Fri, 25.11.2016 01:51:56, S. Pulawski, E.Kaptur, Pb+Pb at 30A GeV/c  
|
Tue, 22.11.2016 17:49:02, S. Pulawski, E.Kaptur, Pb+Pb at 13A GeV/c   
|
Fri, 28.10.2016 21:30:03, A. Marcinek, p@400 beam: degradation of V0/S1 6x
|
Thu, 27.10.2016 20:19:12, A. Marcinek, p@400: intensity scan 
|
Thu, 27.10.2016 12:07:43, A. Marcinek, p@400 : V1 ADC vs beam after Y shift of V1   
|
Wed, 26.10.2016 17:14:07, A. Marcinek, p@400 beam tuning after Adrian finished with the spill structure 12x
|
Tue, 25.10.2016 22:21:30, A. Marcinek, p@400 beam: tried to improve spill structure  
|
Thu, 20.10.2016 09:32:14, E. Kaptur, A. Marcinek, protons at 400 GeV/c 11x
|
Fri, 14.10.2016 17:23:00, E. Kaptur, proton beam at 120 GeV/c (CEDAR)  
|
Sun, 9.10.2016 11:06:32, E. Kaptur, Pi+ beam at 60 GeV/c, Beryllium target    
|
Tue, 4.10.2016 16:42:47, ,
|
Tue, 4.10.2016 10:05:19, E. Kaptur, Proton beam at 60 GeV/c 8x
|
Wed, 21.09.2016 21:19:55, E. Kaptur, proton beam at 120 GeV/c    
|
Tue, 13.09.2016 14:45:05, E. Kaptur, Beam pipe moved 3.5 mm down at V1   
|
Wed, 7.09.2016 15:10:26, E. Kaptur, Pi+ beam at 60 GeV/c   
|
Tue, 26.07.2016 12:38:53, E. Kaptur, proton beam 60 GeV/c    
|
Tue, 26.07.2016 12:32:29, E. Kaptur, proton beam 80 GeV/c    
|
Thu, 26.05.2016 21:56:03, S. Pulawski, muon beam 158 GeV/c protons for PSD  
|
Mon, 23.11.2015 12:54:30, S. Pulawski, E. Kaptur, QUAD SCAN for pb at 30A GeV 8x
|
Thu, 19.11.2015 18:08:23, E. Kaptur, S. Pulawski, B Lysakowski, Beam settings for Pb run 30A GeV/c
|
Sun, 18.10.2015 20:34:13, E. Kaptur, Retuning for K+ beam at 60 GeV/c 
|
Thu, 15.10.2015 08:33:45, E. Kaptur, Setting up 60 GeV/c positive hadron beam 6x
|
Mon, 12.10.2015 17:34:11, E. Kaptur, Some fine scanning
|
Sat, 10.10.2015 21:46:14, E. Kaptur, M. Kuich, Beam focusing after SPS changes    
|
Sat, 10.10.2015 12:01:25, E. Kaptur, 31 GeV beam focusing  
|
Fri, 9.10.2015 21:14:50, A. Wilczek, 31 GeV/c V0 -> V0 and realignment   
|
Fri, 9.10.2015 15:25:53, A. Wilczek, 31 GeV/c setting 18x
|
Thu, 8.10.2015 10:55:08, A. Wilczek, 30 V0 position (JUNK)   
|
Thu, 8.10.2015 10:18:45, A. Wilczek, 30 GeV beam tuning (MOSTLY JUNK) 16x
|
Fri, 18.09.2015 23:05:12, E. Kaptur, CEDAR scan 7x
|
Tue, 15.09.2015 21:53:32, E. Kaptur, Beam settings from 15.09.2015 evening  
|
Fri, 20.03.2015 17:08:08, S. Pulawski, Ar 40A Gev/c
|
Fri, 20.03.2015 16:58:05, S. Pulawski, Focus study on our BPDs Ar@40 GeV/c  
|
Tue, 10.03.2015 19:27:24, S. Pulawski, Ar 30A Gev/c 6x
|
Tue, 3.03.2015 23:16:31, S. Pulawski, Ar 19A GeV/c    
