  Logbook for all experts' activities, Page 2 of 4  NA61/SHINE logo
IDdown Date Author Subject Text Attachments
  280   Thu, 17.08.2017 11:37:34 Z. Fodor, P. PodlaskiVTPC-2 sector 2 issues    
  279   Sat, 5.08.2017 21:54:42 A.Laszlo FrontEnd card exchangeOn Aug 3 2017 21:00 we took out working FEE
card from MTPC-R, Sector-21, Padrow-1, Pad1-32
(most upstream, most Saleve side corner),
  
  278   Wed, 2.08.2017 21:22:25 EDZ, Y. Nagai, B. RumbergerFTPC HV statusamplification voltage/drift voltage/Mask voltage

  
  277   Sun, 30.07.2017 14:38:49 P. Podlaski"Old" TPC HV status.amplification voltage/drift voltage

[TABLE border="0" cellspacing="10"] 
  
  276   Sat, 8.07.2017 09:30:24 A.Aduszkiewicz"Old" TPC HV status.amplification voltage/drift voltage

[TABLE border="0" cellspacing="10"] 
 11x 
  275   Fri, 7.07.2017 21:30:51 A.Aduszkiewicz, A.LaszloFTPC gating grid observations[LIST]
[*] Gating grid diodes don't react to the
trigger signal
  
  274   Thu, 6.07.2017 22:55:24 Z.Fodor, A.LaszloStarting FTPC conditioning21:48 (A.Laszlo):
Pulser data: run 28530
Empty events: run 28531
  
  273   Thu, 15.06.2017 19:01:42 M. Kuich, P. PodlaskiTPC HV status.amplification voltage/drift voltage

[TABLE border="0" cellspacing="10"] 
 11x 
  272   Mon, 12.12.2016 08:10:51 M. KuichHV settings before shutdown   11x 
  271   Fri, 25.11.2016 22:23:54 M.Kuich, A.LaszloGating Grid closing problemThere was a problem observed about the Gating
Grid: after certain spills high currents
in all the TPCs were observed. VTPC1 Sector4
  
  270   Wed, 9.11.2016 00:21:44 A.AduszkiewiczHV settings before short shutdown between p and Pb runS2 HV: +2200V  11x 
  269   Tue, 1.11.2016 08:07:08 A.AduszkiewiczHV settings before electrical interventionS4: +2200V, set manually on a separate power
supply
 11x 
  268   Wed, 21.09.2016 18:24:21 A.AduszkiewiczHV setting snapshot HV settings after completing pi+ + C @ 60
GeV/c
 11x 
  267   Mon, 5.09.2016 12:25:33 A.AduszkiewiczVTPC-2 sector 2 amp meterVTPC-2 sector 2 current meter appears to be
broken.
  
  266   Sun, 4.09.2016 11:27:35 M. Kuich, A.AduszkiewiczTPC HV status.amplification voltage/drift voltage

[TABLE border="0" cellspacing="10"] 
  
  265   Tue, 26.07.2016 13:14:00 A.Aduszkiewicz, M.KumaraTPC HV scan26.07.2016 16:24:33 HV reference values: http://na61-elog.cern.ch/Experts+logbook/160726_132831/printscreen_265_20160726-132821.png

26.07.2016 16:26:25 HV -30V setting: http://na61-elog.cern.ch/Experts+logbook/160726_162601/printscreen_265_20160726-162551.png
 7x 
  264   Fri, 15.07.2016 17:53:12 M. KuichDrift velocity in GapTPC.15.07.2016 17:53 After QA of pilot data it
occoured that drift velocity in GapTPC is
to fast. Hence Drift field was decreased
  
  263   Sat, 2.07.2016 14:08:19 A.Aduszkiewicz, M. KuichTPC HV statusamplification voltage/drift voltage

[TABLE border="0" cellspacing="10"] 
 11x 
  262   Thu, 10.03.2016 17:39:08 A.AduszkiewiczCAEN HV module repairedModule 2 in the CAEN HV power supply (responsible
for 15 outer sectors of MTPC-R) is repaired
and has been installed again. The module
  
  261   Sun, 28.02.2016 15:05:00 T.Czopowicz, B.MaksiakLight guide for LV protectedPart of the VTPCs LV optical fiber, which
goes aside the MTPC hut and magnets has been
protected.
  
