Tue, 11.08.2026 16:48:37, Barnabas Porfy, Tomek Kowalski, TPC tests + VD tests
|
Mon, 3.08.2026 08:56:26, B. Maksiak, A. Dmitriev, Final HV settings for neutrino 2026 runz 6x
|
Wed, 8.07.2026 15:39:06, V.Ozvenchuk, TPC HV settings for 2026 neutrino run
|
Wed, 8.07.2026 14:00:14, Andras Laszlo, GRC settings for 2026 proton+Nitrogen run
|
Wed, 1.04.2026 08:33:40, L. Biardzki, B. Maksiak, A. Dmitriev, Final HV setting for pp 2026 8x
|
Wed, 11.03.2026 21:40:55, B. Lyon, TPC HV settings for 2026 p+p run
|
Mon, 9.03.2026 13:53:23, Andras Laszlo, GRC settings for 2026 proton+proton run
|
Tue, 28.10.2025 20:08:28, B. Lyon, TPC HV Settings for p+p 300GeV/c run and Pb+Pb run (with GRC)
|
Mon, 27.10.2025 10:31:25, Andras Laszlo, GRC settings for 2025 proton+proton run
|
Sat, 2.08.2025 12:48:29, B. Maksiak, CAEN HV power supply failures
|
Mon, 7.07.2025 08:09:03, A. Dmitriev, HV and LV settings for 2025 Oxygen run 9x
|
Sat, 28.06.2025 15:52:43, Pawel, target scan
|
Thu, 26.06.2025 16:40:34, T.Czopowicz, HV channels swapped (V1 <-> TOFF-32B)
|
Wed, 25.06.2025 13:11:05, A. Dmitriev, V. Ozvenchuk, TPC High Voltage for 2025 O+O run (small TPCs)
|
Mon, 23.06.2025 14:01:56, A. Dmitriev, V. Ozvenchuk, TPC High Voltage for 2025 O+O run (big TPCs + GRC)
|
Sun, 22.06.2025 17:39:51, Y. Nagai, 2025 Neutrino run settings (p+LBNF at 120 GeV/c)    
|
Thu, 19.06.2025 19:11:52, Y. Balkova, Alignment during neutrino run 2025
|
Wed, 18.06.2025 14:19:29, FTPC Oxygen run settings instructions, Andras Laszlo
|
Sun, 8.06.2025 14:31:51, Andras Laszlo, Richard Nagy, GRC settings for 2025 neutrino run
|
Wed, 4.06.2025 19:59:38, A. Dmitriev, V. Ozvenchuk, R. Nagy, TPC High Voltage for 2025 Neutrino runs
|
Mon, 2.06.2025 17:00:35, Richard Nagy, Andras Laszlo, LTT - 2025 Neutrino Run
|
Mon, 2.12.2024 07:49:26, Piotrek Podlaski (for the last time), HV and LV settings for 2024 fragmentation run 7x
|
Thu, 28.11.2024 14:42:00, I. Pidhurskyi, Fix reaction IDs for fragmentation runs
|
Fri, 1.11.2024 00:34:06, Andras Laszlo, GRC settings for 2024 Pb run
|
Fri, 18.10.2024 15:07:03, B. Lyon, TPC High Voltage for 2024 pi+C and Pb runs
|
Sat, 13.07.2024 12:36:35, I. Pidhurskyi, List of runs to fix in bookkeeping
|
Sat, 13.07.2024 12:36:35, I. Pidhurskyi, List of runs to fix in bookkeeping
|
Sun, 7.07.2024 19:25:29, Andras Laszlo, GRC settings for 2024 neutrino run
|
Sun, 7.07.2024 19:25:29, Andras Laszlo, GRC settings for 2024 neutrino run
|
Sat, 6.07.2024 19:09:05, Richard Nagy, Andras Laszlo, Piotr Podlaski, LTT commissioning  
|
Sat, 6.07.2024 19:09:05, Richard Nagy, Andras Laszlo, Piotr Podlaski, LTT commissioning  
|
Fri, 28.06.2024 15:40:10, B. Lyon, HV TPC - 2024 Neutrino run
