This is NA61/SHINE electronic logbook (read-only BACKUP!)

Run summary Shift logbook Run settings Beam logbook BPD logbook DAQ logbook DCS logbook Experts logbook Gas logbook TOF logbook Trigger logbook PSD logbook VD logbook Run coordination Detector Upgrade DRS logbook
  Logbook for trigger experts  NA61/SHINE logo
Message ID: 94     Entry time: Mon, 8.12.2025 09:17:33
Author: J.Szewinski 
Subject: Trigger shutdown 
Trigger crate has been turned off, S3 and S1-4 signals has been switched back to their original positions.
Attachment 1 shows signals switched, as it was used during the run, Attachment 2 shows the nominal configurations, which has been now restored.
Attachment 1: 20251208_091057.jpg  834 kB  | Hide | Hide all
20251208_091057.jpg
Attachment 2: 20251208_091222.jpg  796 kB  | Hide | Hide all
20251208_091222.jpg
ELOG V3.1.3-7933898