  260   Mon, 30.11.2015 08:16:44 M. KuichHV settings at the end of the run.S4 = +900V (out of the beam)  11x 
  259   Sun, 15.11.2015 15:37:28 A.Aduszkiewicz, M. KuichTPC HV statusamplification voltage/drift voltage

[TABLE border="0" cellspacing="10"] 
 printscreen_259_20151130-081547.png 
  258   Wed, 21.10.2015 08:10:42 M. KuichHV settings at the end of run.S4 HV = + 2200V  printscreen_258_20151021-081047.pngprintscreen_258_20151021-081110.pngprintscreen_258_20151021-081116.png 
  257   Tue, 13.10.2015 12:01:53 A.AduszkiewiczHV settings during the runS4 is powered with a separate power supply,
HV=+2200V
Old V1 is used as V0 (existing V0 is being
 printscreen_257_20151013-122703.pngprintscreen_257_20151013-122711.pngprintscreen_257_20151013-122719.png 
  Draft   Tue, 13.10.2015 12:01:49 A.AduszkiewiczHV settings during the run    
  255   Wed, 30.09.2015 17:07:00 M. KuichHV status - restored after elog crushamplification voltage/drift voltage

[TABLE border="0" cellspacing="10"] 
  
  254   Tue, 8.09.2015 14:36:38 E. KapturTest of the Beam CountersOld S1 and old S2 are installed.

All of the beam counters see the signal from
  
  253   Wed, 2.09.2015 17:09:38 A.AduszkiewiczCAEN HV module replacementModule 2 in the CAEN HV power supply (responsible
for 15 outer sectors of MTPC-R) seems to
be broken. We will try to replace it.
  
  252   Tue, 1.09.2015 15:44:38 M. KuichTPC HV statusamplification voltage/drift voltage

[TABLE border="0" cellspacing="10"] 
  
  250   Sat, 21.03.2015 23:18:47 T.CzopowiczS1 in DB (and java monitor)S1 counts added to the DCS database.
It can be monitored via the java monitor
(trig/S1)
  
  249   Sat, 21.03.2015 22:31:57 T.CzopowiczTrigger ratios in DB (and java monitor)Trigger ratios (T4/T1 and T2/T1) added to
the DCS database.
They can be monitored via the java monitor
  
  248   Wed, 18.03.2015 11:46:43 A.Grzeszczuk, A.AduszkiewiczMTPC-R gating pulserThe gating pulser in MTPC-R sector 23 was
repaired: chip 4001 was replaced with a new
one. Preliminary tests with pedestals show
  
  247   Tue, 3.03.2015 19:55:20 B. MaksiakE-log crashE-log crashed about 19:40 - the message at
WWW browser said "HTTP 503 - Service Temporarily
Unavailable".
  
  246   Mon, 2.03.2015 15:10:31 A. AduszkiewiczVTPC-1 LV interlockThe temperature of the VTPC-1 LV interlock
jumped up around 2AM, and then it was increasing
slowly. As we  already had problems with
 id246-2015-03-02-151218.png 
  245   Thu, 26.02.2015 13:10:23 E. KapturBeam counters HV - Ar 13A GeV/c   id245-2015-02-26-131025.png 
  244   Fri, 20.02.2015 19:01:39 Dejan JokovicProblem with TOF-R TDCshttps://na61-elog.cern.ch/TOF+logbook/27   
  243   Mon, 16.02.2015 18:11:38 S. KowalskiS4 beam onS4 is at the Ar 150 GeV/c beam with 158 GeV/c
magnetic field position: x=+6 mm (Jura side)
We had difficulty to move the counter with
  
  242   Sun, 15.02.2015 20:08:14 M. KuichDrift velocity in the Gap TPCDrift velocity measurement scan was taken
(attachment).
Value in the drift velocity monitor established
 scan.epsHV_power_supply_problems.eps 
  241   Sun, 15.02.2015 18:49:00 A. Aduszkiewicz, S.Pulawski, B. Obama, E. Kaptur on behalf of the NA61/SHINE collaborationBasic settings for Ar+Sc @ 150 AGeVBeamline settings:
https://na61-elog.cern.ch/Beam+logbook/154
  
  240   Wed, 11.02.2015 23:42:21 A. Aduszkiewicz, Z.FodorS4 and GAP TPC out of the beam23:10 A.Aduszkiewicz S4 moved to x=-16.9cm
(Saleve side). GAP TPC moved all the way
towards the Jura side (101.5cm).
  