|
Tue, 24.02.2015 11:41:37, S. Pulawski, Ar 13A Gev/c   
|
Sun, 15.02.2015 18:22:30, S. Pulawski, Argon beam at 150A GeV/c (hopefuly final settings) 
|
Wed, 11.02.2015 19:32:34, S. Pulawski, Argon beam at 150A GeV/c   
|
Wed, 11.02.2015 18:06:02, S. Kowalski, Ar run - S1 and S2
|
Wed, 10.12.2014 22:35:34, A. Wilczek, Settings after MD - final 8x
|
Wed, 3.12.2014 21:34:01, A. Wilczek, Final settings after MD 9x
|
Sat, 29.11.2014 08:23:20, A. Wilczek, Unstable beam 6x
|
Wed, 26.11.2014 18:37:19, A. Wilczek, Values after MD 9x
|
Mon, 24.11.2014 08:06:58, A. Wilczek, New Collimator settings 
|
Wed, 19.11.2014 23:52:35, A. Wilczek, Final settings after MD 7x
|
Wed, 19.11.2014 19:09:34, A. Wilczek, Raw parameters after MD    
|
Thu, 13.11.2014 15:32:09, S. Pulawski, Beam settings for p+Pb at 158 GeV/c 8x
|
Mon, 27.10.2014 17:13:44, S. Pulawski, PSD h+ beam settings 
|
Tue, 5.02.2013 16:22:07, S. Pulawski, Be+Be@13 trim scan and final settings  
|
Fri, 25.01.2013 01:10:35, S. Pulawski, 30 Gev Settings Be+Be
|
Wed, 16.01.2013 19:02:53, S. Pulawski, New colimattor settings
|
Tue, 15.01.2013 18:11:01, S. Pulawski, Hopefuly final settings for 20 GeV field on... 7x
|
Mon, 14.01.2013 23:39:10, S. Pulawski, Trim scans V1 counter 14x
|
Sun, 13.01.2013 14:54:23, A. Marcinek, Be 20GeV tuning by Ilias
|
Fri, 11.01.2013 01:30:15, A. Marcinek, Be optimisation by Adrian and Herbert
|
Thu, 13.12.2012 00:35:04, S. Pulawski, Adrian beam tunning and T2 target changed for 18 cm 
|
Wed, 5.12.2012 22:31:22, Many, improving the trigger rate by removing vetoes
|
Wed, 5.12.2012 01:23:55, A. Marcinek, trigger rates for 13GeV Be test run 
|
Tue, 4.12.2012 23:57:34, Herbert, SPS beam steering on T2 (scan of T2) 
|
Tue, 4.12.2012 06:01:18, S. Pulawski, Trim scan 13 GeV
|
Sat, 29.09.2012 17:12:34, A. Marcinek, beam steering after getting back a stable beam from SPS
|
Sat, 29.09.2012 11:00:02, A. Marcinek, beam problems
|
Sat, 22.09.2012 18:09:45, A. Marcinek, fine tuning p158 beam 
|
Fri, 21.09.2012 11:34:00, A. Marcinek, restarting beam for pPb@158    
|
Thu, 20.09.2012 18:29:41, Zoltan Fodor, Started pressure on the CEDAR
|
Sat, 4.08.2012 17:46:35, A. Marcinek, Increased intensity of Kaon beam
|
Mon, 30.07.2012 19:41:01, A. Wilczek, 158 h- beam 14x
|
Thu, 26.07.2012 23:01:09, A. Wilczek, 120 GeV/c p, T2.002 - REFERENCES 12x
|
Thu, 26.07.2012 06:28:01, A. Wilczek, 120 GeV/c p, T2.002 - continuation + SCANS with magnet on. 9x
|
