This is NA61/SHINE electronic logbook (read-only BACKUP!)

Run summary Shift logbook Run settings Beam logbook BPD logbook DAQ logbook DCS logbook Experts logbook Gas logbook TOF logbook Trigger logbook PSD logbook VD logbook Run coordination Detector Upgrade DRS logbook
  Logbook for all experts' activities, Page 1 of 4  NA61/SHINE logo
Entry  Tue, 11.08.2026 16:48:37, Barnabas Porfy, Tomek Kowalski, TPC tests + VD tests printscreen_376_20260811-164935.png
Entry  Mon, 3.08.2026 08:56:26, B. Maksiak, A. Dmitriev, Final HV settings for neutrino 2026 runz 6x
Entry  Wed, 8.07.2026 15:39:06, V.Ozvenchuk, TPC HV settings for 2026 neutrino run  
Entry  Wed, 8.07.2026 14:00:14, Andras Laszlo, GRC settings for 2026 proton+Nitrogen run 
Entry  Wed, 1.04.2026 08:33:40, L. Biardzki, B. Maksiak, A. Dmitriev, Final HV setting for pp 2026 8x
Entry  Wed, 11.03.2026 21:40:55, B. Lyon, TPC HV settings for 2026 p+p run 
Entry  Mon, 9.03.2026 13:53:23, Andras Laszlo, GRC settings for 2026 proton+proton run 
Entry  Tue, 28.10.2025 20:08:28, B. Lyon, TPC HV Settings for p+p 300GeV/c run and Pb+Pb run (with GRC) 
Entry  Mon, 27.10.2025 10:31:25, Andras Laszlo, GRC settings for 2025 proton+proton run 
Entry  Sat, 2.08.2025 12:48:29, B. Maksiak, CAEN HV power supply failures 
Entry  Mon, 7.07.2025 08:09:03, A. Dmitriev, HV and LV settings for 2025 Oxygen run 9x
Entry  Sat, 28.06.2025 15:52:43, Pawel, target scan 
Entry  Thu, 26.06.2025 16:40:34, T.Czopowicz, HV channels swapped (V1 <-> TOFF-32B) 
Entry  Wed, 25.06.2025 13:11:05, A. Dmitriev, V. Ozvenchuk, TPC High Voltage for 2025 O+O run (small TPCs)  
Entry  Mon, 23.06.2025 14:01:56, A. Dmitriev, V. Ozvenchuk, TPC High Voltage for 2025 O+O run (big TPCs + GRC) 
Entry  Sun, 22.06.2025 17:39:51, Y. Nagai, 2025 Neutrino run settings (p+LBNF at 120 GeV/c) printscreen_361_20250622-175141.pngprintscreen_361_20250622-175208.pngprintscreen_361_20250622-175218.pngprintscreen_361_20250622-175234.pngprintscreen_361_20250622-175249.png
Entry  Thu, 19.06.2025 19:11:52, Y. Balkova, Alignment during neutrino run 2025  
Entry  Wed, 18.06.2025 14:19:29, FTPC Oxygen run settings instructions, Andras Laszlo 
Entry  Sun, 8.06.2025 14:31:51, Andras Laszlo, Richard Nagy, GRC settings for 2025 neutrino run 
Entry  Wed, 4.06.2025 19:59:38, A. Dmitriev, V. Ozvenchuk, R. Nagy, TPC High Voltage for 2025 Neutrino runs 
Entry  Mon, 2.06.2025 17:00:35, Richard Nagy, Andras Laszlo, LTT - 2025 Neutrino Run 
Entry  Mon, 2.12.2024 07:49:26, Piotrek Podlaski (for the last time), HV and LV settings for 2024 fragmentation run 7x
Entry  Thu, 28.11.2024 14:42:00, I. Pidhurskyi, Fix reaction IDs for fragmentation runs 
Entry  Fri, 1.11.2024 00:34:06, Andras Laszlo, GRC settings for 2024 Pb run printscreen_353_20241115-061220.png
Entry  Fri, 18.10.2024 15:07:03, B. Lyon, TPC High Voltage for 2024 pi+C and Pb runs 
Entry  Sat, 13.07.2024 12:36:35, I. Pidhurskyi, List of runs to fix in bookkeeping  
Entry  Sat, 13.07.2024 12:36:35, I. Pidhurskyi, List of runs to fix in bookkeeping  
Entry  Sun, 7.07.2024 19:25:29, Andras Laszlo, GRC settings for 2024 neutrino run 
Entry  Sun, 7.07.2024 19:25:29, Andras Laszlo, GRC settings for 2024 neutrino run 
Entry  Sat, 6.07.2024 19:09:05, Richard Nagy, Andras Laszlo, Piotr Podlaski, LTT commissioning printscreen_349_20240707-185351.pngprintscreen_350_20240710-162231.pngprintscreen_350_20240712-134546.png