|
Fri, 28.06.2024 15:40:10, B. Lyon, HV TPC - 2024 Neutrino run
|
Sun, 29.10.2023 14:09:36, 2023 Pb run HV settings , 13x
|
Thu, 28.09.2023 08:58:22, P. Podlaski, HV in legacy TPC - 2023 Pb run
|
Wed, 16.08.2023 07:47:11, P. Podlaski, HV status before shutdown
|
Tue, 4.07.2023 14:35:20, A.Laszlo, FTPC HV Status
|
Tue, 4.07.2023 14:25:51, A.Laszlo, GRC settings for 2023 neutrinos run
|
Mon, 3.07.2023 09:57:25, P. Podlaski, Legacy TPC HV status - 2023 neutrino run
|
Fri, 18.11.2022 18:05:01, M. Bielewicz, J. Szewinski, A. Izvestnyy, N. Karpushkin, D. Rybka, FPSD and MPSD position callibration
|
Thu, 17.11.2022 20:18:36, M. Bielewicz, J. Szewinski, A. Izvestnyy, N. Karpushkin, D. Rybka, MPSD position callibration
|
Wed, 16.11.2022 13:55:58, Andras Laszlo, GRC settings for 2022 Pb run
|
Mon, 14.11.2022 11:39:03, A. Izvestnyy, F-PSD position
|
Sun, 13.11.2022 00:08:29, M. Bielewicz, J. Szewinski, O. Izvestnyy, N. Karpushkin, PSD callibratrion
|
Fri, 11.11.2022 23:12:37, B. Rumberger, P. Podlaski, GTPC Drift HV Issues
|
Fri, 4.11.2022 18:38:54, P. Podlaski, "Old" TPC HV status, Kr+Pb run
|
Fri, 4.11.2022 17:51:59, P. Podlaski, W.Brylinski, B. Porfy, G.Stefanek, T. Susa, B. Kozlowski, A. Seryakov, Kr calibration - November 2022
|
Fri, 4.11.2022 10:51:08, P. Podlaski, W. Brylinski, Tuning GG timing for Kr data-taking
|
Thu, 3.11.2022 16:15:34, B. Rumberger, P. Podlaski, FTPC HV Status
|
Tue, 26.07.2022 11:16:24, P. Podlaski, B. Rumberger, HV and LV settings for T2K LT run (2022) 6x
|
Fri, 22.07.2022 11:39:53, B. Rumberger, P. Podlaski, Y. Nagai, M. Friend, Delay Wire Chamber - GEM-BPD Alignment
|
Wed, 20.07.2022 11:02:29, W. Brylinski, T2K run - pulser callibration data
|
Sat, 16.07.2022 11:37:04, B. Rumberger, FTPC2 Field Cage Resistor Chain Malfunction
|
Thu, 14.07.2022 04:11:38, A.Laszlo, GRC test pulser data and settings
|
Thu, 7.07.2022 16:46:37, Y. Nagai, Beam position fine tunings (T2K replica target run 2022)
|
Thu, 7.07.2022 11:53:29, Y. Nagai, Intensity Scan result (T2K replica target run 2022, p+T2K graphite at 31 GeV/c) 
|
Tue, 5.07.2022 12:24:02, K. Wojcik, T2K run S4 position scan 8x
|
Mon, 4.07.2022 01:20:05, K.Sakashita, Y. Nagai, beam parameters for 31GeV/c run 2022  
|
Sat, 2.07.2022 23:40:19, K.Sakashita, CESAR capture for 31GeV/c tuning 
|
Fri, 1.07.2022 23:59:53, Kamil W., CEDAR diaphragm scan (T2K run)
|
Thu, 30.06.2022 11:20:51, WB, PP, TPC zero suppression threshold scan
|
Wed, 29.06.2022 22:48:07, P. Podlaski, TPC HV scan
|
Wed, 29.06.2022 11:23:10, Kamil W., Yoshikazu N. Ken S., S3 and S2 scan (T2K run) 6x
|
Tue, 28.06.2022 20:44:05, Kamil W., Yoshikazu N. Ken S., Colimators and beam tunning for T2K run  
