngRCU37Good.png 
  295   Fri, 9.07.2021 12:01:56 PP AL WBTPC adapter noise testsFri,  9.07.2021 12:02:59 Everything connected,
GG a calib. pulser terminated with 50 ohm
- RMS noise @ 1.75 (inner channels) - 2.3
  
  294   Tue, 9.07.2019 18:19:55 W. Brylinski P. Podlaski, D. TefelskiLMPD startupHV ramp up in LMPD:

Tue,  9.07.2019 18:20:33 Drift: 4000, Field
  
  293   Tue, 13.11.2018 17:56:21 M. KuichPb targets inside VDTue, 13.11.2018 17:56:11 Targets installed
in the VD: Pb 2mm - 37mm towards Jura; Pb
3mm - 37mm toward Saleve.
  
  292   Fri, 26.10.2018 16:37:58 B. Rumberger, P. PodlaskiFTPC HV status, November 2018 Neutrino run [TABLE border="0" cellspacing="10"] 
                           |         FTPC-1
           |         FTPC-2            |
  
  291   Fri, 26.10.2018 09:49:15 P. Podlaski, M. KuichMTPCs, VTPCs and GTPC HV status (neutrino run and Pb+Pb run and FRAGMENTATION run)amplification voltage/drift voltage

[TABLE border="0" cellspacing="10"] 
 9x 
  290   Wed, 1.08.2018 08:01:34 P. PodlaskiHN settings after 2018 LT run   printscreen_290_20180801-080339.pngprintscreen_290_20180801-080413.pngprintscreen_290_20180801-080424.pngprintscreen_290_20180801-080432.png 
  289   Fri, 6.07.2018 22:39:13 B. RumbergerFTPC Gating Grid Information and TroubleshootingFri,  7.06.2018 12:09:43 After bringing up
chamber sense wires to nominal voltages,
tracks were barely visible and had maximum
  
  288   Mon, 2.07.2018 11:01:55 B. RumbergerFTPC HV status, July 2018 Neutrino runFTPC Amplification voltage / Drift voltage.

Mon,  2.07.2018 11:04:04 BR: Starting voltage
 44PM.png45PM.png 
  287   Mon, 2.07.2018 10:48:44 B. RumbergerFTPC1 LV distribution board swapLV distribution board 246 (FTPC1) was preventing
motherboard from being switched on. Switched
out for board 124. Board 246 is now stored
  
  286   Sat, 30.06.2018 16:20:07 P. PodlaskiMTPCs, VTPCs and GTPC HV status (neutrino run)amplification voltage/drift voltage

[TABLE border="0" cellspacing="10"] 
  
  285   Wed, 20.06.2018 20:54:43 A.AduszkiewiczMTPC LV onLV for the MTPC wall was switched on.
I tried to power on concentrators using standalone
power supply, but it seems I connected the
  
  284   Wed, 20.06.2018 15:43:03 A.AduszkiewiczFTPC-1 shifted on beamFTPC-1 was moved to the beam axis yesterday.
Today the gas pipes were reconnected and
gas flow was restarted.
  
  283   Mon, 23.10.2017 21:26:24 E. KapturLowered TPC VoltagesOn Magda's orders I have lowered TPC voltages
by 200 V.
  
  282   Thu, 5.10.2017 13:33:44 M. KuichMTPCs, VTPCs and GapTPC HV status (p+Pb 40 and Xe+La)amplification voltage/drift voltage

[TABLE border="0" cellspacing="10"] 
 Screenshot-10-27-2017_10-37-11_PM.png 
  281   Wed, 6.09.2017 10:40:38 A.AduszkiewiczHV settings at the end of runS4: +2000V  11x 