Entry  Sat, 6.07.2024 19:09:05, Richard Nagy, Andras Laszlo, Piotr Podlaski, LTT commissioning printscreen_349_20240707-185351.pngprintscreen_350_20240710-162231.pngprintscreen_350_20240712-134546.png
Entry  Fri, 28.06.2024 15:40:10, B. Lyon, HV TPC - 2024 Neutrino run 
Entry  Fri, 28.06.2024 15:40:10, B. Lyon, HV TPC - 2024 Neutrino run 
Entry  Sun, 29.10.2023 14:09:36, 2023 Pb run HV settings ,  13x
Entry  Thu, 28.09.2023 08:58:22, P. Podlaski, HV in legacy TPC - 2023 Pb run printscreen_346_20231029-140853.png
Entry  Wed, 16.08.2023 07:47:11, P. Podlaski, HV status before shutdown 
Entry  Tue, 4.07.2023 14:35:20, A.Laszlo, FTPC HV Status 
Entry  Tue, 4.07.2023 14:25:51, A.Laszlo, GRC settings for 2023 neutrinos run 
Entry  Mon, 3.07.2023 09:57:25, P. Podlaski, Legacy TPC HV status - 2023 neutrino run 
Entry  Fri, 18.11.2022 18:05:01, M. Bielewicz, J. Szewinski, A. Izvestnyy, N. Karpushkin, D. Rybka, FPSD and MPSD position callibration 
Entry  Thu, 17.11.2022 20:18:36, M. Bielewicz, J. Szewinski, A. Izvestnyy, N. Karpushkin, D. Rybka, MPSD position callibration 
Entry  Wed, 16.11.2022 13:55:58, Andras Laszlo, GRC settings for 2022 Pb run 
Entry  Mon, 14.11.2022 11:39:03, A. Izvestnyy, F-PSD position 
Entry  Sun, 13.11.2022 00:08:29, M. Bielewicz, J. Szewinski, O. Izvestnyy, N. Karpushkin, PSD callibratrion 
Entry  Fri, 11.11.2022 23:12:37, B. Rumberger, P. Podlaski, GTPC Drift HV Issues 
Entry  Fri, 4.11.2022 18:38:54, P. Podlaski, "Old" TPC HV status, Kr+Pb run 
Entry  Fri, 4.11.2022 17:51:59, P. Podlaski, W.Brylinski, B. Porfy, G.Stefanek, T. Susa, B. Kozlowski, A. Seryakov, Kr calibration - November 2022 
Entry  Fri, 4.11.2022 10:51:08, P. Podlaski, W. Brylinski, Tuning GG timing for Kr data-taking 
Entry  Thu, 3.11.2022 16:15:34, B. Rumberger, P. Podlaski, FTPC HV Status 
Entry  Tue, 26.07.2022 11:16:24, P. Podlaski, B. Rumberger, HV and LV settings for T2K LT run (2022) 6x
Entry  Fri, 22.07.2022 11:39:53, B. Rumberger, P. Podlaski, Y. Nagai, M. Friend, Delay Wire Chamber - GEM-BPD Alignment 
Entry  Wed, 20.07.2022 11:02:29, W. Brylinski, T2K run - pulser callibration data 
Entry  Sat, 16.07.2022 11:37:04, B. Rumberger, FTPC2 Field Cage Resistor Chain Malfunction 
Entry  Thu, 14.07.2022 04:11:38, A.Laszlo, GRC test pulser data and settings 
Entry  Thu, 7.07.2022 16:46:37, Y. Nagai, Beam position fine tunings (T2K replica target run 2022) 
Entry  Thu, 7.07.2022 11:53:29, Y. Nagai, Intensity Scan result (T2K replica target run 2022, p+T2K graphite at 31 GeV/c) printscreen_325_20220707-115424.pngNA61_T2KreplicaTarget_runStatus_20220719-2.pdf
Entry  Tue, 5.07.2022 12:24:02, K. Wojcik, T2K run S4 position scan 8x
Entry  Mon, 4.07.2022 01:20:05, K.Sakashita, Y. Nagai, beam parameters for 31GeV/c run 2022 CESAR_GUI_9.7.3_04-Jul-22_01-19-44.pngCESAR_GUI_9.7.3_04-Jul-22_01-19-11.pngCESAR_GUI_9.7.3_04-Jul-22_01-17-42.png
Entry  Sat, 2.07.2022 23:40:19, K.Sakashita, CESAR capture for 31GeV/c tuning CESAR_GUI_9.7.3_02-Jul-22_23-39-49.pngCESAR_GUI_9.7.3_02-Jul-22_23-42-19.png
Entry  Fri, 1.07.2022 23:59:53, Kamil W., CEDAR diaphragm scan (T2K run) 
Entry  Thu, 30.06.2022 11:20:51, WB, PP, TPC zero suppression threshold scan 
Entry  Wed, 29.06.2022 22:48:07, P. Podlaski, TPC HV scan 
Entry  Wed, 29.06.2022 11:23:10, Kamil W., Yoshikazu N. Ken S., S3 and S2 scan (T2K run) 6x