|
Tue, 28.06.2022 18:51:55, Kamil W., THC scan for protons (30 GeV/c T2K) 8x
|
Tue, 28.06.2022 16:59:00, Kamil W., THC scan
|
Tue, 28.06.2022 10:48:08, Kamil W., CEDAR scan 31GeV/c protons (T2K)
|
Mon, 27.06.2022 21:00:16, B. Rumberger, K. Allison, FTOF HV Status
|
Sun, 26.06.2022 20:50:11, Szymon, CEDAR scan 31GeV/c
|
Sun, 26.06.2022 13:54:33, K.Sakashita, T2K target installation work on June 25 
|
Sun, 26.06.2022 13:42:52, K.Sakashita, T2K target installation work on June 24
|
Sun, 26.06.2022 12:57:43, K.Sakashita, T2K target installation work on June 23 
|
Thu, 23.06.2022 18:03:39, M. Kuich, "Old" TPC HV status
|
Wed, 22.06.2022 19:16:57, K.Sakashita, T2K target installation work 
|
Tue, 24.05.2022 19:04:36, PP, BR, WB, Bad RCUs
|
Sat, 21.05.2022 23:19:08, PP WB, TPC rate tests
|
Tue, 10.05.2022 10:41:47, PP, WB, MTPC non working sectors
|
Fri, 1.04.2022 15:54:22, P. Podlaski, W. Brylinski, MTPC cooling temperatures
|
Sun, 14.11.2021 17:31:17, P. Podlaski, W. Brylinski, VTPCs and FTPCs sampling rate scan
|
Sat, 13.11.2021 17:35:48, B. Rumberger, P. Podlaski, W. Brylinski, TPC Voltage Scan
|
Sat, 13.11.2021 15:24:18, B. Rumberger, FTPC HV Status
|
Tue, 9.11.2021 13:53:38, Zoltan Fodor, Magnet test
|
Thu, 28.10.2021 18:56:31, P. Podlaski, VTPCs HV status (first restart after LS2)
|
Sat, 28.08.2021 09:48:28, BR, MK, MU, VTPC1 FEC Final Cable Installation
|
Thu, 29.07.2021 11:38:11, PP BR, VTPC-1 FEE tests 
|
Fri, 9.07.2021 12:01:56, PP AL WB, TPC adapter noise tests
|
Tue, 9.07.2019 18:19:55, W. Brylinski P. Podlaski, D. Tefelski, LMPD startup
|
Tue, 13.11.2018 17:56:21, M. Kuich, Pb targets inside VD
|
Fri, 26.10.2018 16:37:58, B. Rumberger, P. Podlaski, FTPC HV status, November 2018 Neutrino run
|
Fri, 26.10.2018 09:49:15, P. Podlaski, M. Kuich, MTPCs, VTPCs and GTPC HV status (neutrino run and Pb+Pb run and FRAGMENTATION run) 9x
|
Wed, 1.08.2018 08:01:34, P. Podlaski, HN settings after 2018 LT run   
|
Fri, 6.07.2018 22:39:13, B. Rumberger, FTPC Gating Grid Information and Troubleshooting
|
Mon, 2.07.2018 11:01:55, B. Rumberger, FTPC HV status, July 2018 Neutrino run 
|
Mon, 2.07.2018 10:48:44, B. Rumberger, FTPC1 LV distribution board swap
|
Sat, 30.06.2018 16:20:07, P. Podlaski, MTPCs, VTPCs and GTPC HV status (neutrino run)
|
Wed, 20.06.2018 20:54:43, A.Aduszkiewicz, MTPC LV on
|
Wed, 20.06.2018 15:43:03, A.Aduszkiewicz, FTPC-1 shifted on beam
|
Mon, 23.10.2017 21:26:24, E. Kaptur, Lowered TPC Voltages
|
Thu, 5.10.2017 13:33:44, M. Kuich, MTPCs, VTPCs and GapTPC HV status (p+Pb 40 and Xe+La)
|
Wed, 6.09.2017 10:40:38, A.Aduszkiewicz, HV settings at the end of run 11x
|
|