This is NA61/SHINE electronic logbook (read-only BACKUP!)

Run summary Shift logbook Run settings Beam logbook BPD logbook DAQ logbook DCS logbook Experts logbook Gas logbook TOF logbook Trigger logbook PSD logbook VD logbook Run coordination Detector Upgrade DRS logbook
  Logbook for trigger experts  NA61/SHINE logo
Message ID: 67     Entry time: Fri, 9.09.2016 15:38:04
Author: E. Kaptur 
Subject: Pi+ beam at 60 GeV/c 
No timing corrections needed.

10.09.2016 10:53:00 (EK) V1 signal is much lower due to magnetic field, I have corrected the trigger threshold. S4 signal did not change.
ELOG V3.1.3-7933898