This is NA61/SHINE electronic logbook (read-only BACKUP!)

Run summary Shift logbook Run settings Beam logbook BPD logbook DAQ logbook DCS logbook Experts logbook Gas logbook TOF logbook Trigger logbook PSD logbook VD logbook Run coordination Detector Upgrade DRS logbook
  , Page 1 of 1  NA61/SHINE logo
ID Date Author Subject Text Attachments
  62   Mon, 3.08.2026 09:20:00 A. Asai2026 Liquid Nitrogen Target run[B]Data taking period:[/B]
(Thin) First run 48513, since 13/7/2026 14:33:02
(Thin) Last run 48589, until 22/7/2026 07:45:32
  
  61   Fri, 31.07.2026 12:55:47 L. Ren2026 Thin Beryllium Target RunData taking period:
First run 48670, since 7/29/2026 21:33:00
Last run 48700, ended at 8/3/2026 6:02:00
  
  60   Wed, 1.04.2026 17:09:20 B. Maksiak2026 Liquid Hydrogen Target run[B]Data taking period:[/B]
First run 48131, since 16.03.2026 12:07 (Unix:
1773659220)
 LHT_system.png 
  59   Mon, 1.12.2025 14:48:44 M. BajdaPbPb 2025 - Open Charm Run [B]Questions to Detector Supervisor:[/B]
[LIST]
[*] Save detector settings to elog from the
  
  58   Wed, 5.11.2025 14:54:20 B. Maksiak2025 Liquid Hydrogen Target run[B]Target:[/B]
Liquid hydrogen target [URL=https://edms.cern.ch/document/3293065/1]Schematics[/URL],
[URL=https://edms.cern.ch/document/3365216/1]Description[/URL]
  
  57   Tue, 1.07.2025 05:04:48 K. WojcikRun settings for oxygen run 2025Beam: oxygen 150 A GeV/c
Target: H2O
  
  56   Tue, 3.06.2025 09:50:30 K. WojcikNeutrino run 2025For detailed information look there: https://na61-elog.cern.ch/Beam+logbook/276   
  Draft   Mon, 2.12.2024 08:14:55 N. AminFragmentation RunTrigger Settings:

T1 = S1 * S2 * V1bar * S1_splitbar [charge
  
  Draft   Mon, 2.12.2024 07:54:16 N. AminRun settings for 2024 fragmentation runTrigger settings:

T1 = S1 * S2 * V1bar * S1_splitbar (charge
  
  53   Mon, 2.12.2024 04:01:54 M. Bajda2022 Pb open charm run (ongoing - still not finished)[B]Target:[/B]
[LIST]
[*] Pb (continuous) target (3mm Pb), space
 intensity_scan_2022.pdf 
  52   Mon, 2.12.2024 02:56:43 M. Bajda2023 Pb open charm run (ongoing - still not finished)[B]Target:[/B]
[LIST]
[*] Pb (continuous) target (3mm Pb), space
 HV_Screens.zip 
  51   Fri, 29.11.2024 14:57:02 B. Maksiak, M. Bajda2024 Pb open charm run (ongoing - still not finished) [B]Questions to Detector Supervisor:[/B]
[LIST]
[*] Save detector settings to elog from the
 7x 
  50   Thu, 31.10.2024 16:29:45 B. Maksiak, M. Bajda2024 pi- + C[B]Target:[/B]
[LIST]
[*] Short T2K C target 20x10 mm + 5 mm gap
 IntensityScanPiMinus.pnginteraction_probability_plot_PiC.pngTargets_Photo.jpg 
  49   Mon, 28.10.2024 14:58:10 B. Maksiak2024 pi+ + C[B]Target:[/B]
[LIST]
[*] Short T2K C target 20x10 mm + 5 mm gap
 7x 
  48   Mon, 8.07.2024 13:45:14 Y. Nagai2024 Neutrino run (proton 120 GeV/c on LBNF target)Target: LBNF prototype 150 cm (Graphite type:
Toyo-Tanso IG-510, 1.9 g/cm^3 density), Al
calibration target (7cm thick, 18cm upstream
 6x 
  48   Mon, 8.07.2024 13:45:14 Y. Nagai2024 Neutrino run (proton 120 GeV/c on LBNF target)Target: LBNF prototype 150 cm (Graphite type:
Toyo-Tanso IG-510, 1.9 g/cm^3 density), Al
calibration target (7cm thick, 18cm upstream
 6x 
  47   Mon, 16.10.2023 19:10:36 Pawel StaszelNew ALPIDE thesholdsON 12.10.2023 evening the ALPIDE thresholds
were adjusted. It was done just after we
finished taking the geometry tuning runs
  
