Message ID:
67
Entry time:
Fri, 9.09.2016 15:38:04
Author:
E. Kaptur
Subject:
Pi+ beam at 60 GeV/c
No timing corrections needed.
10.09.2016 10:53:00 (EK) V1 signal is much lower due to magnetic field, I have corrected the trigger threshold. S4 signal did not change.