  239   Wed, 11.02.2015 18:04:11 S. KowalskiAr run - S1 and S2The new voltage setting for S1 and s2 detectors.  id239-2015-02-11-180420.png 
  238   Tue, 10.02.2015 16:08:34 Z.fodorS4 position x=0, check beam hight markersI put the s4 counter to the no beam (x=0)
position
With the long tube water levels with Antoni
  
  237   Mon, 9.02.2015 15:27:35 A.LaszloSaving old S11 setting   id237-2015-02-09-152753.png 
  236   Fri, 6.02.2015 16:00:52 Z.FodorVTX1 power problem, dismount LMPD15:00 VTX1 Low Voltage rack could not be powered.   
  235   Tue, 3.02.2015 18:43:06 M. Kuich, T. Czopowicz, A.AduszkiewiczTPC HV statusamplification voltage/drift voltage

[TABLE border="0" cellspacing="10"] 
  
  234   Sun, 14.12.2014 17:34:15 A. Aduszkiewicz, Z.FodorBasic settings for p+Pb @ 158 GeV/c, 2014Beamline settings:
H2A.NA61.034
 10x 
  233   Mon, 8.12.2014 13:37:18 A.IvashkinPSD repairFrom 11.30 to 13.30 we replaced the thermo-electrical
controller for Peltier cooling in module
#18. Now it works.
  
  232   Wed, 19.11.2014 23:03:18 A.Laszlo, Z.FodorS1_2,S1_3,S1_4 high voltage raised
HV of S1_2,S1_3,S1_4 was raised a bit in
order to have better signal quality.
 id232-2014-11-19-230335.png 
  231   Mon, 10.11.2014 20:15:22 Z.Fodor,A.Laszlo,A.AduszkiewiczGAP TPC FE replacementTwo FE cards were replaced in the GAP TPC:
[TABLE border="1"]
old|new|location|-
  
  230   Wed, 5.11.2014 23:53:57 A.LaszloLMPD Kr calibration settings
23:49 LMPD Kr calibration begins.
Settings:
  
  229   Tue, 4.11.2014 12:05:13 K.Marton, A.LaszloLMPD FieldWire and SenseWire settings archive
The saved 2012 LMPD settings for p+Pb physics
run was: -4000V on DriftCathode, -400V on
 id229-2014-11-04-120518.png 
  228   Tue, 4.11.2014 11:23:57 Z.FodorV1 position set
V1 position is aligned.
New value of the center is x=76.3 on the
  
  227   Mon, 3.11.2014 11:32:46 Z. Fodor, A.LaszloSensor of water temperatureStephan Berry opened one valve on the HR cooling
waters. 
10:40 The sensor fixed to the tube on the
  
  226   Sun, 2.11.2014 21:37:24 O. WyszynskiS4 signalhttps://na61elog.cern.ch/Trigger+logbook/39   
  225   Fri, 31.10.2014 19:55:07 O. WyszynskiThresholds and Voltageshttps://na61elog.cern.ch/Trigger+logbook/38   
  224   Wed, 29.10.2014 11:54:24 A.AduszkiewiczTemperature sensorsIn the MTPC hut, the temperature in all sensors
showed around 21 degree Celsius, except of
MTPC-R Jura and MTPC-L Saleve. We realised
  
  223   Mon, 27.10.2014 10:35:39 A. AduszkiewiczBPD HVHV in BPD-1 and BPD-2 set to 1.5kV. BPD-3
off
  
  222   Sun, 26.10.2014 14:50:19 A.Aduszkiewicz, M.KuichTPC HV statusamplification voltage/drift voltage

[TABLE border="0" cellspacing="10"]
 b4KrGTPC.png 
  221   Sun, 26.10.2014 14:44:22 A.AduszkiewiczBPD HVBPD gas flow 1.2 l/h started on Friday.
Today I switched on the HV in BPD-1 and BPD-2,
1kV both.
  
  220   Mon, 29.09.2014 15:58:18 A.AduszkiewiczPSD moved to SalevePSD was moved all the way towards the Saleve
side, in order to be moved away from the
beam incoming on October 3.
  