Entry  Tue, 28.06.2022 20:44:05, Kamil W., Yoshikazu N. Ken S., Colimators and beam tunning for T2K run CESAR_GUI_9.7.3_28-Jun-22_20-43-40.pngCESAR_GUI_9.7.3_28-Jun-22_23-03-23.pngCESAR_GUI_9.7.3_28-Jun-22_23-07-10.png
Entry  Tue, 28.06.2022 18:51:55, Kamil W., THC scan for protons (30 GeV/c T2K) 8x
Entry  Tue, 28.06.2022 16:59:00, Kamil W., THC scan CESAR_GUI_9.7.3_28-Jun-22_16-59-33.png
Entry  Tue, 28.06.2022 10:48:08, Kamil W., CEDAR scan 31GeV/c protons (T2K) CESAR_GUI_9.7.3_28-Jun-22_10-51-35.png
Entry  Mon, 27.06.2022 21:00:16, B. Rumberger, K. Allison, FTOF HV Status 
Entry  Sun, 26.06.2022 20:50:11, Szymon, CEDAR scan 31GeV/c Screenshot_2022-06-26_20-52-46.png
Entry  Sun, 26.06.2022 13:54:33, K.Sakashita, T2K target installation work on June 25 IMG_3743.jpegIMG_1652.jpeg
Entry  Sun, 26.06.2022 13:42:52, K.Sakashita, T2K target installation work on June 24 
Entry  Sun, 26.06.2022 12:57:43, K.Sakashita, T2K target installation work on June 23 IMG_9508.jpegImage_from_iOS_(4).jpg
Entry  Thu, 23.06.2022 18:03:39, M. Kuich, "Old" TPC HV status 
Entry  Wed, 22.06.2022 19:16:57, K.Sakashita, T2K target installation work IMG_4976.jpegIMG_4975.jpeg
Entry  Tue, 24.05.2022 19:04:36, PP, BR, WB, Bad RCUs 
Entry  Sat, 21.05.2022 23:19:08, PP WB, TPC rate tests 
Entry  Tue, 10.05.2022 10:41:47, PP, WB, MTPC non working sectors Screenshot_from_2022-05-10_10-45-30.png
Entry  Fri, 1.04.2022 15:54:22, P. Podlaski, W. Brylinski, MTPC cooling temperatures 
Entry  Sun, 14.11.2021 17:31:17, P. Podlaski, W. Brylinski, VTPCs and FTPCs sampling rate scan 
Entry  Sat, 13.11.2021 17:35:48, B. Rumberger, P. Podlaski, W. Brylinski, TPC Voltage Scan 
Entry  Sat, 13.11.2021 15:24:18, B. Rumberger, FTPC HV Status 
Entry  Tue, 9.11.2021 13:53:38, Zoltan Fodor, Magnet test 
Entry  Thu, 28.10.2021 18:56:31, P. Podlaski, VTPCs HV status (first restart after LS2) 
Entry  Sat, 28.08.2021 09:48:28, BR, MK, MU, VTPC1 FEC Final Cable Installation 
Entry  Thu, 29.07.2021 11:38:11, PP BR, VTPC-1 FEE tests RCU37Bad.pngRCU37Good.png
Entry  Fri, 9.07.2021 12:01:56, PP AL WB, TPC adapter noise tests 
Entry  Tue, 9.07.2019 18:19:55, W. Brylinski P. Podlaski, D. Tefelski, LMPD startup 
Entry  Tue, 13.11.2018 17:56:21, M. Kuich, Pb targets inside VD 
Entry  Fri, 26.10.2018 16:37:58, B. Rumberger, P. Podlaski, FTPC HV status, November 2018 Neutrino run  
Entry  Fri, 26.10.2018 09:49:15, P. Podlaski, M. Kuich, MTPCs, VTPCs and GTPC HV status (neutrino run and Pb+Pb run and FRAGMENTATION run) 9x
Entry  Wed, 1.08.2018 08:01:34, P. Podlaski, HN settings after 2018 LT run printscreen_290_20180801-080339.pngprintscreen_290_20180801-080413.pngprintscreen_290_20180801-080424.pngprintscreen_290_20180801-080432.png
Entry  Fri, 6.07.2018 22:39:13, B. Rumberger, FTPC Gating Grid Information and Troubleshooting 
Entry  Mon, 2.07.2018 11:01:55, B. Rumberger, FTPC HV status, July 2018 Neutrino run 44PM.png45PM.png
Entry  Mon, 2.07.2018 10:48:44, B. Rumberger, FTPC1 LV distribution board swap 
Entry  Sat, 30.06.2018 16:20:07, P. Podlaski, MTPCs, VTPCs and GTPC HV status (neutrino run) 
Entry  Wed, 20.06.2018 20:54:43, A.Aduszkiewicz, MTPC LV on 
Entry  Wed, 20.06.2018 15:43:03, A.Aduszkiewicz, FTPC-1 shifted on beam 
Entry  Mon, 23.10.2017 21:26:24, E. Kaptur, Lowered TPC Voltages 
Entry  Thu, 5.10.2017 13:33:44, M. Kuich, MTPCs, VTPCs and GapTPC HV status (p+Pb 40 and Xe+La) Screenshot-10-27-2017_10-37-11_PM.png
Entry  Wed, 6.09.2017 10:40:38, A.Aduszkiewicz, HV settings at the end of run 11x
ELOG V3.1.3-7933898