Thu, 26.07.2012 02:54:19, A. Wilczek, 120 GeV/c p. T2.002 wobbling (H2@0mrad +150) SCANS w/o field 11x
|
Wed, 25.07.2012 10:17:24, R.Planeta, last quadrupole
|
Mon, 16.07.2012 18:40:24, A. Wilczek, 158 GeV/c p: Field 160. Parameters after all-day intervetion in the North Area 9x
|
Mon, 16.07.2012 18:11:11, A. Wilczek, Quadrupole QUAD18 problem 
|
Fri, 13.07.2012 00:45:03, A. Wilczek, T2/T1 ratio tuning. 9x
|
Thu, 12.07.2012 05:06:11, A. Wilczek, 158 GeV/c p: Field 160. Tuning - after the screws by s4 rail were tightened FINAL 10x
|
Wed, 11.07.2012 22:17:26, A. Wilczek, 158 GeV/c p: Field 160. Tuning - new initial conditions (BEND01) and scans 14x
|
Wed, 11.07.2012 21:00:00, A. Wilczek, 158 GeV/c p: Field 160. Tuning - initial conditions and scans 9x
|
Fri, 29.06.2012 21:36:50, A. Wilczek, 158 GeV/c p: Tuning 14x
|
Fri, 29.06.2012 14:09:52, A. Wilczek, 158 GeV p 11x
|
Mon, 25.06.2012 07:18:14, A. Marcinek, counter and BPD HV for MD
|
Sun, 24.06.2012 14:43:24, A.Laszlo, Cedar rates    
|
Sat, 23.06.2012 22:52:15, A. Marcinek, A. Wilczek, Continuation 9x
|
Sat, 23.06.2012 10:39:00, A. Marcinek, A. Wilczek, 120 GeV/c p: Setup 14x
|
Fri, 22.06.2012 19:43:18, P. Carriere, A. Wilczek, CEDAR scan 
|
Fri, 22.06.2012 14:25:25, A. Marcinek, A. Wilczek, 158 GeV/c h+: Fine tuning 11x
|
Thu, 21.06.2012 09:35:47, A. Wilczek, 158 GeV/c Muon beam: settings  
|
Wed, 20.06.2012 19:26:06, A. Wilczek, A. Marcinek, 158 GeV/c h+ beam alignment 6x
|
Wed, 20.06.2012 18:05:12, A. Marcinek, counter HV
|
Tue, 19.06.2012 18:28:50, A. Wilczek, 158 GeV/c h+: New settings after beam intensity increased   
|
Tue, 19.06.2012 17:45:50, A. Wilczek, 158 GeV/c h+: Temporary setting for PSD calibration 11x
|
Tue, 6.12.2011 18:51:21, A. Marcinek, S. Pulawski, Primary Pb 80AGeV beam
|
Wed, 30.11.2011 23:07:36, A. Marcinek, S. Pulawski, New magnets setings for Be beam at 40 GeV. V0 off.
|
Tue, 29.11.2011 18:03:54, S. Pulawski, optimalization of Be beam at 40GeV    
|
Tue, 29.11.2011 17:57:18, S. Pulawski, Illias advise to optimalize Be beam at 40 GeV
|
Sat, 26.11.2011 01:09:35, S. Pulawski, Restored Be beam at 75A GeV/c
|
Tue, 22.11.2011 10:45:14, A. Marcinek, S. Pulawski, 80 AGeV Be beam tunning 12x
|
Tue, 22.11.2011 02:43:25, S. Pulawski, Settings for 80A GeV/c Be beam
|
Fri, 18.11.2011 13:52:51, A. Marcinek, S. Pulawski, magnet, collimator status
|
Tue, 15.11.2011 21:01:31, A. Marchionni A. Marcinek, S. Pulawski, trim scans for Be beam 158 GeV 7x
|
Tue, 15.11.2011 12:50:36, A. Marcinek, Beam tuning
|
|