  46   Sun, 8.10.2023 13:51:05 P. Podlaski2023 Pb run[COLOR=red][SIZE=6]Discovered problems by
run:[/SIZE][/COLOR]
run 43448 to 43478 no S1_1 in DRS, TOF probably
  
  45   Thu, 13.07.2023 17:04:49 Y. Nagai, L. RenKaon + Carbon @ 60 GeV/c RunTarget: Carbon target (1+2)

Beam: kaon
  
  44   Sun, 9.07.2023 09:28:22 Y. Nagai, L. RenTotal Cross Section Run kaon + Ti @ 60 GeV/c    
  43   Sun, 9.07.2023 09:28:09 Y. Nagai, L. RenTotal Cross Section Run proton + Ti @ 60 GeV/c     
  42   Sun, 9.07.2023 09:27:20 Y. Nagai, L. RenTotal Cross Section Run pion + Ti @ 60 GeV/c    
  41   Sat, 8.07.2023 15:00:34 Y. Nagai, L. Ren60 GeV beam composition scan with full MFTarget: no target (Carbon target in OUT position)

Beam: kaon
  
  40   Tue, 26.07.2022 11:46:25 Y. Nagai, M. FriendT2K replica target run, full MF field (158 GeV field) Target: no target (T2K replica target in OUT
position)
  
  39   Tue, 26.07.2022 11:28:30 Y. Nagai, M. Friend T2K replica target run, 1/8 MF field (20 GeV field) Target: T2K replica 90 cm (New replica target
"C" produced in 2022)
  
  38   Tue, 26.07.2022 10:40:55 Y. Nagai, M. Friend, J. Depp and A.HeardT2K replica target run, half MF field (80 GeV field)Target: T2K replica 90 cm (New replica target
"C" produced in 2022)
  
  37   Fri, 30.11.2018 15:43:08 LajkaRun settings for Pb+Pb @ 150A GeV/cTarget: Pb 3mm (some runs with 2mm)

[B]Beam:[/B] Pb
  
  36   Mon, 16.07.2018 12:04:09  Run settings for p+NOvA replica @ 120 GeV/cTarget: NOvA replica 130 cm (Fermilab 2018)

[B]Beam:[/B] p
  
  35   Fri, 8.12.2017 12:18:15  Run settings for Xe+La @ 13A GeV/cTarget: La 3 mm (Ki Vihao, purchased in 2014,
cut in 2017)
 11x 
  34   Fri, 8.12.2017 12:17:57  Run settings for Xe+La @ 40A GeV/cTarget: La 3 mm (Ki Vihao, purchased in 2014,
cut in 2017)
  
  33   Thu, 23.11.2017 18:18:37  Run settings for Xe+La @ 30A GeV/cOn November 22 there was a risk of a power
glitch due to works on the electrical emergency
switch (AUG). We switched off magnets, and
  
