21.11.2017 about 6:30 AM: After access beam moved by 8mm on BPD1y. Tuned BEND03 222.6 -> 223.3

21.11.2017 13:20:23 AM: Intensity on S1 is too small (85k) -> Opened collimators and changed BEND03 223.3 -> 223.0. This gives S1 about 130k for T2 intensity 54x10^8 (yesterday T2 was 64x10^8?)

24.11.2017 09:53:13 AM: Beam is too high on BPD1y and too high on XWCA.021.387. BEND03 222.4 -> 222.2 This changed BPD1y from 0.22 to -0.10. S2/S1 changed from 80% to 95%