  219   Sun, 21.09.2014 10:29:28 A. AduszkiewiczMTPC-L sector 3In MTPC-L sector 3 there is a high current
(50nA) with very low voltage (100V). We suspect
either the capacitor, or problem inside the
  
  218   Thu, 18.09.2014 14:18:59 A.AduszkiewiczVTPC-2 HVIn the night (4AM) the currents in VTPC-2
increased to 80nA (sector 1). We decreased
HV by 200V. It didn't help much.
  
  217   Mon, 8.09.2014 18:13:44 A.Aduszkiewicz, M.KuichTPC HV statusamplification voltage/drift voltage

[TABLE border="0" cellspacing="10"]
  
  216   Wed, 6.08.2014 11:46:48 Z. FodorPreparation to the modification in the areaWe (AA and ZF) are switched off the powers
for the racks in the area for the low voltage
creates and crates of the gating pulser.
 IMG_5791.JPG 
  215   Fri, 25.07.2014 19:08:36 E. Kaptur S.Kowalski S PulawskiLV Cable testThe Cable test was performed in two days:
24/07/2014
We discovered problems in  the counting house:
 lv_test24072014.pngtest_lv_25072014.png 
  214   Sun, 9.03.2014 19:02:22 Z. FodorGate signal for GAPTPCControlling the possibility to join the gate
signal for the new forward TPCs I realized,
the GTPC used the MAIN TPC gate voltages.
  
  213   Tue, 10.12.2013 15:13:02 M. KuichTPC HV module replacedTPC HV CAEN module No 4. replaced. Borrowed
module will be returned to Pool. NA61 module
is installed.
  
  212   Thu, 24.10.2013 16:22:22 O.PetukhovCentral DAQ config interventionO.Petukhov:

We checked the PSD reset procedure using
  
  211   Wed, 13.02.2013 08:31:53 A.AduszkiewiczHV settings at the end of the 2013 runDrift voltage:
VTPCs 13kV
MTPCs 19kV
 id211-2013-02-13-083158.pngid211-2013-02-13-084424.pngid211-2013-02-13-084447.png 
  210   Mon, 11.02.2013 12:42:31 A.IvashkinChange of termosensor position in PSDI tried to change the position of sensor in
module 32. It is strange but the temperature
is very sensetive to the senser position.
  
  209   Thu, 7.02.2013 14:24:16 A. MarcinekBasic settings for Be @ 13 AGeVBeamline settings:
https://na61db.cern.ch:8443/elog/Beam+logbook/140
 11x 
  208   Thu, 7.02.2013 14:20:55 A. MarcinekBasic settings for Be @ 30 AGeVBeamline settings:
missing
  
  207   Tue, 5.02.2013 15:58:35 A.IvashkinPSD trigger thresholdPSD trigger threshold was set to 100 mV (1V)
as before for 13 GeV Be beam 
  
  206   Fri, 25.01.2013 10:17:48 S. PulawskiPSD treshold 30 GeVYesterday night:
PSD threshold set -2.3 (measure on module)
(A.Ivashkin) - It corresponds to 230 mV
  
  205   Wed, 23.01.2013 18:13:59 O. WyszynskiPattern Unitshttps://na61db.cern.ch:8443/elog/Trigger+logbook/37   
  204   Mon, 21.01.2013 17:44:34 A.LaszloVTPC1 FEE cooling problem and repairVTPC1 FEE cooling system seems to be repaired
by Stefan Berry. He said that filter was
blocked which broke the vacuum pump. He removed
  
  203   Sun, 20.01.2013 21:10:58 D.JokovicHV distributors for TOF replacedOn TOF-L, distributor #5 in crate #1 tripped
at some time in the morning. I couldn't recover
it, then replaced it with a spare one. Also
  
  202   Fri, 18.01.2013 23:09:45   After accidental touching by termosensor of
some LEMO contact in MB34 two sections of
module #34 are very noisy (sect.#1 and sect.#8).
  