  32   Mon, 13.11.2017 11:31:33  Run settings for Xe+La @ 19A GeV/c

Target: La 3 mm (Ki Vihao, purchased in 2014,
 11x 
  31   Mon, 6.11.2017 20:13:52  Run settings for Xe+La @ 75A GeV/cTarget: La 3 mm (Ki Vihao, purchased in 2014,
cut in 2017)
 11x 
  30   Fri, 3.11.2017 11:12:26  Run settings for Xe+La @ 150 GeV/cTarget: La 3 mm (Ki Vihao, purchased in 2014,
cut in 2017)
 11x 
  29   Fri, 20.10.2017 11:53:44 A.Marcinek, A.Aduszkiewicz, A.BanderasRun settings for p+Pb @ 40 GeV/cTarget: Pb 5 mm (American Elements, same as
for p+Pb in 2016)
 11x 
  28   Mon, 4.09.2017 15:52:31  Run settings for neutrino physics p+C @ 90 GeV/cTarget: Carbon 14.8 mm (samples 1 and 2).

Beam: p
  
  27   Mon, 4.09.2017 15:52:24  Run settings for neutrino physics p+Be @ 120 GeV/cTarget: Beryllium 14.8 mm (samples 1 and 2).

Beam: p
  
  26   Mon, 4.09.2017 15:52:14  Run settings for neutrino physics p +C @ 120 GeV/cTarget: Carbon 14.8 mm (samples 1 and 2).

Beam: p
  
  25   Mon, 4.09.2017 15:51:58  Run settings for neutrino physics pi- +C @ 60 GeV/cTarget: Carbon 14.8 mm (samples 1 and 2).

Beam: pi-
  
  24   Fri, 11.08.2017 12:37:13  Run settings for neutrino physics pi+ +C @ 30 GeV/cTarget: Carbon 14.8 mm (samples 1 and 2).

Beam: pi+
 11x 
  23   Tue, 8.08.2017 18:40:00  Run settings for neutrino physics p+Al @ 60 GeV/cTarget: Aluminium 14.8 mm (samples 1 and 2).

Beam: pi+
  
  22   Sun, 2.07.2017 10:21:28 Heinrich Ignaz Franz Biber and crying AntoniPhysics data, p+Pb 30 GeV/cTarget: Pb 5 mm (American Elements same as
for p+Pb in 2016)
  
  21   Sun, 11.12.2016 18:09:58 Mickey MousePhysics data, Pb+Pb 150A GeV/cTarget: Pb 1 mm (American Elements sample
#1)
  
  20   Sun, 4.12.2016 11:53:12 S.Pulawski, E.Kaptur, A.Snoch, B. Maksiak, A.Aduszkiewicz, A.Schwarzenegger on behalf of the NA61/SHINE CollaborationRun settings for Pb+Pb at 30A GeV/cTarget: Pb 1 mm (American Elements sample
#1)
  
  19   Tue, 22.11.2016 17:38:28 S.Pulawski, E.Kaptur, A.Aduszkiewicz, Jackie Chan on behalf of the NA61/SHINE CollaborationRun settings for Pb+Pb at 13A GeV/cTarget: Pb 1 mm (American Elements sample
#1)
  
  18   Tue, 25.10.2016 17:34:55 A. Marcinek, P. Podlaski, A. Aduszkiewicz, H. Potter on behalf of the NA61/SHINE collaborationRun settings for p+p @ 400 GeV/cTarget: LHT 20.92 mm

Beam: p
  
  17   Sun, 9.10.2016 12:02:02 E. Kaptur, A. Aduszkiewicz, L. Kaczynski on behalf of the NA61/SHINE collaborationRun settings for neutrino physics pi+Be @ 60 GeV/cTarget: Beryllium 14.8 mm (samples 1 and 2).

Beam: pi+
  
  16   Sun, 9.10.2016 12:00:52 E. Kaptur, A. Aduszkiewicz, Andrey on behalf of the NA61/SHINE collaborationRun settings for neutrino physics p+Be @ 60 GeV/cTarget: Beryllium 14.8 mm (samples 1 and 2).

Beam: p
  
  15   Tue, 4.10.2016 10:08:12 E. Kaptur, A. Aduszkiewicz, H. Clinton on behalf of the NA61/SHINE collaborationRun settings for neutrino physics p+Al @ 60 GeV/cTarget: Aluminium 14.8 mm (samples 1 and 2).

