Message ID: 284     Entry time: Sun, 30.11.2025 12:29:47
Author: K. Wojcik 
Subject: Pb 2025 run setup 
Material in counters:
  • S1: quartz, 80 x 80 x 2 mm
  • S2: quartz, 40 x 40 x 2 mm
  • V0: scintillator, 40 x 40 x 5 mm, hole: circle, diameter = 5 mm
  • V1: scintillator, 80 x 80 x 5, hole: circle, diameter = 8 mm.
  • S3: scintillator, width = 15 mm, thickness = 1 mm, length = ~200 mm. It is covered by thin teflon tape, below 0.2 mm in total.

Counter voltages and thresholds
  • S1_1: -1250 V, threshold: 120 mV
  • S1_2: -1400 V, threshold: 120 mV
  • S1_3: -1200 V. threshold: 120 mV
  • S1_4: -1350 V, threshold: 120 mV
  • S2: - 620 V, threshold: 250 mV
  • V0: - 600 V, threshold: 100 mV
  • V1: - 600 V, threshold: 50 mV
  • S3: +1700 V, threshold: 230 mV

Counter positions (relative, displayed on movement controllers)
  • S2: 83.2
  • V0: 86.5
  • V1: 52
  • S3: +6 mm (Jura)
Maximum safe V1 position is 64! Do not exceed this value to avoid hitting the pipe wall with scintillator.

Trigger definitions:
(positive, vetoed)

  • T1 = S1 * S2 * V0 * V1, scaler = 100
  • T2 = T1 * S3, scaler = 1
  • T3 = S1 * S2, scaler = 1000
  • T4 = S3, scalers = 0

Typical count rates:
  • S1
  • L2
  • T2/T1
Attachment 1: v0_scan_30_11_2025.png  243 kB  Uploaded Sun, 30.11.2025 15:05:50  | Hide | Hide all
v0_scan_30_11_2025.png
Attachment 2: v1_scan_30_11_2025.png  219 kB  Uploaded Sun, 30.11.2025 15:39:42  | Hide | Hide all
v1_scan_30_11_2025.png
Attachment 3: V0_scan_2025_12_01_19_30.png  310 kB  Uploaded Mon, 1.12.2025 19:29:48  | Hide | Hide all
V0_scan_2025_12_01_19_30.png
Attachment 4: S3_scan_2025_12_01_20_00.png  362 kB  Uploaded Mon, 1.12.2025 20:01:44  | Hide | Hide all
S3_scan_2025_12_01_20_00.png
Attachment 5: V0_scan_2025_12_02_02_00.png  324 kB  Uploaded Tue, 2.12.2025 01:59:08  | Hide | Hide all
V0_scan_2025_12_02_02_00.png
Attachment 6: CESAR_GUI_10.1.22_01-Dec-25_19-17-25.png  238 kB  Uploaded Tue, 2.12.2025 02:13:29  | Hide | Hide all
CESAR_GUI_10.1.22_01-Dec-25_19-17-25.png
Attachment 7: V1_scan_2025_12_07_23_29_FieldOff.png  511 kB  Uploaded Sun, 7.12.2025 23:29:59  | Hide | Hide all
V1_scan_2025_12_07_23_29_FieldOff.png
Attachment 8: S3_scan_2025_12_07_23_39_FieldOff.png  525 kB  Uploaded Sun, 7.12.2025 23:39:22  | Hide | Hide all
S3_scan_2025_12_07_23_39_FieldOff.png
Attachment 9: printscreen_284_20251207-235949.png  272 kB  Uploaded Mon, 8.12.2025 00:00:03  | Hide | Hide all
printscreen_284_20251207-235949.png
Attachment 10: V0_Scan_2025_12_08_00_13.png  520 kB  Uploaded Mon, 8.12.2025 00:13:33  | Hide | Hide all
V0_Scan_2025_12_08_00_13.png
ELOG V3.1.3-7933898