  201   Fri, 18.01.2013 18:04:05 A.Ivashkin At 17.00 we did access to area to identify
the problem with PSD adder used for PSD trigger.
It was found that analog adder in module
  
  200   Thu, 17.01.2013 18:43:26 A.IvashkinChange of termosensor position in PSDYesterday 16.01.2013 at ~11.00 a.m. we removed
the termosensor from the top module and put
it at the distributor box to check the coinsidence
  
  199   Wed, 16.01.2013 09:20:37 A. MarcinekBasic settings for Be @ 20 AGeVBeamline settings:
https://na61db.cern.ch:8443/elog/Beam+logbook/137
 11x 
  198   Tue, 15.01.2013 17:15:58 MGS4 position change to field on17:11 (MG)  S4 is moved to the Be at 19A GeV/c
position for 20 GeV/c field, i.e. to  8.4
mm
  
  197   Mon, 14.01.2013 23:07:23 S. PulawskiZ detector (after today operations)Today I concluded that signal is too small
and I decide to make one more check of Z
counter. 
 id197-2013-01-14-230956.png 
  196   Sun, 13.01.2013 22:53:19 S. PulawskiNew treshold for Z detectorI increase the treshold for Z detector.
New values are:
Z2 = -1.17V
 id196-2013-01-13-225632.png 
  195   Sun, 13.01.2013 22:29:05 S. PulawskiScan Be/All depend of trigger settings.Scan was made on standalone DAQ of Z detector:
Results:
S1 S2 V0bar    Be/All= 4.43%
  
  194   Fri, 11.01.2013 22:35:26 A.IvashkinPSD threshold for 20 GeV is 160 mVWe set PSD threshold for 20 GeV as 160 mV.
Note, that it was 100 mV for 13 GeV used
in December run. 
  
  193   Fri, 11.01.2013 20:54:29 A.Aduszkiewicz2013 TPC voltageDrift voltage:
VTPCs 13kV
MTPCs 19kV
 id193-2013-01-11-205432.png 
  192   Fri, 11.01.2013 19:41:29 S. PulawskiZ det treshholdNew Tresholds:
Q1 =-1.26 V
Q2= -2.5 V
  
  191   Fri, 11.01.2013 14:06:05 A.Laszlo20GeV/c magnetic field settings for Be 2013 runVTX1: 584.5A (set), 585.65A (measured).
VTX2: 451.2A (set), 456.19A (measured).
S4 position: 6.2mm Jura side for Be7 rigidity.
  
  190   Fri, 11.01.2013 08:16:32 S. PulawskiZ det - recover and HV settingsYesterday was find that only one PMT is working
in Z detector. Today it was checked and looks
like accidentally somebody catch the cable
  
  189   Thu, 10.01.2013 12:26:43 A. MarcinekCounter HV setting for restart of Be runTurned on V0, 4xS1, S2, S4, 2xZ with settings
shown in Att.1
 id189-2013-01-10-122829.png 
  188   Tue, 8.01.2013 11:00:06 A.AduszkiewiczTPC voltage ramping up statusamplification voltage/drift voltage
[TABLE border="0" cellspacing="10"]
      | VTPC-1   |  VTPC-2  |  MTPC-L  |
  
  187   Mon, 10.12.2012 18:55:04 O.WyszynskiPSD in pattern unitSee: https://na61db.cern.ch:8443/elog/DAQ+logbook/37   
  186   Thu, 6.12.2012 18:32:11 S. PulawskiNew Z det THSet threshold for Zdet Z2=-1.60, Z3=-3.43   
  185   Thu, 6.12.2012 12:54:38 Z. FodorS4 thresholds changed to 496mvI changed th threshold of S4 fro 384 mV to
496mV no to cut the Li, but with this 
cut we are reducing only half of the Be.
  
  184   Wed, 5.12.2012 15:54:28 Z.FodorCounter thresholdsI set the thresholds for the counters
S11, S2 V0, V1 to see all of the particles,
the MIPS as well.
  
  183   Wed, 5.12.2012 12:33:48 Z. FodorS4 positionI put the S4 to the position of Be. 6.2 mm
to Jura. Before it was on the hadron position.!!!!!!
  
  182   Tue, 4.12.2012 20:52:34 A.IvashkinPSD trigger thresholdAt 20:30 the threshould on PSD veto was set
to 100 mV. It corresponds to 5-6 nucleons
threshold. Fine tuning is required after
  
  181   Tue, 4.12.2012 20:12:09 S. KowalskiTh for ZdetSet threshold for Zdet Z2=-1.35, Z3=-3.64   
  180   Tue, 4.12.2012 17:54:40 A.AduszkiewiczTPC HV fullVoltage setting, not yet tested with the beam.  id180-2012-12-04-175444.png 