Beam: p
  
  14   Tue, 27.09.2016 11:29:35 E. Kaptur, A. Aduszkiewicz, D.Trump on behalf of the NA61/SHINE collaborationRun settings for neutrino physics p+C @ 120 GeV/cTarget: Carbon 14.8 mm (samples 1 and 2).

Beam: p
  
  13   Wed, 21.09.2016 18:09:38 E. Kaptur, A. Aduszkiewicz, I.D.Know on behalf of the NA61/SHINE collaborationRun settings for neutrino physics pi++C @ 60GeV/cTarget: Carbon 14.8 mm (samples 1 and 2).

Beam: pi+
  
  12   Wed, 20.07.2016 17:47:54 M. Kuich, J. Page, E. Kaptur on behalf of the NA61/SHINE collaborationRun settings for neutrino physics p+C @ 60GeV/cTarget: Carbon 20 mm (T2K target).

Beam: protons
  
  11   Mon, 18.07.2016 17:21:50 M. Kuich, F. Mercury, E. Kaptur on behalf of the NA61/SHINE collaborationRun settings p+Pb @ 80GeV/cTarget: Lead 5 mm

Beam: protons
  
  Draft   Sat, 16.07.2016 17:36:22 A.Aduszkiewicz, M.Kuich, P. Podlaski, J.Hendrix2015 Basic settings for Pb @ 30 AGeVBeamline settings:
??
  
  9   Mon, 30.11.2015 08:27:03 A.Aduszkiewicz, M.Kuich, J.Morrison2015 Basic settings for Pb @ 30 AGeVBeamline settings:
Beam file on beam computer
  
  Draft   Mon, 30.11.2015 08:26:58 A.Aduszkiewicz, M.Kuich, J.Morrison2015 Basic settings for Pb @ 30 AGeVBeamline settings:
Beam file on beam computer
  
  7   Tue, 13.10.2015 11:50:33 E.Kaptur, A.Aduszkiewicz, M.Davis2015 Basic settings for pi+ USNA61 @ 31 AGeV Beamline settings:
Beam file on beam computer
  
  6   Thu, 1.10.2015 08:47:20 S.Pulawski2015 Basic settings for Ar+Sc @ 75 AGeV Beamline settings:
Beam file on beam computer
  
  5   Wed, 25.03.2015 15:54:42 A. Aduszkiewicz, S.Pulawski, B. Obama2015 Basic settings for Ar+Sc @ 40 AGeVBeamline settings:
https://na61-elog.cern.ch/Beam+logbook/159
  
  4   Tue, 17.03.2015 10:03:12 A. Aduszkiewicz, S.Pulawski, M.Kuich, B. Obama2015 Basic settings for Ar+Sc @ 30 AGeVBeamline settings:
https://na61-elog.cern.ch/Beam+logbook/157
  
  3   Wed, 4.03.2015 18:48:04 A. Aduszkiewicz, S.Pulawski, B. Obama2015 Basic settings for Ar+Sc @ 19 AGeV Beamline settings:
https://na61-elog.cern.ch/Beam+logbook/156
  
  2   Thu, 26.02.2015 13:08:44 A. Aduszkiewicz, S.Pulawski, B. Obama, E. Kaptur on behalf of the NA61/SHINE collaboration 2015 Basic settings for Ar+Sc @ 13 AGeV Beamline settings:
https://na61-elog.cern.ch/Beam+logbook/155
  
  1   Thu, 26.02.2015 13:05:34 A. Aduszkiewicz, S.Pulawski, B. Obama, E. Kaptur on behalf of the NA61/SHINE collaboration 2015 Basic settings for Ar+Sc @ 150 AGeV Beamline settings:
https://na61-elog.cern.ch/Beam+logbook/154
  
ELOG V3.1.3-7933898